2013-11-25 TSC Call Minutes
Jump to navigation
Jump to search
TSC Agenda/Minutes
Meeting Info/Attendees
Standing Conference Calls
TSC will hold a Conference Call at 11AM Eastern time, each Monday except during scheduled face-to-face Working Group Meetings unless otherwise noted at TSC_Minutes_and_Agendas.
- GoToMeeting at https://global.gotomeeting.com/join/426505829 using VOIP
- For those without access to microphone/speakers:
- US: +1 (224)501-3318
- Canada: +1 (647)497-9379
- Italy: +39 0 230 57 81 80
- Access Code: 426-505-829
- GoToMeeting ID: 426-505-829
HL7 TSC Meeting Minutes Location: call 770-657-9270 using code 985371# |
Date: 2013-11-25 Time: 11:00 AM U.S. Eastern | |
Facilitator: Austin Kreisler | Note taker(s): Dave Hamill |
Quorum = chair + 5 including 2 SD represented | yes | ||||||
Chair/CTO | ArB | International Affiliate Rep | Ad-Hoc | ||||
x | Austin Kreisler | x | Tony Julian | . | Jean Duteau | tentative | Ken McCaslin |
x | John Quinn | x | Lorraine Constable | . | . | Giorgio Cangioli | |
Domain Experts | Foundation and Technology | Structure and Semantic Design | Technical and Support Services | ||||
. | Melva Peters | x | Woody Beeler | x | Calvin Beebe | x | Freida Hall |
x | Mead Walker | x | Paul Knapp | regrets | Pat van Dyke | x | Andy Stechishin |
ex officio | Invited Guests | Observers | HL7 Staff | ||||
. | Don Mon (HL7 Chair) w/vote | x | John Roberts | x | Brian Pech | regrets | Lynn Laakso |
. | Bob Dolin (Vice Chair) |
. | . | x | Don Lloyd | x | Dave Hamill |
. | Chuck Jaffe (CEO) |
. | . | . | . | ||
Agenda
Housekeeping
- Introduction of visitors (including declaration of interests)
- Agenda review and approval - Austin Kreisler
- Approve Minutes of 2013-11-18 TSC Call Agenda
Governance
- Approval items:
- TRAC governance point on project scope deadline
Management
- Review action items –
- Andy, with Freida, Ken McCaslin, and John Roberts will work on IG definition and conformance and inviting Rob Snelick;
- Calvin and Lorraine, aided by Jean will work on DAM desirable consistency value proposition, and conformance definition.
- TRAC to recommend updated WGH metrics
- Approval items for today's review
- 2014Jan Ballot review - Reconciliation deadline was 2013-11-24, please review request for new product family name
- Approval items from e-vote this past week: approved 5/0/0 with AdHoc, ArB, Affiliate, DESD and T3SD voting
- Withdrawal request for HL7 Version 3 Standard: Care Provision; Professional Services, Release 1 for PCWG of DESD at Project Insight # 103 and TSC Tracker 2796.
- Project Scope Statement for HL7 Clinical Genomics Domain Information Model(s) at Project Insight # 1050 and TSC Tracker 2797 for CG WG of SSD SD (UV-Realm project)
- DSTU Publication request for HL7 Version 2 Implementation Guide: Implementing the Virtual Medical Record for Clinical Decision Support (vMR-CDS), Release 1 for CDS of DESD for 24 months at Project Insight # 184 and TSC Tracker 2800.
- Project Approval request for Clinical Quality Common Metadata for CQI of DESD at Project Insight # 1042 and TSC Tracker 2803.
- Project Approval request for Version 2.x Example Verification and Management for (V2) Publishing of T3SD at Project Insight # 1056 and TSC Tracker 2805.
- Project Approval request for 2014 Annual Updates to the Project Scope Statement Template and Project Approval Process for PS of T3SD at Project Insight # 1053 and TSC Tracker 2804.
