Difference between revisions of "FaceToFace-20070111"

From HL7 TSC
Jump to navigation Jump to search
Line 1: Line 1:
 
=Present=
 
=Present=
Beeler, Blobel, Buitenjdyck, Case, Parker, McCay
+
Parker, Beeler, Blobel, Buitendyck, Case, McCay, McCaslin, Hall
  
 
=Preliminary Agenda=
 
=Preliminary Agenda=
Line 10: Line 10:
 
:Focus on the Agenda Topic List
 
:Focus on the Agenda Topic List
  
=Present=
 
Parker, Beeler, Blobel, Buitendyck, Case, McCay, McCaslin, Hall
 
 
=Project Life Cycle Team Discussion - Hall, McCaslin=
 
=Project Life Cycle Team Discussion - Hall, McCaslin=
 
Groups remit ends shortly after Transition ends.  
 
Groups remit ends shortly after Transition ends.  
 
T3F will need to assign steps in new structure to assure Life Cycle is alove and workable in new structure.
 
  
 
Key features - have a process but must be iterative (not waterfall)
 
Key features - have a process but must be iterative (not waterfall)
Line 24: Line 20:
  
 
Results of a project will be used, and for standards ultimate focus is a normative standard.
 
Results of a project will be used, and for standards ultimate focus is a normative standard.
 +
 +
T3F will need to assign steps in new structure to assure Life Cycle is alove and workable in new structure, including roles of TD, Technical Committees and relationship of TD to successor to the Project Life Cycle effort.
 +
 +
==Questions to ToT==
 +
Is Strategic Initiative Document being Maintained?  (Needs to be updated by each team as it progresses.)  How does ToT remain aware of what each team is doing?
 +
 +
  
 
=Agenda topic list=
 
=Agenda topic list=

Revision as of 16:36, 11 January 2007

Present

Parker, Beeler, Blobel, Buitendyck, Case, McCay, McCaslin, Hall

Preliminary Agenda

Process Discussion with Frieda and Ken
Proposed Item (Craig/Charlie): Involving key groups and individuals.
Finalize Koln WGM space/time needs
Logistics - Meeting support and technology & e-mail lists
Proposed Item (Craig): Meeting in conjunction with Harmonization (March 13-16 in Las Vegas)
Focus on the Agenda Topic List

Project Life Cycle Team Discussion - Hall, McCaslin

Groups remit ends shortly after Transition ends.

Key features - have a process but must be iterative (not waterfall)

Sought peer review. No interest until announcements last week. Is now, and Peer Review closes Feb 15

Suggesting "project Facilitator" in each Committee

Results of a project will be used, and for standards ultimate focus is a normative standard.

T3F will need to assign steps in new structure to assure Life Cycle is alove and workable in new structure, including roles of TD, Technical Committees and relationship of TD to successor to the Project Life Cycle effort.

Questions to ToT

Is Strategic Initiative Document being Maintained? (Needs to be updated by each team as it progresses.) How does ToT remain aware of what each team is doing?


Agenda topic list

Core challenges. Each with
Success Criteria and Time box
Communications strategy

Action item list

Refine the steps from minutes of 20070104 into action items
Classify and propose actions on items in document trove
Assemble agenda topic list