FTSD SWOT and Three-year Strategic Plan Summary

From HL7 TSC
Revision as of 15:30, 8 September 2008 by Ioana13 (talk | contribs)
Jump to navigation Jump to search

Edit this page and replace <... SWOT link> and <... Plan link> with the URL of your work group's SWOT analysis and strategic plan (3 year minimum).

Note: Modeling and Methodology has an example link for each document.
Work Group SWOT Analysis Strategic Plan
Implementable Technology Specifications (ITS) <ITS SWOT link> <ITS Plan link>
Implementation/Conformance <IC SWOT link> <IC Plan link>
Infrastructure & Messaging (InM) <InM SWOT link> <InM Plan link>
RIM-Based Application Architecture (RIMBAA) <RIMBAA SWOT link> <RIMBAA Plan link>
Modeling & Methodology (MnM) Strategic Plan MnM SWOT Analysis Strategic Plan
Security <Security SWOT link> <Security Plan link>
Service Oriented Architecture (SOA) <SOA SWOT link> <SOA Plan link>
Templates <Templates SWOT link> <Templates Plan link>
Vocabulary <Vocab SWOT link> <Vocab Plan link>