2012-11-26 TSC Call Minutes
Jump to navigation
Jump to search
TSC Agenda/Minutes
Meeting Info/Attendees
HL7 TSC Meeting Minutes Location: call 770-657-9270 using code 985371# |
Date: 2012-11-19 Time: 11:00 AM U.S. Eastern | |
Facilitator: Austin Kreisler | Note taker(s): Lynn Laakso |
Quorum = chair + 5 including 2 SD represented | yes/no | ||||||
Chair/CTO | ArB | International Affiliate Rep | Ad-Hoc | ||||
Austin Kreisler | Charlie Mead | Ravi Natarajan | Melva Peters | ||||
John Quinn | Ron Parker | Giorgio Cangioli | |||||
Domain Experts | Foundation and Technology | Structure and Semantic Design | Technical and Support Services | ||||
. | Ed Tripp | Woody Beeler | Calvin Beebe | Freida Hall | |||
Mead Walker | Tony Julian | . | Pat van Dyke | . | Patrick Loyd | ||
ex officio | Invited Guests | Observers | HL7 Staff | ||||
. | Don Mon (HL7 Chair) w/vote | Jean Duteau, Affiliate Representative-elect | Brian Pech | . | Lynn Laakso | ||
. | Bob Dolin (Vice Chair) |
Andy Stechishin, co-chair-elect | . | obs2 | . | ||
. | Chuck Jaffe (CEO) |
. | . | . | . | ||
Agenda
Housekeeping
- Introduction of visitors (including declaration of interests)
- Agenda review and approval - Austin Kreisler
- Approve Minutes of 2012-11-19 TSC Call Agenda
Governance
- Governance Discussion topics:
- Datatypes Task Force recommendation: review and feedback from Steering Divisions.
- see wiki page
- Review draft WGH RACI chart (Austin)for People/Roles for the WGH Precept.
- Updated proposed changes in wording to the GOM for TSC attendance at WGMs - Austin/Freida
- Datatypes Task Force recommendation: review and feedback from Steering Divisions.
Management
- Review action items –
- Austin will contact ES about a front end for GForge to centralize change requests for standards/artifact enhancement that still thwarts the 'bots
- Facilitator training tutorials as webinars; Melva will put together a project scope statement
- Approval items:
- Tabled Motion for Work Group Formation Request from DESD for the Clinical Quality Work Group at TSC Tracker #2395
- Ballot approval list for 2013Jan ballot cycle: last week's approvals are at http://gforge.hl7.org/gf/download/trackeritem/2409/9873/2013JanTSCApprovalList_with_recon_notes_upd.doc
- Postponed from 2012-11-12 call - exception of
- HL7 Version 3 SAIF Conceptual Specification: Laboratory Orders, Release 1 (1st DSTU Ballot) – Project Insight ID: 587; Unique Ballot ID: V3SAIF_LABORD_R1_D1_2013JAN. OO: Note that this name indicates a new general category.
- HL7 Version 3 Standard: Pharmacy CMETs, Release 1 (5th Normative Ballot) – Project Insight ID: 249. Unique Ballot ID: V3_RX_CMET_R1_N5_2013JAN. RX: This last balloted in 2011 JAN; due to the long delay, it is suggested that the ballot pool be opened to general enrollment. Also, due to the issues surrounding the balloting of CMETs, I strongly suggest that we postpone any balloting of CMETs until it is clear how we will be handling future releases of CMETs, tracking of reconciliations, etc.
- continued ballots for Infobutton IG R4 - previously passed ballot; and eMeasure will not be ready
- Postponed from 2012-11-12 call - exception of
- Proposed motions (part II) for withdrawal of standards for ANSI cleanup, at TSC Tracker 2365
Standard | Responsible WG | Last Balloted | Notes |
HL7 Version 3 Standard: Laboratory | Orders and Observations | May 2006 at Committee 9 | Passed by the numbers but never advanced since 2006. |
HL7 Version 3 Standard: Personnel Management, Release 1 - Human Resource/Regulation Topic, Release 1 | Patient Administration | May 2006 at For comments only | Should be withdrawn; no response from WG |
HL7 Version 3 Standard: Personnel Management, Release 2 | Patient Administration | May 2006 – For comments only | Balloted comment-only 2006 May after Committee ballot 2006 Jan. No further activity. Withdrawal leaves Personnel Mgmt R1 needing ANSI re-affirmation from 2005 in 2013May cycle; Should be withdrawn; no response from WG |
HL7 Version 3 Standard: Scheduling, Release 2 | Patient Administration | Sep 2007 at the membership2 level | Should be withdrawn; no response from WG R1 needing ANSI re-affirmation in 2013May cycle |
HL7 Version 3 Standard: Patient Administration, Release 1 | Patient Administration | January 2006 membership level. Expired DSTU since 2007 | Should be withdrawn; After withdrawal, should be resubmitted to ballot normative |
HL7 Version 3 Standard: Medication, Release 1 | Pharmacy | Sept 2006 – Committee 3 | WG voted to withdraw 2012-11-12 |
HL7 Version 3 Standard: Pharmacy; Device Order, Release 1 | Pharmacy | May 2007 as an informative document | WG voted to withdraw 2012-11-05 |
HL7 Version 3 Standard: Pharmacy; Patient Medication Contraindication Query, Release 1 | Pharmacy | May 2007 as an informative document | WG voted to withdraw 2012-11-05 |
HL7 Version 3 Standard: Pharmacy; Device Dispense and Supply Event, Release 1 | Pharmacy | May 2007 as an informative document | WG voted to withdraw 2012-11-05 |
HL7 Version 3 Standard: Pharmacy; Generic Patient-Related Pharmacy Query, Release 1 | Pharmacy | May 2007 at Committee level | WG voted to withdraw 2012-11-05 |
HL7 Version 3 Standard: Specification and Use of Reusable Information Constraint Templates, Release 1 | Templates | Nov 2007 at DSTU4. Expired DSTU as of Feb 2010 | Should be withdrawn; no response from WG |
- Results of e-vote this week:
- Approve 2013 Project Scope Statement Template at TSC Tracker # 2410
- DSTU Publication Request of HL7 Version 3 Standard: Order Set Publication, Release 1 for CDS of DESD at Project Insight # 259 and TSC Tracker # 2411
- DSTU Publication Request of HL7 Version 3 Standard: Order Set Publication, Release 1 for CDS of DESD at Project Insight # 259 and TSC Tracker # 2411
- Project Approval Request of Evaluate NLM Vocabulary Submission Tool (USCRS) at HL7 for Vocab of FTSD, cosponsored by Electronic Services WG and Tooling WG of T3SD at Project Insight # 945 and TSC Tracker # 2412
- Project Approval Request of HL7 Vocabulary Maintenance in the IHTSDO Workbench for Vocab of FTSD, cosponsored by Tooling WG of T3SD at Project Insight # 947 and TSC Tracker # 2414
- Project Approval Request of WGM Room Assignment Project 2013 for ES of T3SD at Project Insight # 944 and TSC Tracker # 2415
- Management Discussion topics:
- Formalization of process for requesting publication of errata - from TSC Tracker # 2403
- Review HL7 Terminology Authority - Policies and Procedures from Vocab WG of FTSD, in accord with PI# 806, at TSC Tracker # 2416.
- Reports:
- FMG update
Supporting Documents
- See links
Minutes
Minutes/Conclusions Reached:
Next Steps
Actions (Include Owner, Action Item, and due date)
| |||
Next Meeting/Preliminary Agenda Items |
© 2012 Health Level Seven® International. All rights reserved.