Difference between revisions of "2017-06-19 TSC Call Agenda"
Jump to navigation
Jump to search
Anne wizauer (talk | contribs) (→Agenda) |
Anne wizauer (talk | contribs) (→Agenda) |
||
Line 83: | Line 83: | ||
#**Complete | #**Complete | ||
#*Austin will research instances in which the TSC has asserted that STUs and Normatives should follow the same reconciliation process. | #*Austin will research instances in which the TSC has asserted that STUs and Normatives should follow the same reconciliation process. | ||
− | #Approval items from last week's e-vote: | + | #Approval items from last week's e-vote '''referred for discussion''': |
#*[http://gforge.hl7.org/gf/download/trackeritem/13524/15497/HL7_Publication_Request_Template_2017Jun.docx Publication Request Template] review and approval at [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=13524&start=0 TSC Tracker 13524] | #*[http://gforge.hl7.org/gf/download/trackeritem/13524/15497/HL7_Publication_Request_Template_2017Jun.docx Publication Request Template] review and approval at [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=13524&start=0 TSC Tracker 13524] | ||
+ | #**'''Referred by Freida:''' | ||
+ | #***Unless there is a compelling reason, I suggest we should retain the option for the WG to specify the STU length, vs. assuming all will be 24 months. We have two this week that requested a 12 month STU period. | ||
+ | #***Reference to GOM 13.02.06.02 needs to be updated to “13.02.07.02 Extending the Trial Use Period or Reopening an STU for Trial Use” | ||
+ | #***As GOC liaison, I submitted attached TSC change request to GOM re: STU extensions, thus we will see a clarification in the September GOM after it clears the Peer Review process. The GOC favored iterative 1 year extensions (when warranted), vs. TSC granting a 2 year or 3 year extension request. Just FYI, I think Lynn’s proposed change is in sync with pending GOM revisions. | ||
+ | #Approval items from last week's e-vote approved 0/0/0: | ||
#*[http://gforge.hl7.org/gf/download/trackeritem/13523/15496/HL7_CQLANG_R1_D2_2017JAN_PublicationRequest%202.docx STU Publication Request] for ''HL7 Cross-Paradigm Specification: Clinical Quality Language, Release 1'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=1108 Project Insight 1108] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=13523&start=0 TSC Tracker 13523] | #*[http://gforge.hl7.org/gf/download/trackeritem/13523/15496/HL7_CQLANG_R1_D2_2017JAN_PublicationRequest%202.docx STU Publication Request] for ''HL7 Cross-Paradigm Specification: Clinical Quality Language, Release 1'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=1108 Project Insight 1108] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=13523&start=0 TSC Tracker 13523] | ||
#*[http://gforge.hl7.org/gf/download/trackeritem/13522/15495/Work%20Group%20Dissolution%20Template%20Child%20Health%202017%201.docx Dissolution Request] for the Child Health WG at [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=13522&start=0 TSC Tracker 13522] | #*[http://gforge.hl7.org/gf/download/trackeritem/13522/15495/Work%20Group%20Dissolution%20Template%20Child%20Health%202017%201.docx Dissolution Request] for the Child Health WG at [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=13522&start=0 TSC Tracker 13522] |
Revision as of 14:20, 16 June 2017
TSC Agenda/Minutes
Meeting Info/Attendees
Standing Conference Calls
TSC will hold a Conference Call at 11AM Eastern time, each Monday except during scheduled face-to-face Working Group Meetings unless otherwise noted at TSC_Minutes_and_Agendas.
- GoToMeeting at https://global.gotomeeting.com/join/426505829 using VOIP
- For those without access to microphone/speakers:
- US: +1 (224)501-3318
- Canada: +1 (647)497-9379
- Italy: +39 0 230 57 81 80
- Access Code: 426-505-829
- GoToMeeting ID: 426-505-829
HL7 TSC Meeting Minutes Location: GoToMeeting ID: 426-505-829 |
Date: 2017-06-19 Time: 11:00 AM U.S. Eastern | |
Facilitator: Ken McCaslin | Note taker(s): Anne Wizauer |
Quorum = chair + 5 including 2 SD represented | yes/no | ||||||
Chair/CTO | ArB | International Affiliate Rep | Ad-Hoc | ||||
. | Ken McCaslin | . | Tony Julian | . | Jean Duteau | . | Freida Hall, GOM Expert |
. | Wayne Kubick | . | Lorraine Constable | . | Giorgio Cangioli | . | |
Domain Experts | Foundation and Technology | Structure and Semantic Design | Technical and Support Services | ||||
. | Melva Peters | . | Russ Hamm | . | Calvin Beebe | . | Andy Stechishin |
. | John Roberts | . | Paul Knapp | . | Austin Kreisler | . | Sandra Stuart |
. | . | . | . | ||||
ex officio | Invited Guests | Observers | HL7 Staff | ||||
. | Pat Van Dyke (HL7 Chair) w/vote | . | . | obs1 | . | Anne Wizauer | |
. | Chuck Jaffe (CEO) |
. | . | . | obs2 | . |
|
. | . | . | . | . | |||
Agenda
- Housekeeping
- Introduction of visitors (including declaration of interests)
- Agenda review and approval -
- Approve Minutes of 2017-06-12 TSC Call Agenda
- Homework
- Review message to WGs regarding getting mission and charters to SD for review
- Review action items –
- Melva, Jean, John, Calvin will review existing WGs and report at the 2017-06-19 TSC meeting
- Ken will follow up with Lynn to find out about out of cycle timelines re: upcoming FHIR ballots
- Calvin will assist with the FHIR naming issue. Lloyd will provide some examples.
