Difference between revisions of "2016-08-01 TSC Call Agenda"

From HL7 TSC
Jump to navigation Jump to search
Line 120: Line 120:
 
===Minutes===
 
===Minutes===
 
'''Minutes/Conclusions Reached:'''<br/>
 
'''Minutes/Conclusions Reached:'''<br/>
 
+
#Introduction of visitors (including declaration of interests)
 +
#Agenda review and approval -
 +
#Approve Minutes of [[2016-07-25 TSC Call Agenda]]
 +
#*Accepted by general consent
 +
#Review [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=494 action items] –
 +
#*Continue to review [http://gforge.hl7.org/gf/download/trackeritem/10313/14560/2016SepBallotReferrals.xlsx 2016Sep Ballot items] that are unapproved/required followup
 +
#Approval Items from previous weeks with followup:
 +
#*[http://gforge.hl7.org/gf/download/trackeritem/10051/14468/HL7%20Project%20Scope%20Statement%20Common%20Registry%20DAM%202016_05_07_Revised%20ACW%202016_06_16%202.docx Revised Project Approval Request] by the CQI WG of the DESD of ''Common Clinical Registry Framework Domain Analysis Model'' at Project Insight TBD and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=10051&start=0 TSC Tracker 10051]
 +
#**DESD: Item 2, WG level of involvement is not completed. Items 6c and PBS metrics review not completed. Item 6D, local and state departments of health should be checked.
 +
#**ARB: Is this investigative? Otherwise why not balloting?
 +
#***Melva to follow up on items 2, 6c and 6d
 +
#***'''UPDATE: Revised PSS submitted; will be in this week's e-vote'''
 +
#*[http://gforge.hl7.org/gf/download/trackeritem/10253/14471/HL7%20PSS%20-%20PHR-S%20FM%20to%20Release%202%20format%20-%2020160610%202.docx Project Approval Request] by the EHR WG of the SSD-SD of ''HL7 Personal Health Record System Functional Model – Update from Release 1 to Release 2 format'' at Project Insight TBD and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=10253&start=0 TSC Tracker 10253]
 +
#**Freida: Does this need to be a Joint Initiative Council (JIC) ballot if it is going to ISO? [http://www.jointinitiativecouncil.org/ JointInitiativeCouncil.org] mentions HL7-ISO Pilot Agreement and joint copyright in §5.b
 +
#***'''ACTION: Wayne to contact Ed as he is the formal HL7 rep to ISO'''
 +
#*[http://gforge.hl7.org/gf/download/trackeritem/10372/14508/HL7%20V2%206%20Vital%20Records%20Death%20Reporting%20IG%20Publication_Request_20160630.docx STU Publication Request] by the PHER WG of the DESD for ''HL7 Version 2.6 Implementation Guide: Vital Records Death Reporting (US Realm), Release 1'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=1208 Project Insight 1208] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=10372&start=0 TSC Tracker 10372]
 +
#**'''Referred by Freida''': It seems the Project Insight # may be incorrect reference?  Per the ballot desktop, the January 2016 ballot was:  HL7 Version 2.6 Implementation Guide: Vital Records Death Reporting (US Realm), Release 1 (PI ID: 735) The Publication Request indicates both project ids, don’t know why 735 says “delete?”
 +
#**Anne checked with Lynn; she states "Vital Records' project ID was changed with the new PSS. It used to be 735 but is now balloting under 1208."
 +
#***ACTION: Anne to talk with Dave to make sure old project (735) is closed.
 +
#***'''UPDATE: Dave has archived project 735'''
 +
#Approval items from last week's e-vote '''referred for discussion''':
 +
#*[http://gforge.hl7.org/gf/download/trackeritem/10402/14554/HL7%20Project%20Scope%20Statement_DAF_2016_PSS_v4%207.docx Project Approval Request] by the FHIR-I WG of the FTSD of ''Data Access Framework (DAF) FHIR Implementation Guide(s)'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=1265 Project Insight 1265] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=10402&start=0 TSC Tracker 10402]
 +
#**'''Referred by T3SD, Giorgio, and DESD:''' All comments are regarding deferral of vote until cosponsors have approved
 +
#**'''Referred by Freida:''' Does this need ARB review of externally developed content? PSS needs to better explain when/what ARB needs to review; change request entered for next PSS update.
