Strategic Initiatives TSC Dashboard
HL7 Strategic Initiatives Dashboard Project
Project Scope: The scope of this project to implement a dashboard showing the TSC progress on implementing the HL7 Strategic Initiatives that the TSC is responsible for. The HL7 Board of Directors has a process for maintaining the HL7 Strategic Initiatives. The TSC is responsible for implementing a significant number of those initiatives. As part of developing a dashboard, the TSC will need to develop practical criteria for measuring progress in implementing the strategic initiatives. There are two aspects to the project. First is the process of standing up the dashboard itself. This may end up being a discrete project handed off to Electronic Services and HQ. That dashboard would track progress towards all of HL7's strategic initiatives (not just those the TSC is responsible for managing.) The second part of this project will be focused on the Strategic Initiatives for which the TSC is responsible.
In discussion at 2011-09-10_TSC_WGM_Agenda in San Diego, a RASCI Chart showing which criteria under the Strategic Initiatives the TSC would take responsibility for.
From those, the TSC accepted volunteers to draft metrics with which to measure the TSC criteria.
These notes are taken from the 2011-11-14_TSC_Call_Agenda
- Tracker #2060 Ken will create Strategic Dashboard criteria metrics recommendations for: Industry responsiveness and easier implementation
- Ken has proposed that projects continue to be identified as important to a strategic initiative, rather than removing that area on the project scope statement. If a project is being initiated specifically for a strategic initiative project then it must be identified in some way. Austin notes that we have not historically been using those checkboxes to identify which SI their project is aligned with. Ken notes that we need to help Project Services to identify SI projects that are not specifically in support of an SI. Woody notes that many projects are in alignment with a SI. Ken is looking to harvest information to know when a project is for a strategic initiative, for placement on the dashboard. Then we can measure those projects for green/yellow/red. Austin notes that such measurement is not restricted solely to projects. Ken notes that without deriving objective information from projects it will be a heavily manual, subjective process and resources would be needed. Ken was going to work with Dave to recategorize the existing projects among the three initiatives now in place. Austin uses an example of WGM effectiveness as a measure that cannot be generated from project information. Woody adds some measures are related to the ballot itself. Austin was not constraining himself to those measurements that can be automated. Ken notes that even the survey on WGM effectiveness you have to drill down to the comments to find constructive information. Austin notes that rolling up all projects under three categories will be difficult to measure since some of the items under each category are under the TSC and some are not. We have to be able to collect data at the next layer down. Woody notes that the indication of strategic initiative on the scope statement is not as precise as it needs to be but it gives us a place to start. Ken and Dave would do the assessment and bring it back to the TSC for review.
- Tracker #2059 Austin will create Strategic Dashboard criteria metrics for: Requirements traceability and cross-artifact consistency
- Requirements traceability - Tied to HL7 roll out of SAIF ECCF. measure is the number of milestones completed
- Informative SAIF Canonical document published
- DSTU SAIF Canonical document published
- Normative SAIF Canonical document published
- Peer Reviewed HL7 SAIF IG including ECCF chapter and draft SAIF Artifact Definitions
- DSTU HL7 SAIF IG published
- Normative HL7 SAIF IG published
- SAIF Architecture Program experimental phase of HL7 SAIF ECCF implementation completed
- SAIF AP trial use phase of HL7 SAIF ECCF implementation completed
- HL7 SAIF ECCF rolled to all work groups working on applicable standards (V3 primarily)
- Cross-artifact consistency
- Percent of Work groups in FTSD, SSDSD and DESD participating in RIM/Vocab/Pattern Harmonization meetings, calculated as a 3 trimester moving average
- Survey of newly published standards via the publication request form
- V3 Standards - Measure - Green: All new standards have one or more of the following checked; Yellow: 1-2 standards have none of the following checked; Red: 3 or more standards have none of the following checked
- Standard uses CMETs from COCT domain
- Standard drawn from common Domain Model including Clinical Statement, Common Product Model, ???
- Standard uses harmonized design patterns (as defined through RIM Pattern harmonization process)
- V3 Standards - Measure - Green: All new standards have one or more of the following checked; Yellow: 1-2 standards have none of the following checked; Red: 3 or more standards have none of the following checked
- Austin notes that these are not necessarily automated metrics for the criteria.
- Requirements traceability - Tied to HL7 roll out of SAIF ECCF. measure is the number of milestones completed
- Tracker #2058 Woody will create Strategic Dashboard criteria metrics for: Product Quality
- Measure is the average number of ballot cycles necessary to pass a normative standard. Calculated as a 3 trimester moving average based on publication requests. Add a new field to publication request to document number of ballot cycles required to pass normative ballot.
- Green: 1-2 ballot cycles
- Yellow: 3-4 ballot cycles
- Red: 5+ ballot cycles
- Woody was going to look at
- creating schemas that actually validate,
- the presence of line-level comments in a static model
- Projects at risk of becoming stale 2 cycles after last ballot
- Two cycles since last ballot but not posting reconciliation or request for publication for normative edition
- items going into third or higher level of balloting for a normative specification; it’s ok to be flagged as a concern while the process is ongoing; doesn't mean it’s a measure of quality once it has finished balloting.
- Measure is the average number of ballot cycles necessary to pass a normative standard. Calculated as a 3 trimester moving average based on publication requests. Add a new field to publication request to document number of ballot cycles required to pass normative ballot.
- Lynn will move these to a specific wiki page to develop these further. Make a standing agenda item to report progress on proposals. Ken will work with Dave Hamill to sort the existing projects under the three criteria and develop instruction on the use of the strategic initiatives checkbox. They’ll use the 2012 SI criteria. Ken will ask Dave to present their findings next week.