Difference between revisions of "TSC Action item list"
Jump to navigation
Jump to search
| Line 7: | Line 7: | ||
*From 20090330CC:Lynn to document TSC preference on dealing with SD not represented at WGM, that an ad-hoc member be approved for a short duration, as nominated by the selection of the Steering Division as a 'designated chair' for that WGM. | *From 20090330CC:Lynn to document TSC preference on dealing with SD not represented at WGM, that an ad-hoc member be approved for a short duration, as nominated by the selection of the Steering Division as a 'designated chair' for that WGM. | ||
*From [[2009-06-08_TSC_Call_Minutes]]: TSC will be deferring the RASCI chart concept to Project Services for their consideration | *From [[2009-06-08_TSC_Call_Minutes]]: TSC will be deferring the RASCI chart concept to Project Services for their consideration | ||
| − | *From [[2009-07-20_TSC_Call_Minutes]]: DAM Medical Records Composite Privacy – ACTION ITEM- ARB to review and discussion. How would one trace conformance back to this document. | + | *From [[2009-07-20_TSC_Call_Minutes]]: DAM Medical Records Composite Privacy – ACTION ITEM- ARB to review and discussion. How would one trace conformance back to this document. Review Aug 24, 2009 call after ArB OOC meeting. |
| − | |||
Revision as of 17:58, 3 August 2009
Click for TSC Action Item List
back to TSC Minutes and Agendas
[This is a place for TSC members to list or amend items that should be completed in the short term.]
- From 2009JanWGM ACTION ITEM: Propose ballot-level coordination for ISO/JIC work - Woody and Austin to draft a proposal. Attached to Tracker #332
- From 20090223CC: ACTION ITEM: Helen to draft revisions to Vendor demonstrations policy for recommendation to Board.
- From 20090330CC:Lynn to document TSC preference on dealing with SD not represented at WGM, that an ad-hoc member be approved for a short duration, as nominated by the selection of the Steering Division as a 'designated chair' for that WGM.
- From 2009-06-08_TSC_Call_Minutes: TSC will be deferring the RASCI chart concept to Project Services for their consideration
- From 2009-07-20_TSC_Call_Minutes: DAM Medical Records Composite Privacy – ACTION ITEM- ARB to review and discussion. How would one trace conformance back to this document. Review Aug 24, 2009 call after ArB OOC meeting.