 +
#Approval items from last week's e-vote approved 8/0/0 with DESD, FTSD, SSD-SD, T3SD, Giorgio, Melva, Wayne, and Austin voting:
 +
#*[http://gforge.hl7.org/gf/download/trackeritem/10401/14553/HL7_Publication_Request_Template_2016May_Health%20Concerns.docx Informative Publication Request] by the Patient Care WG of the DESD for ''Health Concerns DAM'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=929 Project Insight 929] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=10401&start=0 TSC Tracker 10401]
 +
#Approval items for this week:
 +
#*[http://gforge.hl7.org/gf/download/trackeritem/10051/14569/HL7%20Project%20Scope%20Statement%20Common%20Registry%20DRAFT%20DAM%202016_05_09%20Revision%2029Jul16.docx Revised Project Approval Request] by the CQI WG of the DESD of ''Common Clinical Registry Framework Domain Analysis Model'' at Project Insight TBD and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=10051&start=0 TSC Tracker 10051]
 +
#*[http://gforge.hl7.org/gf/download/trackeritem/10412/14570/HL7_Publication_Request_Template%20CCHD%20Request%20for%20DSTU%20Extension%2028_07_2%20%20%20.docx DSTU Extension Request] by the PHER WG of the DESD for ''HL7 Version 2.6 Implementation Guide: Critical Congenital Heart Defects (CCHD) pulse oximetry screening results, Release 1'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=897 Project Insight 897] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=10412&start=0 TSC Tracker 10412]
 +
#*[http://gforge.hl7.org/gf/download/trackeritem/10413/14571/HL7_Publication_Request_Template_2016May_ProjSvcs.docx Informative Publication Request] by the Project Services WG of the T3SD of ''HL7 Policy for Introducint New Processes, Release 1'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=1224 Project Insight 1224] and http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=10413&start=0 TSC Tracker 10413]
 +
#*[http://gforge.hl7.org/gf/download/trackeritem/10414/14572/HL7%20PSS-Immunization%20Functional%20Profile-20160628.docx Project Approval Request] by the EHR WG of the SSD-SD for ''EHR System Immunization Functional Profile Release 2'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=1276 Project Insight 1276] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=10414&start=0 TSC Tracker 10414]
 +
#Discussion topics:
 +
#*[http://gforge.hl7.org/gf/download/trackeritem/10313/14560/2016SepBallotReferrals.xlsx 2016Sep Ballot items] that are unapproved/required followup
 +
#Reports: (attach written reports below from Steering Divisions et al.)
 +
<!-- #WGM Planning - -->
 +
#Parking Lot/[http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=313 Open Issues List]
 +
#*SeptemberWGM prep
 +
#*HL7 documentation formats across standards families - followup from 6-27 call with [http://gforge.hl7.org/gf/download/docmanfileversion/9305/14493/MFHAST_HL7_Standards_Formats.docx associated document]
 +
#*Assignment of outside projects to WGs:
 +
#**1) We need a process for Universal realm projects; 2) We need a model for top down approval process; 3) We need advice published for people coming in with a project from the outside; 4: we need to clearly define role of TSC and steering divisions in this process. Calvin: US Realm should be added to the list for the US things.
 +
#*Continue work on multi-year planning items:
 +
#**Simplification of location of meeting notifications, minutes, agendas, and other documentation - '''merged with Standardization of Processes Across WGs'''
 +
#**Evaluate WG/SD structure: Melva, John, Russ
 +
#**Evaluate opportunities for member/non-member engagement: John, Lorraine, Russ w/Anne assisting
 +
#**Standards organization hierarchy: John
 +
#**Standards sharing across realms: Jean, Giorgio
 +
#**Standardization of processes across WGs: Sandy, Melva, Ken, Tony, w/Anne assisting - rescheduling call due to harmonization
 +
#**Strategy for PSS management throughout the lifecycle: Jean, Calvin, Dave, EST
 +
#***Working on scheduling a call
  
