Difference between revisions of "2017-06-26 TSC Call Agenda"
Jump to navigation
Jump to search
Anne wizauer (talk | contribs) |
Anne wizauer (talk | contribs) (→Agenda) |
||
Line 86: | Line 86: | ||
#***Reference to GOM 13.02.06.02 needs to be updated to “13.02.07.02 Extending the Trial Use Period or Reopening an STU for Trial Use” | #***Reference to GOM 13.02.06.02 needs to be updated to “13.02.07.02 Extending the Trial Use Period or Reopening an STU for Trial Use” | ||
#***As GOC liaison, I submitted attached TSC change request to GOM re: STU extensions, thus we will see a clarification in the September GOM after it clears the Peer Review process. The GOC favored iterative 1 year extensions (when warranted), vs. TSC granting a 2 year or 3 year extension request. Just FYI, I think Lynn’s proposed change is in sync with pending GOM revisions. | #***As GOC liaison, I submitted attached TSC change request to GOM re: STU extensions, thus we will see a clarification in the September GOM after it clears the Peer Review process. The GOC favored iterative 1 year extensions (when warranted), vs. TSC granting a 2 year or 3 year extension request. Just FYI, I think Lynn’s proposed change is in sync with pending GOM revisions. | ||
− | # | + | #*[http://gforge.hl7.org/gf/download/trackeritem/13490/15476/HL7_Publication_Request_CQL-based_HQMF_PID-1142_2017May-26_LL%202.docx STU Publication Request] by the CQI WG of the DESD for ''HL7 Version 3 Implementation Guide: Clinical Quality Language (CQL)-based Health Quality Measure Format (HQMF) - Release 1, STU 2 - US Realm'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=1142 Project Insight 1142] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=13490&start=0 TSC Tracker 13490] |
+ | #**Anne sent out updated reconciliation spreadsheet for review/approval | ||
#Approval items for this week: | #Approval items for this week: | ||
+ | #*SMART on FHIR | ||
+ | #*QRDA Category III unballoted STU update | ||
+ | #*GAO withdrawal request | ||
#Discussion topics: | #Discussion topics: | ||
##Voting Procedures for TSC Chair | ##Voting Procedures for TSC Chair | ||
Line 106: | Line 110: | ||
#*FHIR Ballot level issues - waiting for written explanation from Grahame | #*FHIR Ballot level issues - waiting for written explanation from Grahame | ||
#*Calvin/Austin will work on pulling out WG relationships and making a mapping for September meeting | #*Calvin/Austin will work on pulling out WG relationships and making a mapping for September meeting | ||
− | |||
===Minutes=== | ===Minutes=== |
Revision as of 20:51, 22 June 2017
TSC Agenda/Minutes
Meeting Info/Attendees
Standing Conference Calls
TSC will hold a Conference Call at 11AM Eastern time, each Monday except during scheduled face-to-face Working Group Meetings unless otherwise noted at TSC_Minutes_and_Agendas.
- GoToMeeting at https://global.gotomeeting.com/join/426505829 using VOIP
- For those without access to microphone/speakers:
- US: +1 (224)501-3318
- Canada: +1 (647)497-9379
- Italy: +39 0 230 57 81 80
- Access Code: 426-505-829
- GoToMeeting ID: 426-505-829
HL7 TSC Meeting Minutes Location: GoToMeeting ID: 426-505-829 |
Date: 2017-06-26 Time: 11:00 AM U.S. Eastern | |
Facilitator: Ken McCaslin | Note taker(s): Anne Wizauer |
Quorum = chair + 5 including 2 SD represented | yes/no | ||||||
Chair/CTO | ArB | International Affiliate Rep | Ad-Hoc | ||||
. | Ken McCaslin | . | Tony Julian | . | Jean Duteau | . | Freida Hall, GOM Expert |
. | Wayne Kubick | . | Lorraine Constable | . | Giorgio Cangioli | . | |
Domain Experts | Foundation and Technology | Structure and Semantic Design | Technical and Support Services | ||||
. | Melva Peters | . | Russ Hamm | . | Calvin Beebe | . | Andy Stechishin |
. | John Roberts | . | Paul Knapp | . | Austin Kreisler | . | Sandra Stuart |
. | . | . | . | ||||
ex officio | Invited Guests | Observers | HL7 Staff | ||||
. | Pat Van Dyke (HL7 Chair) w/vote | . | . | obs1 | . | Anne Wizauer | |
. | Chuck Jaffe (CEO) |
. | . | . | obs2 | . |
|
. | . | . | . | . | |||
Agenda
- Housekeeping
- Introduction of visitors (including declaration of interests)
- Agenda review and approval -
- Approve Minutes of 2017-06-19 TSC Call Agenda
- Homework
- Review message to WGs regarding getting mission and charters to SD for review
- Review action items –
- Melva, Jean, John, Calvin will review existing WGs and report at the 2017-06-26 TSC meeting
- Ken will follow up with Lynn to find out about out of cycle timelines re: upcoming FHIR ballots
- Calvin will assist with the FHIR naming issue. Lloyd will provide some examples.
