Difference between revisions of "2016-05-11 TSC WGM Agenda"
Jump to navigation
Jump to search
Anne wizauer (talk | contribs) |
Anne wizauer (talk | contribs) |
||
Line 72: | Line 72: | ||
#Review [http://gforge.hl7.org/gf/download/docmanfileversion/9084/14007/4plusprojects.xlsx projects open 4+ years] | #Review [http://gforge.hl7.org/gf/download/docmanfileversion/9084/14007/4plusprojects.xlsx projects open 4+ years] | ||
#e-Vote item referred for discussion: | #e-Vote item referred for discussion: | ||
− | #* | + | #* [http://gforge.hl7.org/gf/download/trackeritem/9950/14232/HL7%20Project%20Scope%20Statement%20v2015.1_CIMI_POC_d.docxCIMI Clinical Model Proof of Concept - updated PSS] |
#**Referred by Freida: New product definition checked - is further TSC action required? | #**Referred by Freida: New product definition checked - is further TSC action required? | ||
#**ARB: SD approval missing (resolved); most dates on the timeline have passed (also noted by Wayne); Investigative project not checked; ARB may be interested in the project | #**ARB: SD approval missing (resolved); most dates on the timeline have passed (also noted by Wayne); Investigative project not checked; ARB may be interested in the project | ||
#Discussion | #Discussion | ||
#*[http://gforge.hl7.org/gf/download/trackeritem/9986/14231/HL7PSS-FHIR%20TechSupport2016-Repository%20Process%20V2%203%20work-in-process%20May%209_V4%20CLEAN.docx FHIR Repository Process and Requirements Phase 1 PSS] (Melva, John) | #*[http://gforge.hl7.org/gf/download/trackeritem/9986/14231/HL7PSS-FHIR%20TechSupport2016-Repository%20Process%20V2%203%20work-in-process%20May%209_V4%20CLEAN.docx FHIR Repository Process and Requirements Phase 1 PSS] (Melva, John) | ||
+ | #*Proposal to create a new Open Source Workgroup as part of the Agreement to merge Open Health Tools into HL7 (Wayne) | ||
#*Zulip (Lorraine) | #*Zulip (Lorraine) | ||
Revision as of 13:19, 11 May 2016
TSC Saturday meeting for Montreal WGM
back to TSC Minutes and Agendas
TSC WGM Agenda/Minutes
HL7 TSC Meeting Minutes Location: |
Date: 2015-10-03 Time: (9:00 am Eastern) | |
Facilitator: Ken McCaslin | Note taker(s): Anne Wizauer | |
Attendee | Name | Affiliation |
? | Calvin Beebe | HL7 SSD SD Co-Chair |
Regrets | Woody Beeler | TSC Member Emeritus |
? | Giorgio Cangioli | HL7 Affiliate Representative |
? | Lorraine Constable | HL7 ARB Co-Chair |
? | Gora Datta | HL7 SSD SD Co-Chair |
? | Jean Duteau | HL7 Affiliate Representative |
? | Freida Hall | Adhoc Member - GOM Expert |
? | Russ Hamm | HL7 FTSD Co-chair |
? | Stan Huff | HL7 Immediate Past Board Chair (member ex officio w/ vote) |
? | Chuck Jaffe | HL7 CEO (member ex officio w/o vote) |
? | Tony Julian | HL7 ARB Co-Chair |
? | Paul Knapp | HL7 FTSD Co-Chair |
? | Austin Kreisler | Adhoc Member |
? | Wayne Kubick | HL7 CTO (TSC member ex officio w/vote) |
? | Ken McCaslin (Chair) | |
? | Anne Wizauer(scribe, non-voting) | HL7 HQ |
? | Melva Peters | HL7 DESD Co-Chair |
? | John Roberts | HL7 DESD Co-chair |
? | Andy Stechishin | HL7 T3SD Co-Chair |
? | Sandra Stuart | HL7 T3SD Co-Chair |
? | Pat Van Dyke | HL7 Board Chair (member ex officio w/ vote) |
Quorum Requirements (Co-chair +5 with 2 SD Reps) Met: (yes/No) |
Agenda Topics
- Review projects open 4+ years
- e-Vote item referred for discussion:
- Clinical Model Proof of Concept - updated PSS
- Referred by Freida: New product definition checked - is further TSC action required?
- ARB: SD approval missing (resolved); most dates on the timeline have passed (also noted by Wayne); Investigative project not checked; ARB may be interested in the project
- Clinical Model Proof of Concept - updated PSS
- Discussion
- FHIR Repository Process and Requirements Phase 1 PSS (Melva, John)
- Proposal to create a new Open Source Workgroup as part of the Agreement to merge Open Health Tools into HL7 (Wayne)
- Zulip (Lorraine)
Minutes/Conclusions Reached:
Actions (Include Owner, Action Item, and due date)
|
Next Meeting/Preliminary Agenda Items
|