Difference between revisions of "T3SD ConCall-20121022"

From HL7 TSC
Jump to navigation Jump to search
 
(3 intermediate revisions by the same user not shown)
Line 82: Line 82:
 
#** Not on call.
 
#** Not on call.
 
#* Electronic Services
 
#* Electronic Services
#** Lorraine reported ES met last week. ES is working on improvements to the websie, Vocabulary NLM tool, evaluating the co-chair survey.  Also have an issue (US Realm) from people looking for "consolidated CDA" named in Meaningful Use but named differently on the HL7 Website.  New inteim co-chair is Nat Wong.
+
#** Lorraine reported ES met last week. ES is working on improvements to the website, Vocabulary NLM tool, evaluating the co-chair survey.  Also have an issue (US Realm) from people looking for "consolidated CDA" named in Meaningful Use but named differently on the HL7 Website.  New interim co-chair is Nat Wong.
 
#* International Mentoring
 
#* International Mentoring
#**  
+
#** No news this call.
 
#* Process Improvement
 
#* Process Improvement
#** Sandy and Rita unable to attend the call but Sandy reported the Co-Chairs survey is ready.  
+
#** Sandy and Rita unable to attend the call but Sandy reported the Co-Chairs survey is ready; this survey is for co-chairs who have resigned and may also cover those who chose not to run for another term. If the latter, PIC may want to change the name of the survey.   
 
#* Project Services
 
#* Project Services
#**   
+
#** Rick report PS has updated their DMP.  Dave is working on updating the Project Scope Statement (PSS) for the 2013 edition; this is topic in HL7 Newsletter.  PS is working with a student to provide project management analysis.  
 
#* Publishing
 
#* Publishing
#**  
+
#** V2-Brian reported Normative edition (V2.8), OO has question about substantive change.  V2 Pubs upgrade-making corrections to project dates. 
#* Tooling
+
#** V3- Andy reported the October (OOC) ballot opened last week; Notice of Intent to Ballot (NIB) are due Sunday.  Projects seem to be ramping up; some may be in response to the ANSI audit; TSC may grant waiver due to timing issues if related to audit cleanup.  Working on content for January 2013 ballot.
#**  
+
#* Tooling  
 +
#** Jane reported Tooling is gearing up for Tool Challenge webinar.  Also working with Vocabulary on PSS for co-sponsored project.  They have received design deliverable for EHR-FM project; progress according to plan.  HingX and Tooling Strategy projects still active. 
 
# Project Review
 
# Project Review
 
#*PBS Metrics at http://gforge.hl7.org/gf/project/tsc/frs/?action=FrsReleaseBrowse&frs_package_id=169 - (Updates posted March, July, November and at WGM)  
 
#*PBS Metrics at http://gforge.hl7.org/gf/project/tsc/frs/?action=FrsReleaseBrowse&frs_package_id=169 - (Updates posted March, July, November and at WGM)  
# TSC meeting Report -
+
# TSC meeting Report - TSC approved first cut of product/family line definition. 
 
#* Published weekly to Co-Chairs list and in eNews.  Any questions?
 
#* Published weekly to Co-Chairs list and in eNews.  Any questions?
 
#** http://hl7tsc.org/wiki/index.php?title=TSC
 
#** http://hl7tsc.org/wiki/index.php?title=TSC
 
# New Business -  
 
# New Business -  
#* Discuss RIMBAA request to move from FTSD to T3SD (Andy Stechishin)
+
#* Discuss RIMBAA request to move from FTSD to T3SD (Andy Stechishin) - RIMBAA raised question of changing Steering Division through their SD.  They do not produce standards so may be a better fit in T3SD.  Jane commented they had proposed changing their name to more generic (e.g. Software Implementers) to embrace implementers as a whole.  T3SD WGs did not see any issue with RIMBAA moving to T3SD  and thought it was a good fit,  with caveat they are aware/agree to Board report/liaison responsibilities (see the GOM).
#* Reminder NIB are due Sunday.  
+
# Meeting Adjourned.
# Meeting Adjourned <insert time>
 

