Difference between revisions of "Main Page"

From HL7 TSC
Jump to navigation Jump to search
Line 12: Line 12:
 
* [http://gforge.hl7.org/gf/project/tsc/frs/ Link to current list of HL7 Projects]
 
* [http://gforge.hl7.org/gf/project/tsc/frs/ Link to current list of HL7 Projects]
 
* [http://healthlevelseven.projectinsight.net Link to Project Insight]
 
* [http://healthlevelseven.projectinsight.net Link to Project Insight]
* [http://www.hl7.org/Library/Committees/arb/HL7_Project_Scope_Statement_2009MAY.zip Project Scope Statement Template]
+
* [http://www.hl7.org/permalink/?ProjectScopeStatement Project Scope Statement Template]
 
* [http://www.hl7.org/library/committees/tsc/Work%20Group%20Agenda%20Icons.zip Agenda icons for Work Group Meetings]
 
* [http://www.hl7.org/library/committees/tsc/Work%20Group%20Agenda%20Icons.zip Agenda icons for Work Group Meetings]
 
*[[Work Group Organizing Document Summary]] (Mission and Charter, DMP, SWOT, and Three-Year Plan tracking)
 
*[[Work Group Organizing Document Summary]] (Mission and Charter, DMP, SWOT, and Three-Year Plan tracking)
Line 75: Line 75:
  
 
* [http://www.hl7.org/Library/Committees/tsc/docs/GeneralizedRulesforConstructingHL7BallotandStandardsName.doc Guidelines for Constructing Ballot Document Titles]
 
* [http://www.hl7.org/Library/Committees/tsc/docs/GeneralizedRulesforConstructingHL7BallotandStandardsName.doc Guidelines for Constructing Ballot Document Titles]
* Process for formalising joint SDO work -- in process -- see issues
+
* Process for formalising joint SDO work: see [http://www.hl7.org/participate/isojic.cfm HL7's Collaboration with ISO and JIC] from the HL7.org web page, under Participate/Balloting
 
* [http://gforge.hl7.org/gf/download/docmanfileversion/181/1255/Out_of_cycle_ballot_guidelines20080602.doc Out-of-Cycle ballot criteria]
 
* [http://gforge.hl7.org/gf/download/docmanfileversion/181/1255/Out_of_cycle_ballot_guidelines20080602.doc Out-of-Cycle ballot criteria]
 
*[http://www.hl7.org/documentcenter/public/membership/ANSI_proposal_withdrawal.doc Request template to withdraw proposed ANS] - when a work group has balloted a standard at DSTU, informative, or normative ballot, and decides the standard will be withdrawn, the withdrawal form is needed for ANSI notification.
 
*[http://www.hl7.org/documentcenter/public/membership/ANSI_proposal_withdrawal.doc Request template to withdraw proposed ANS] - when a work group has balloted a standard at DSTU, informative, or normative ballot, and decides the standard will be withdrawn, the withdrawal form is needed for ANSI notification.

Revision as of 16:09, 28 January 2010

This is the Main Page of the HL7 TSC Wiki, supporting Health Level Seven International, Inc. (HL7). The HL7 TSC Wiki is used to support the HL7 Technical Steering Committee. The contents of this Wiki are non binding; see the HL7 website for persistent documents (minutes, standards, etc.). The HL7 TSC Wiki currently has 1,787 pages with substantive content. See articles from the main HL7 Wiki on Basic Editing and Help Resources for information about editing the Wiki. To access information, either use the search option or jump to the section of interest in the table of contents links as shown below.

TSC Information

Working Group Projects

Working Group Project information

TSC Projects

  • Approved Projects:
    1. Enterprise Architecture Implementation Project
    2. Product Visibility Project at TSC Tracker [1] Project Scope Statement
      • HL7 Wiki Product List
      • Objectives:
        • Identify the HL7 Products
        • Create HL7 Products List
        • Create HL7 “Product Brief” Template
        • Publish HL7 Products List
        • Identify governance for HL7 Products List maintenance (initial approval and ongoing maintenance)
        • Evaluate user perception of HL7 Product Visibility

ISO Ballot Projects

TSC Documents

TSC Process Documents

Sufficient justification should be provided to describe effort in progress to move the standard towards a normative ballot, such as evidence of current trial activity, if they have a credible expectation that a normative document will be produced within a requested timeframe, given that trials are currently underway. The request must include the length of time required to extend the DSTU, including conclusion of the pilot and subsequent balloting activity...If you send the completed form to me (LynnL) I can put it on the TSC agenda.

TSC Templates

TSC Defining Documents

HL7 Product Information

  • List of ANSI approved standards is available at [2]
  • List of current DSTUs is available at [3]

Technical Newsletters

ArB and Steering Division Content

ArB Home

Foundation & Technology Steering Division Home

Domain Experts Steering Division Home

Structure & Semantic Design Steering Division Home

Technical & Support Services Steering Division Home

Documents

Initial draft - Generic SD Decision Making Practices

Selected Archive of T3F Information

Related Resources

Contacts