- Discussion topics:
- Conceptual and Domain Analysis model product family naming (cross-paradigm)
- Tooling Dashboard (Andy)
- V2 Publishing Issue (Brian Pech)
- Reports: (attach written reports below from Steering Divisions et al.)
- ArB BAM-lite progress and BAM task force
- Product Line Architecture program
- FGB/FMG updates (FGB did not meet last week
- TRAC
- US Realm Task Force
- UDI Task Force
- SAIF Architecture Program
- Open Issues List
Minutes
Minutes/Conclusions Reached:
Housekeeping
- Introduction of visitors (including declaration of interests)-Brian Pech for V2 Publishing Issue and Don Lloyd for 2014 Jan Ballot review
- Agenda review and approval - Austin Kreisler
- Approve Minutes of 2013-11-18 TSC Call Agenda - Approved unanimously
Governance
- Approval items:
- TRAC governance point on project scope deadline
- Tabled until Pat can attend a TSC call.
- TRAC governance point on project scope deadline
Management
- Review action items –
- Andy, with Freida, Ken McCaslin, and John Roberts will work on IG definition and conformance and inviting Rob Snelick;
- Freida: The group has not had a chance to have a call regarding IG definition and conformance
- Calvin and Lorraine, aided by Jean will work on DAM desirable consistency value proposition, and conformance definition.
- Lorraine/Calvin: DAM desirable consistency value proposition and conformance definition
- Different groups are creating DAMs for different purposes.
- Calvin: How wide of scope should the resolution be?
- Austin: Not sure of the answer. Perhaps they should come back with a recommendation otherwise we’d be casting too wide of net
- Calvin: Will go back and focus on DAMs that drive towards standards
- TRAC to recommend updated WGH metrics
- Tabled until someone that attended that TRAC meeting is on the TSC call
- Andy, with Freida, Ken McCaslin, and John Roberts will work on IG definition and conformance and inviting Rob Snelick;
- Approval items for today's review
- 2014Jan Ballot review - Reconciliation deadline was 2013-11-24, please review request for new product family name
- Review request for a new product family name
- Normally we name things “HL7 V3 Standard”
- The Templates WG wanted to name it “HL7 Templates Standard...”
- The Templates WG originally wanted just “HL7 Templates”
- The question back to theTemplates Work Group is whether they still believe this is a V3 standard.
- Woody: Does it need a V3 title in order to be published?
- John Roberts: Templates WG would rather not have V3 in the title
- Austin: If Templates WG is fine as is, then the TSC is fine letting it be as is
- Review request for a new product family name
- 2014Jan Ballot review - Reconciliation deadline was 2013-11-24, please review request for new product family name
- 2014Jan Ballot Review
- HL7 Version 3 Implementation Guide: URL-Based Implementations of the Context-Aware Information Retrieval (Infobutton) Domain, Release 4 (1st Normative Ballot) – Project Insight ID: 876
- Did the WG notify the TSC that it was going to Normative? (Yes, they did; TSC approved via Tracker 2755 on 2013-10-7).
- It did have a DSTU ballot in 2012 December
- 2014Jan Ballot Review
- HL7 Version 3 Standard: Context-Aware Knowledge Retrieval Application (Infobutton); Knowledge Request, Release 2 (1st Normative Ballot) – Project Insight ID: 875
- Did the WG notify the TSC that it was going to Normative? (Yes, they did; TSC approved via Tracker 2754 on 2013-10-7)
- HL7 Version 3 Standard: Clinical Statement CMETs, Release 1 (1st Normative Ballot) – Project Insight ID: 266
- Needs a new PSS for this item
- HL7 Version 3 Standard: Privacy, Access and Security Services; Security Labeling Service, Release 1 (1st Normative Ballot) – Project Insight ID: 1017
- Did the WG notify the TSC that it was going to Normative?
- This should be project 1046, not 1017; 1046 was approved by the TSC on 2013-10-21.\
- Austin to ask Mike Davis: What has prompted the major change in the schedule that was previously approved by the TSC?