- Ken will draft message to WGs regarding mission and charter review guidelines for review on 2017-06-19 call
- Wayne to ask EC what the costs are for Sunday at WGM so that, along with existing Mon – Fri rate, we could offer a similarly discounted Sunday – Friday rate as well
- Austin to head up a ballot reconciliation sync project to resolve some of these inconsistency issues and determine if a task force is necessary.
- Wayne to take recommendation regarding extending HL7 CDA R2 Implementation Guide: National Health Care Surveys (NHCS), R1 DSTU Release 1.2 - US Realm for 28 months to the EC for consideration
- John to notify WG of that action
- Approval items from previous weeks referred for discussion:
- Publication Request Template review and approval at TSC Tracker 13524
- Referred by Freida:
- Unless there is a compelling reason, I suggest we should retain the option for the WG to specify the STU length, vs. assuming all will be 24 months. We have two this week that requested a 12 month STU period.
- Reference to GOM 13.02.06.02 needs to be updated to “13.02.07.02 Extending the Trial Use Period or Reopening an STU for Trial Use”
- As GOC liaison, I submitted attached TSC change request to GOM re: STU extensions, thus we will see a clarification in the September GOM after it clears the Peer Review process. The GOC favored iterative 1 year extensions (when warranted), vs. TSC granting a 2 year or 3 year extension request. Just FYI, I think Lynn’s proposed change is in sync with pending GOM revisions.
- Referred by Freida:
- STU Publication Request by the CQI WG of the DESD for HL7 Version 3 Implementation Guide: Clinical Quality Language (CQL)-based Health Quality Measure Format (HQMF) - Release 1, STU 2 - US Realm at Project Insight 1142 and TSC Tracker 13490
- Anne sent out updated reconciliation spreadsheet for review/approval
- Publication Request Template review and approval at TSC Tracker 13524
- Approval items for this week:
- SMART on FHIR
- QRDA Category III unballoted STU update
- GAO withdrawal request
- Discussion topics:
- Voting Procedures for TSC Chair
- Voting Procedures for SD Co-Chair
- Electronic Voting Pilot
- Alignment between Normative and STU Ballot dispositions
- Width/breadth of CIMI project - continued from two weeks ago
- Removing co-chair email addresses from www.HL7.org - Wayne
- Carryover topics from WGM:
- EST/Tooling update
- ARB Recommendations to TSC:
- Project Scope Statements not include acronyms that are not spelled out. Rationale: outsiders will use the search function to find the project. Example is the LOINC – IVD Test Code (LIVD) Mapping – you can search project insight for LIVD, New members would search "invitro device" it will not show up.
- CIMI project: Should be reviewed for compliance with HL7 processes. Should be requested to produce an integration strategy.
- SGB recommendations regarding ballot level change requests - Calvin
- Review of draft SGB recommendation on adding a category of ballot disposition for items under consideration for the future
- Open Issues List/Parking Lot
- Wayne and Freida working on co-chair handbook update process
- FHIR Ballot level issues - waiting for written explanation from Grahame
- Calvin/Austin will work on pulling out WG relationships and making a mapping for September meeting
Minutes
Minutes/Conclusions Reached:
Next Steps
Actions (Include Owner, Action Item, and due date)
| |||
Next Meeting/Preliminary Agenda Items |
© 2017 Health Level Seven® International. All rights reserved.