- Ken will draft message to WGs regarding mission and charter review guidelines for review on 2017-06-19 call
- Anne to add link under additional resources to the TSC wiki for TSC decisions
- Complete
- Wayne to ask EC what the costs are for Sunday at WGM so that, along with existing Mon – Fri rate, we could offer a similarly discounted Sunday – Friday rate as well
- Ken to contact CQI WG regarding inapprorpiate disposition of negatives on HL7 Version 3 Implementation Guide: Clinical Quality Language (CQL)-based Health Quality Measure Format (HQMF) - Release 1, STU 2 - US Realm
- Anne to re-send FHIR path request for e-vote
- Complete
- Austin will research instances in which the TSC has asserted that STUs and Normatives should follow the same reconciliation process.
- Approval items from last week's e-vote referred for discussion:
- Publication Request Template review and approval at TSC Tracker 13524
- Referred by Freida:
- Unless there is a compelling reason, I suggest we should retain the option for the WG to specify the STU length, vs. assuming all will be 24 months. We have two this week that requested a 12 month STU period.
- Reference to GOM 13.02.06.02 needs to be updated to “13.02.07.02 Extending the Trial Use Period or Reopening an STU for Trial Use”
- As GOC liaison, I submitted attached TSC change request to GOM re: STU extensions, thus we will see a clarification in the September GOM after it clears the Peer Review process. The GOC favored iterative 1 year extensions (when warranted), vs. TSC granting a 2 year or 3 year extension request. Just FYI, I think Lynn’s proposed change is in sync with pending GOM revisions.
- Referred by Freida:
- Publication Request Template review and approval at TSC Tracker 13524
- Approval items from last week's e-vote approved 0/0/0:
- STU Publication Request for HL7 Cross-Paradigm Specification: Clinical Quality Language, Release 1 at Project Insight 1108 and TSC Tracker 13523
- Dissolution Request for the Child Health WG at TSC Tracker 13522
- STU Publication Request by the ITS WG of the FTSD for HL7 Cross-Paradigm Specification: FHIRPath at Project Insight 1237 and TSC Tracker 13165
- Approval items for this week:
- Discussion topics:
- Alignment between Normative and STU Ballot dispositions
- STU Extension Request by the PHER WG of the DESD for HL7 CDA R2 Implementation Guide: National Health Care Surveys (NHCS), R1 DSTU Release 1.2 - US Realm at Project Insight 1002 and TSC Tracker 13429 for 28 months
- Width/breadth of CIMI project - continued from lat week
- Removing co-chair email addresses from www.HL7.org - Wayne
- Carryover topics from WGM:
- EST/Tooling update
- ARB Recommendations to TSC:
- Project Scope Statements not include acronyms that are not spelled out. Rationale: outsiders will use the search function to find the project. Example is the LOINC – IVD Test Code (LIVD) Mapping – you can search project insight for LIVD, New members would search "invitro device" it will not show up.
- CIMI project: Should be reviewed for compliance with HL7 processes. Should be requested to produce an integration strategy.
- Product family addition to support CIMI
- SGB recommendations regarding ballot level change requests - Calvin
- Review of draft SGB recommendation on adding a category of ballot disposition for items under consideration for the future
- Open Issues List/Parking Lot
- Wayne and Freida working on co-chair handbook update process
- FHIR Ballot level issues - waiting for written explanation from Grahame
- Calvin/Austin will work on pulling out WG relationships and making a mapping for September meeting
Minutes/Conclusions Reached:
Next Steps
Actions (Include Owner, Action Item, and due date)
| |||
Next Meeting/Preliminary Agenda Items |
© 2017 Health Level Seven® International. All rights reserved.