- Hold off on approving the Normative ballots until the above action items are resolved
- Informative Ballot Items
- Nothing outstanding to note.
- Constable motions to approves the Informative balloted items; multiple seconds.
- Informative ballot items unanimously approved
- DSTU Ballot Items
- HL7 Virtual Medical Record for Clinical Decision Support (vMR-CDS) Logical Model, Release 2 (1st DSTU Ballot) – Project Insight ID: 1017 – Reconciliation has been completed for this DSTU ballot
- HL7 Virtual Medical Record for Clinical Decision Support (vMR-CDS) Templates, Release 1 - US Realm (1st DSTU Ballot) – Project Insight ID: 1030 – Reconciliation has been completed for this DSTU ballot
- With the DSTU ballot items, the CG work group is a typo. Each item has the correct Work Group within the identifier. One item to note:
- HL7 Virtual Medical Record for Clinical Decision Support (vMR-CDS) XML Specification, Release 1 (1st DSTU Ballot) – Project Insight ID: 1016
- ITS is actually running this project, not CG. CDS is a secondary sponsor.
- Don confirmed that the ballot request is correct. Reconciliation has been completed for this DSTU ballot
- John Quinn motions to approve the DSTU balloted items; Hall seconded. Unanimously approved
- Will pick up the review document next meeting at the Alternate Ballot Dates section.
- Approval items from e-vote this past week: approved 5/0/0 with AdHoc, ArB, Affiliate, DESD and T3SD voting
- Withdrawal request for HL7 Version 3 Standard: Care Provision; Professional Services, Release 1 for PCWG of DESD at Project Insight # 103 and TSC Tracker 2796.
- Project Scope Statement for HL7 Clinical Genomics Domain Information Model(s) at Project Insight # 1050 and TSC Tracker 2797 for CG WG of SSD SD (UV-Realm project)
- DSTU Publication request for HL7 Version 2 Implementation Guide: Implementing the Virtual Medical Record for Clinical Decision Support (vMR-CDS), Release 1 for CDS of DESD for 24 months at Project Insight # 184 and TSC Tracker 2800.
- Project Approval request for Clinical Quality Common Metadata for CQI of DESD at Project Insight # 1042 and TSC Tracker 2803.
- Project Approval request for Version 2.x Example Verification and Management for (V2) Publishing of T3SD at Project Insight # 1056 and TSC Tracker 2805.
- Project Approval request for 2014 Annual Updates to the Project Scope Statement Template and Project Approval Process for PS of T3SD at Project Insight # 1053 and TSC Tracker 2804.
- Discussion topics:
- Conceptual and Domain Analysis model product family naming (cross-paradigm)
- Tooling Dashboard (Andy)
- V2 Publishing Issue (Brian Pech)
- V2.8 nor V2.8.1 has not been published yet.
- OO is suggesting V2.9 work be postponed until May 2014 and would like agreement of this decision by the TSC;
- V2 Publishing is comfortable postponing it, but wanted consensus from the TSC before finalizing that decision.
- Given the editors need time to update examples for v2.9, Austin agrees with the postponement. Frieda agrees with that, and reiterated that many emails conveyed the same sentiment. Mead agreed stating that there is not rush to move v2.9.
- Brian doesn’t need a motion, just wanted agreement by the TSC.
- Reports: (attach written reports below from Steering Divisions et al.)
- ArB BAM-lite progress and BAM task force
- Product Line Architecture program
- FGB/FMG updates (FGB did not meet last week
- TRAC
- US Realm Task Force
- UDI Task Force
- SAIF Architecture Program
- Open Issues List
Please don't forget to hang up from the conference call (VOIP users)
Next Steps
Actions (Include Owner, Action Item, and due date)
| |||
Next Meeting/Preliminary Agenda Items |
© 2013 Health Level Seven® International. All rights reserved.