Difference between revisions of "Concall-20090330"
Jump to navigation
Jump to search
Line 43: | Line 43: | ||
## [http://wiki.hl7.org/index.php?title=EA_IP EA IP] Update - Marc Koehn | ## [http://wiki.hl7.org/index.php?title=EA_IP EA IP] Update - Marc Koehn | ||
## CEO Report - | ## CEO Report - | ||
− | ## CTO Report - | + | ## CTO Report - [http://hl7projects.hl7.nscee.edu/docman/view.php/52/1952/CTO_report03-30.doc] |
## ArB Report - | ## ArB Report - | ||
## Affiliates Report - | ## Affiliates Report - |
Latest revision as of 15:07, 30 March 2009
TSC - Technical Steering Committee
Monday, March 30, 2009 11:00 AM (US Eastern Time, GMT -5) To participate, dial 770-657-9270 and enter pass code 124466# GoToMeeting at https://www.gotomeeting.com/join/165215206 GoToMeeting ID: 165-215-206
back to TSC Minutes and Agendas
Contents
Attendance
Expected
- Chair: Charlie McCay
- CTO: John Quinn
- Domain Experts: Austin Kreisler (primary), Ed Tripp (alternate)
- Foundation & Technology: Ioana Singureanu (primary), Woody Beeler (alternate)
- Structure & Semantic Design: Calvin Beebe (primary), Gregg Seppala (alternate)
- Technical & Support Services: Ken McCaslin (primary), Helen Stevens Love (alternate)
- Affiliate: Ravi Natarajan
- ARB: Charlie Mead (primary), John Koisch (alternate)
- HQ: Karen Van Hentenryck, Lynn Laakso
Invited
- Charles Jaffe (CEO)
- Ed Hammond (HL7 Chair); Bob Dolin (HL7 Vice Chair)
- Marc Koehn (EA IP)
- Jim McCain
Apologies
- Ken McCaslin
- Ioana Singureanu
Agenda
- (5 min) Meeting Admin
- Roll Call -
- Accept Agenda -
- Approve Minutes from 2009-03-23_TSC_Call_Minutes –
- Review action items –
- Options for interim/temporary co-chair in Kyoto - Lynn
- For the DESD meeting, DESD DMPs explicitly state that for quorum, the "chair (or designate) and Co-chairs representing at least half the constituents must be present". This clearly allows for a 'designated chair' for the DESD meeting.
- For the TSC meeting,
- Option: do nothing, i.e. plan to achieve quorum without representation by one SD. The TSC DMPs define quorum as the "chair (or designate) and at least five other TSC members must be present, including at least two of the four elected Steering Division representatives". This definition could be strictly interpreted as a "TSC Member" must be an "elected Steering Division representative (or their alternate)".
- Option: Add an ad-hoc member to the TSC for a short duration. The GOM allows the provision that "Should the TSC identify an imbalance or the need for specific expertise, they may vote to include an ad hoc member to correct the situation." The ad hoc member’s term is at the discretion of the TSC (up to two years), so could theoretically last only one week if needed. This ad-hoc member counts towards quorum but not as one of the two required SD reps.
- Option: Add a time-limited proxy clause to the TSC DMPs. We could change the DMPs (a reusable mechanism) to allow for a proxy to represent the SD. The DESD would have to elect Jim as their proxy or ad-hoc rep.
- Options for interim/temporary co-chair in Kyoto - Lynn
- (20 min) Standing Committee Reports/Approvals
- EA IP Update - Marc Koehn
- CEO Report -
- CTO Report - [1]
- ArB Report -
- Affiliates Report -
- Domain Experts -
- Foundation & Technology -
- Structure & Semantic Design -
- SSD SD Project Approval: Clinical Genomics - Project Proposal (attachment) on Genetic Testing Reports (tabled from 2009-03-16) [2] TSC Tracker # 917
- Project Approval: CDA R3 PSS, at TSC Tracker # 1013
- Structured Documents: DSTU Publication request document CDA R2 IG Questionnaire_Assessment, TSC Tracker # 1038
- Technical & Support Services -
- (30 min) Discussion topics
- Approval of pending TSC internal projects – See draft TSC Three-Year-Plan. TSC Internal projects which have not been formally approved by the TSC -
- TSC Actionable National Initiative Plan 2009 Scope Statement, at TSC Tracker # 1001
- Other outstanding projects:
- TSC Roadmap AlignmentScope Statement, and wiki page Roadmap Projects
- TSC_Visibility_2009, at TSC Tracker # 883
- Project Visibility Scope Statement, at TSC Tracker #998
- Work Group Visibility Scope Statement, at TSC Tracker # 997
- Product Visibility Project: Scope Statement, at TSC Tracker #999; status
- TSC Technology Plan 2009
- Open Issues List
- Approval of pending TSC internal projects – See draft TSC Three-Year-Plan. TSC Internal projects which have not been formally approved by the TSC -