2012-11-26 TSC Call Minutes
Jump to navigation
Jump to search
TSC Agenda/Minutes
Meeting Info/Attendees
HL7 TSC Meeting Minutes Location: call 770-657-9270 using code 985371# |
Date: 2012-11-26 Time: 11:00 AM U.S. Eastern | |
Facilitator: Austin Kreisler | Note taker(s): Lynn Laakso |
Quorum = chair + 5 including 2 SD represented | yes/no | ||||||
Chair/CTO | ArB | International Affiliate Rep | Ad-Hoc | ||||
Austin Kreisler | Charlie Mead | Ravi Natarajan | Melva Peters | ||||
John Quinn | Ron Parker | Giorgio Cangioli | |||||
Domain Experts | Foundation and Technology | Structure and Semantic Design | Technical and Support Services | ||||
. | Ed Tripp | Woody Beeler | Calvin Beebe | Freida Hall | |||
regrets | Mead Walker | Tony Julian | . | Pat van Dyke | . | Patrick Loyd | |
ex officio | Invited Guests | Observers | HL7 Staff | ||||
. | Don Mon (HL7 Chair) w/vote | Jean Duteau, Affiliate Representative-elect | Brian Pech | . | Lynn Laakso | ||
. | Bob Dolin (Vice Chair) |
Andy Stechishin, co-chair-elect | . | obs2 | . | ||
. | Chuck Jaffe (CEO) |
. | . | . | . | ||
Agenda
Housekeeping
- Introduction of visitors (including declaration of interests)
- Agenda review and approval - Austin Kreisler
- Approve Minutes of 2012-11-19 TSC Call Agenda
Governance
- Governance Discussion topics:
- Datatypes Task Force recommendation: review and feedback from Steering Divisions.
- see wiki page
- Updated proposed changes in wording to the GOM for TSC attendance at WGMs - Austin/Freida
- Review HL7 Terminology Authority - Policies and Procedures from Vocab WG of FTSD, in accord with PI# 806, at TSC Tracker # 2416.
- Datatypes Task Force recommendation: review and feedback from Steering Divisions.
Management
- Approval items:
- Ballot approval list for 2013Jan ballot cycle: last week's approvals are at http://gforge.hl7.org/gf/download/trackeritem/2409/9873/2013JanTSCApprovalList_with_recon_notes_upd.doc
- Postponed from 2012-11-12 call - exceptions of
- HL7 Version 3 SAIF Conceptual Specification: Laboratory Orders, Release 1 (1st DSTU Ballot) – Project Insight ID: 587; Unique Ballot ID: V3DAM_LABORD_R1_D1_2013JAN. OO: Note that this name indicates a new general category.
- HL7 Version 3 Standard: Pharmacy CMETs, Release 1 (5th Normative Ballot) – Project Insight ID: 249. Unique Ballot ID: V3_RX_CMET_R1_N5_2013JAN. RX: This last balloted in 2011 JAN; due to the long delay, it is suggested that the ballot pool be opened to general enrollment. Also, due to the issues surrounding the balloting of CMETs, I strongly suggest that we postpone any balloting of CMETs until it is clear how we will be handling future releases of CMETs, tracking of reconciliations, etc.
- continued ballots for Infobutton IG R4 - previously passed ballot; and eMeasure will not be ready
- Need to review guidance on ability to publish Informative or DSTU after successful ballot and reconciliation, even if the reconciliation identifies substantive change. Substantive change forces reballot at the Normative level.
- Postponed from 2012-11-12 call - exceptions of
- Proposed motions (part II) for withdrawal of standards for ANSI cleanup, at TSC Tracker 2365
- Ballot approval list for 2013Jan ballot cycle: last week's approvals are at http://gforge.hl7.org/gf/download/trackeritem/2409/9873/2013JanTSCApprovalList_with_recon_notes_upd.doc
Standard | Responsible WG | Last Balloted | Notes |
HL7 Version 3 Standard: Laboratory | Orders and Observations | May 2006 at Committee 9 | Passed by the numbers but never advanced since 2006. |
HL7 Version 3 Standard: Personnel Management, Release 1 - Human Resource/Regulation Topic, Release 1 | Patient Administration | May 2006 at For comments only | Should be withdrawn; no response from WG |
HL7 Version 3 Standard: Personnel Management, Release 2 | Patient Administration | May 2006 – For comments only | Balloted comment-only 2006 May after Committee ballot 2006 Jan. No further activity. Withdrawal leaves Personnel Mgmt R1 needing ANSI re-affirmation from 2005 in 2013May cycle; Should be withdrawn; no response from WG |
HL7 Version 3 Standard: Scheduling, Release 2 | Patient Administration | Sep 2007 at the membership2 level | Should be withdrawn; no response from WG R1 needing ANSI re-affirmation in 2013May cycle |
HL7 Version 3 Standard: Patient Administration, Release 1 | Patient Administration | January 2006 membership level. Expired DSTU since 2007 | Should be withdrawn; After withdrawal, should be resubmitted to ballot normative |
HL7 Version 3 Standard: Medication, Release 1 | Pharmacy | Sept 2006 – Committee 3 | WG voted to withdraw 2012-11-12 |
HL7 Version 3 Standard: Pharmacy; Device Order, Release 1 | Pharmacy | May 2007 as an informative document | WG voted to withdraw 2012-11-05 |
HL7 Version 3 Standard: Pharmacy; Patient Medication Contraindication Query, Release 1 | Pharmacy | May 2007 as an informative document | WG voted to withdraw 2012-11-05 |
HL7 Version 3 Standard: Pharmacy; Device Dispense and Supply Event, Release 1 | Pharmacy | May 2007 as an informative document | WG voted to withdraw 2012-11-05 |
HL7 Version 3 Standard: Pharmacy; Generic Patient-Related Pharmacy Query, Release 1 | Pharmacy | May 2007 at Committee level | WG voted to withdraw 2012-11-05 |
HL7 Version 3 Standard: Specification and Use of Reusable Information Constraint Templates, Release 1 | Templates | Nov 2007 at DSTU4. Expired DSTU as of Feb 2010 | Should be withdrawn; no response from WG |
- Results of e-vote this week: All were approved 6/0/0 with 3 Steering Divisions, 2 Affiliate Reps, and an ad-hoc (in a pear tree) submitting votes
- Approve 2013 Project Scope Statement Template at TSC Tracker # 2410
- DSTU Publication Request of HL7 Version 3 Standard: Order Set Publication, Release 1 for CDS of DESD at Project Insight # 259 and TSC Tracker # 2411
- Project Approval Request of Evaluate NLM Vocabulary Submission Tool (USCRS) at HL7 for Vocab of FTSD, cosponsored by Electronic Services WG and Tooling WG of T3SD at Project Insight # 945 and TSC Tracker # 2412
- Project Approval Request of HL7 Vocabulary Maintenance in the IHTSDO Workbench for Vocab of FTSD, cosponsored by Tooling WG of T3SD at Project Insight # 947 and TSC Tracker # 2414
- Project Approval Request of WGM Room Assignment Project 2013 for ES of T3SD at Project Insight # 944 and TSC Tracker # 2415
- Management Discussion topics:
- CTO Evaluations due by Friday November 30th - HQ is challenging TSC to have 100% participation
- Formalization of process for requesting publication of errata - from TSC Tracker # 2403
- Reports:
- FMG update
Supporting Documents
- See links
Minutes
Minutes/Conclusions Reached:
Next Steps
Actions (Include Owner, Action Item, and due date)
| |||
Next Meeting/Preliminary Agenda Items |
© 2012 Health Level Seven® International. All rights reserved.