 
===Next Steps===
 
===Next Steps===

Revision as of 18:36, 1 August 2016

TSC Agenda/Minutes

Meeting Info/Attendees

Standing Conference Calls

TSC will hold a Conference Call at 11AM Eastern time, each Monday except during scheduled face-to-face Working Group Meetings unless otherwise noted at TSC_Minutes_and_Agendas.

GoToMeeting at https://global.gotomeeting.com/join/426505829 using VOIP
For those without access to microphone/speakers:
US: +1 (224)501-3318
Canada: +1 (647)497-9379
Italy: +39 0 230 57 81 80
Access Code: 426-505-829
GoToMeeting ID: 426-505-829
HL7 TSC Meeting Minutes

Location: GoToMeeting ID: 426-505-829

Date: 2016-08-01
Time: 11:00 AM U.S. Eastern
Facilitator: Ken McCaslin Note taker(s): Dave Hamill
Quorum = chair + 5 including 2 SD represented yes/no
Chair/CTO ArB International Affiliate Rep Ad-Hoc
. Ken McCaslin . Tony Julian . Jean Duteau . Austin Kreisler
. Wayne Kubick . Lorraine Constable . Giorgio Cangioli . Freida Hall, GOM Expert
. . . . Woody Beeler, TSC Member Emeritus
Domain Experts Foundation and Technology Structure and Semantic Design Technical and Support Services
Regrets Melva Peters . Russ Hamm . Calvin Beebe . Andy Stechishin
. John Roberts . Paul Knapp . Gora Datta . Sandra Stuart
. . . .
ex officio Invited Guests Observers HL7 Staff
. Pat Van Dyke (HL7 Chair) w/vote . . obs1 . Anne Wizauer
. Chuck Jaffe (CEO) vote . . . obs2 .


. . . . .

Agenda

Housekeeping

  1. Introduction of visitors (including declaration of interests)
  2. Agenda review and approval -
  3. Approve Minutes of 2016-07-25 TSC Call Agenda
  4. Review action items
  5. Approval Items from previous weeks with followup:
    • Revised Project Approval Request by the CQI WG of the DESD of Common Clinical Registry Framework Domain Analysis Model at Project Insight TBD and TSC Tracker 10051
      • DESD: Item 2, WG level of involvement is not completed. Items 6c and PBS metrics review not completed. Item 6D, local and state departments of health should be checked.
      • ARB: Is this investigative? Otherwise why not balloting?
        • Melva to follow up on items 2, 6c and 6d
        • UPDATE: Revised PSS submitted; will be in this week's e-vote
    • Project Approval Request by the EHR WG of the SSD-SD of HL7 Personal Health Record System Functional Model – Update from Release 1 to Release 2 format at Project Insight TBD and TSC Tracker 10253
      • Freida: Does this need to be a Joint Initiative Council (JIC) ballot if it is going to ISO? JointInitiativeCouncil.org mentions HL7-ISO Pilot Agreement and joint copyright in §5.b
        • ACTION: Wayne to contact Ed as he is the formal HL7 rep to ISO
    • STU Publication Request by the PHER WG of the DESD for HL7 Version 2.6 Implementation Guide: Vital Records Death Reporting (US Realm), Release 1 at Project Insight 1208 and TSC Tracker 10372
      • Referred by Freida: It seems the Project Insight # may be incorrect reference? Per the ballot desktop, the January 2016 ballot was: HL7 Version 2.6 Implementation Guide: Vital Records Death Reporting (US Realm), Release 1 (PI ID: 735) The Publication Request indicates both project ids, don’t know why 735 says “delete?”
      • Anne checked with Lynn; she states "Vital Records' project ID was changed with the new PSS. It used to be 735 but is now balloting under 1208."
        • ACTION: Anne to talk with Dave to make sure old project (735) is closed.
        • UPDATE: Dave has archived project 735
  6. Approval items from last week's e-vote referred for discussion:
    • Project Approval Request by the FHIR-I WG of the FTSD of Data Access Framework (DAF) FHIR Implementation Guide(s) at Project Insight 1265 and TSC Tracker 10402
      • Referred by T3SD, Giorgio, and DESD: All comments are regarding deferral of vote until cosponsors have approved
      • Referred by Freida: Does this need ARB review of externally developed content? PSS needs to better explain when/what ARB needs to review; change request entered for next PSS update.
  7. Approval items from last week's e-vote approved 8/0/0 with DESD, FTSD, SSD-SD, T3SD, Giorgio, Melva, Wayne, and Austin voting:
  8. Approval items for this week:
  9. Discussion topics:
  10. Reports: (attach written reports below from Steering Divisions et al.)
  11. Parking Lot/Open Issues List
    • SeptemberWGM prep
    • HL7 documentation formats across standards families - followup from 6-27 call with associated document
    • Assignment of outside projects to WGs:
      • 1) We need a process for Universal realm projects; 2) We need a model for top down approval process; 3) We need advice published for people coming in with a project from the outside; 4: we need to clearly define role of TSC and steering divisions in this process. Calvin: US Realm should be added to the list for the US things.
    • Continue work on multi-year planning items:
      • Simplification of location of meeting notifications, minutes, agendas, and other documentation - merged with Standardization of Processes Across WGs
      • Evaluate WG/SD structure: Melva, John, Russ
      • Evaluate opportunities for member/non-member engagement: John, Lorraine, Russ w/Anne assisting
      • Standards organization hierarchy: John
      • Standards sharing across realms: Jean, Giorgio
      • Standardization of processes across WGs: Sandy, Melva, Ken, Tony, w/Anne assisting - rescheduling call due to harmonization
      • Strategy for PSS management throughout the lifecycle: Jean, Calvin, Dave, EST
        • Working on scheduling a call

