FTSD SWOT and Three-year Strategic Plan Summary
Jump to navigation
Jump to search
Work Group | SWOT Analysis | Strategic Plan | ||||
Implementable Technology Specifications (ITS) | <ITS SWOT link> | <ITS Plan link> | ||||
Implementation/Conformance | ||||||
Infrastructure & Messaging (InM) | <InM SWOT link> | <InM Plan link> | ||||
RIM-Based Application Architecture (RIMBAA) | <RIMBAA SWOT link> | <RIMBAA Plan link> | ||||
Modeling & Methodology (MnM) | MnM SWOT Analysis | Draft Strategic Plan | ||||
Security | <Security SWOT link> | <Security Plan link> | ||||
Service Oriented Architecture (SOA) | <SOA SWOT link> | <SOA Plan link> | ||||
Templates | <Templates SWOT link> | <Templates Plan link> | ||||
Vocabulary | <Vocab SWOT link> | <Vocab Plan link> |