Latest revision as of 18:27, 5 November 2012

Back to Agendas and minutes

Attendees

  • 2012-2013 Board Liaisons - Congratulations new and returning Board Liaisons
Quorum Requirements (Chair +4 SD Reps for "decision making") or (Chair +3 SD Reps for "direction setting") Met: ?
Attendee Name Affiliation
Regrets Patrick Loyd HL7 T3SD Co-Chair
X Freida Hall HL7 T3SD Co-Chair
Diego Kaminker Education
Melva Peters (Board Liaison) Education
Patrick Loyd Education
Bill Braithwaite Electronic Services
X Lorraine Constable (Board Liaison) Electronic Services
X Ken McCaslin Electronic Services
Nat Wong, Interim Co-Chair Electronic Services
Diego Kaminker International Mentoring
X John Ritter (Board Liaison) International Mentoring
Regrets Rita Scichilone Process Improvement
Regrets Sandy Stuart (Board Liaison) Process Improvement
X Rick Haddorff (Board Liaison) Project Services
X Freida Hall Project Services
Woody Beeler Publishing
X Jane Curry (Board Liaison) Publishing
Jane Daus Publishing
X Brian Pech Publishing
X Andy Stechishin Publishing
Regrets Sandy Stuart Publishing
X Jane Curry (Board Liaison) Tooling
X Andy Stechishin Tooling
Michael Van der Zel Tooling
X Dave Hamill (non voting) HL7 PMO Office
X Lynn Laakso (guest) TSC Project Manager

Meeting Admin

  1. Roll Call - Nat Wong is new Interim Co-Chair in Electronic Services.
  2. Approve Agenda - Approved
  3. Approve Meeting Minutes -
    • September 24, 2012 - Motion to approve by John; seconded by Andy. Against-0; Abstain-0; motion carried.
    • October 8, 2012 - Motion to approve by John; seconded by Andy. Against-0; Abstain-1; motion carried.
  4. Work Group Updates
    • Education
      • Not on call.
    • Electronic Services
      • Lorraine reported ES met last week. ES is working on improvements to the website, Vocabulary NLM tool, evaluating the co-chair survey. Also have an issue (US Realm) from people looking for "consolidated CDA" named in Meaningful Use but named differently on the HL7 Website. New interim co-chair is Nat Wong.
    • International Mentoring
      • No news this call.
    • Process Improvement
      • Sandy and Rita unable to attend the call but Sandy reported the Co-Chairs survey is ready; this survey is for co-chairs who have resigned and may also cover those who chose not to run for another term. If the latter, PIC may want to change the name of the survey.
    • Project Services
      • Rick report PS has updated their DMP. Dave is working on updating the Project Scope Statement (PSS) for the 2013 edition; this is topic in HL7 Newsletter. PS is working with a student to provide project management analysis.
    • Publishing
      • V2-Brian reported Normative edition (V2.8), OO has question about substantive change. V2 Pubs upgrade-making corrections to project dates.
      • V3- Andy reported the October (OOC) ballot opened last week; Notice of Intent to Ballot (NIB) are due Sunday. Projects seem to be ramping up; some may be in response to the ANSI audit; TSC may grant waiver due to timing issues if related to audit cleanup. Working on content for January 2013 ballot.
    • Tooling
      • Jane reported Tooling is gearing up for Tool Challenge webinar. Also working with Vocabulary on PSS for co-sponsored project. They have received design deliverable for EHR-FM project; progress according to plan. HingX and Tooling Strategy projects still active.
  5. Project Review
  6. TSC meeting Report - TSC approved first cut of product/family line definition.
  7. New Business -
    • Discuss RIMBAA request to move from FTSD to T3SD (Andy Stechishin) - RIMBAA raised question of changing Steering Division through their SD. They do not produce standards so may be a better fit in T3SD. Jane commented they had proposed changing their name to more generic (e.g. Software Implementers) to embrace implementers as a whole. T3SD WGs did not see any issue with RIMBAA moving to T3SD and thought it was a good fit, with caveat they are aware/agree to Board report/liaison responsibilities (see the GOM).
  8. Meeting Adjourned.