Minutes

Minutes/Conclusions Reached:

  1. Introduction of visitors (including declaration of interests)
  2. Agenda review and approval -
  3. Approve Minutes of 2016-07-25 TSC Call Agenda
    • Accepted by general consent
  4. Review action items
  5. Approval Items from previous weeks with followup:
    • Revised Project Approval Request by the CQI WG of the DESD of Common Clinical Registry Framework Domain Analysis Model at Project Insight TBD and TSC Tracker 10051
      • DESD: Item 2, WG level of involvement is not completed. Items 6c and PBS metrics review not completed. Item 6D, local and state departments of health should be checked.
      • ARB: Is this investigative? Otherwise why not balloting?
        • Melva to follow up on items 2, 6c and 6d
        • UPDATE: Revised PSS submitted; will be in this week's e-vote
    • Project Approval Request by the EHR WG of the SSD-SD of HL7 Personal Health Record System Functional Model – Update from Release 1 to Release 2 format at Project Insight TBD and TSC Tracker 10253
      • Freida: Does this need to be a Joint Initiative Council (JIC) ballot if it is going to ISO? JointInitiativeCouncil.org mentions HL7-ISO Pilot Agreement and joint copyright in §5.b
        • ACTION: Wayne to contact Ed as he is the formal HL7 rep to ISO
    • STU Publication Request by the PHER WG of the DESD for HL7 Version 2.6 Implementation Guide: Vital Records Death Reporting (US Realm), Release 1 at Project Insight 1208 and TSC Tracker 10372
      • Referred by Freida: It seems the Project Insight # may be incorrect reference? Per the ballot desktop, the January 2016 ballot was: HL7 Version 2.6 Implementation Guide: Vital Records Death Reporting (US Realm), Release 1 (PI ID: 735) The Publication Request indicates both project ids, don’t know why 735 says “delete?”
      • Anne checked with Lynn; she states "Vital Records' project ID was changed with the new PSS. It used to be 735 but is now balloting under 1208."
        • ACTION: Anne to talk with Dave to make sure old project (735) is closed.
        • UPDATE: Dave has archived project 735
  6. Approval items from last week's e-vote referred for discussion:
    • Project Approval Request by the FHIR-I WG of the FTSD of Data Access Framework (DAF) FHIR Implementation Guide(s) at Project Insight 1265 and TSC Tracker 10402
      • Referred by T3SD, Giorgio, and DESD: All comments are regarding deferral of vote until cosponsors have approved
      • Referred by Freida: Does this need ARB review of externally developed content? PSS needs to better explain when/what ARB needs to review; change request entered for next PSS update.
  7. Approval items from last week's e-vote approved 8/0/0 with DESD, FTSD, SSD-SD, T3SD, Giorgio, Melva, Wayne, and Austin voting:
  8. Approval items for this week:
  9. Discussion topics:
  10. Reports: (attach written reports below from Steering Divisions et al.)
  11. Parking Lot/Open Issues List
    • SeptemberWGM prep
    • HL7 documentation formats across standards families - followup from 6-27 call with associated document
    • Assignment of outside projects to WGs:
      • 1) We need a process for Universal realm projects; 2) We need a model for top down approval process; 3) We need advice published for people coming in with a project from the outside; 4: we need to clearly define role of TSC and steering divisions in this process. Calvin: US Realm should be added to the list for the US things.
    • Continue work on multi-year planning items:
      • Simplification of location of meeting notifications, minutes, agendas, and other documentation - merged with Standardization of Processes Across WGs
      • Evaluate WG/SD structure: Melva, John, Russ
      • Evaluate opportunities for member/non-member engagement: John, Lorraine, Russ w/Anne assisting
      • Standards organization hierarchy: John
      • Standards sharing across realms: Jean, Giorgio
      • Standardization of processes across WGs: Sandy, Melva, Ken, Tony, w/Anne assisting - rescheduling call due to harmonization
      • Strategy for PSS management throughout the lifecycle: Jean, Calvin, Dave, EST
        • Working on scheduling a call

Next Steps

Actions (Include Owner, Action Item, and due date)
  • .
Next Meeting/Preliminary Agenda Items


© 2016 Health Level Seven® International. All rights reserved.