Difference between revisions of "2017-08-21 TSC Call Agenda"
Jump to navigation
Jump to search
(Created page with "__NOTOC__ ==TSC Agenda/Minutes == ===Meeting Info/Attendees=== {{:TSC Meetings}} Category:2017 TSC Minutes {|border="1" cellpadding="2" cellspacing="0" | width="0%" c...") |
|||
(10 intermediate revisions by 2 users not shown) | |||
Line 2: | Line 2: | ||
==TSC Agenda/Minutes == | ==TSC Agenda/Minutes == | ||
− | |||
− | |||
[[Category:2017 TSC Minutes]] | [[Category:2017 TSC Minutes]] | ||
Line 22: | Line 20: | ||
|colspan="2"|Chair/CTO ||colspan="2"|ArB ||colspan="2"|International Affiliate Rep ||colspan="2"|Ad-Hoc | |colspan="2"|Chair/CTO ||colspan="2"|ArB ||colspan="2"|International Affiliate Rep ||colspan="2"|Ad-Hoc | ||
|- | |- | ||
− | | ||Ken McCaslin|| ||Tony Julian||Regrets|| Jean Duteau|| ||Freida Hall, GOM Expert | + | |x ||Ken McCaslin||x ||Tony Julian||Regrets|| Jean Duteau||regrets ||Freida Hall, GOM Expert |
|- | |- | ||
− | | | + | |x||Wayne Kubick ||x||Lorraine Constable||x|| Giorgio Cangioli||.|| |
|- | |- | ||
|colspan="2" align="center" style="background:#f0f0f0;"|Domain Experts | |colspan="2" align="center" style="background:#f0f0f0;"|Domain Experts | ||
Line 31: | Line 29: | ||
|colspan="2" align="center" style="background:#f0f0f0;"|Technical and Support Services | |colspan="2" align="center" style="background:#f0f0f0;"|Technical and Support Services | ||
|- | |- | ||
− | | ||Melva Peters||.||Russ Hamm|| ||Calvin Beebe|| ||Andy Stechishin | + | |x ||Melva Peters||.||Russ Hamm|| ||Calvin Beebe||x ||Andy Stechishin |
|- | |- | ||
− | | ||John Roberts|| ||Paul Knapp|| ||Austin Kreisler|| ||Sandra Stuart | + | |x ||John Roberts||x ||Paul Knapp|| ||Austin Kreisler|| ||Sandra Stuart |
|- | |- | ||
|.|| ||. || ||.|| ||.|| | |.|| ||. || ||.|| ||.|| | ||
Line 44: | Line 42: | ||
|.||Pat Van Dyke (HL7 Chair) w/vote||.|| ||.||''obs1''|| regrets||Anne Wizauer | |.||Pat Van Dyke (HL7 Chair) w/vote||.|| ||.||''obs1''|| regrets||Anne Wizauer | ||
|- | |- | ||
− | |.||Chuck Jaffe (CEO) <s> vote</s>||.||.||.||''obs2''|| | + | |.||Chuck Jaffe (CEO) <s> vote</s>||.||.||.||''obs2''||x||Lynn Laakso |
Line 61: | Line 59: | ||
#*Agenda review and approval - | #*Agenda review and approval - | ||
#*Approve Minutes of [[2017-08-14 TSC Call Agenda]] | #*Approve Minutes of [[2017-08-14 TSC Call Agenda]] | ||
+ | #*Review gforge tracker https://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=1065 | ||
+ | #*Review WGM Agenda [[2017-09-09_TSC_WGM_Agenda]] | ||
#Review [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=494 action items] – | #Review [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=494 action items] – | ||
##Paul to update process for order of PSS review with suggestions from 2017-08-07 call | ##Paul to update process for order of PSS review with suggestions from 2017-08-07 call | ||
##Ken to send final Mission and Charter Review Checklist to steering divisions for use in review process | ##Ken to send final Mission and Charter Review Checklist to steering divisions for use in review process | ||
##*Anne to set up a private place on Gforge where people can post. | ##*Anne to set up a private place on Gforge where people can post. | ||
+ | ##**Private area to upload M&Cs is located [https://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=1065 here]. SD cochairs can make a tracker item and upload checklists into the tracker. | ||
##Melva to put together notes on existing WG review meeting with Jean, John, and Calvin | ##Melva to put together notes on existing WG review meeting with Jean, John, and Calvin | ||
##Calvin to put together recommendations on FHIR naming issue | ##Calvin to put together recommendations on FHIR naming issue | ||
##Austin to report back on ballot reconciliation sync project by September WGM | ##Austin to report back on ballot reconciliation sync project by September WGM | ||
##Calvin to resubmit powerpoint on ballot level change request for Anne to send out | ##Calvin to resubmit powerpoint on ballot level change request for Anne to send out | ||
+ | ##*View Calvin's document [https://gforge.hl7.org/gf/project/tsc/docman/Draft%20Documents/Ballot%20Level%20Change-R3.pptx here] | ||
##Wayne to forward STU Extension request by the PHER WG for HL7 Version 2.6 Implementation Guide: Critical Congenital Heart Defects (CCHD) pulse oximetry screening results, Release 1 to EC for consideration | ##Wayne to forward STU Extension request by the PHER WG for HL7 Version 2.6 Implementation Guide: Critical Congenital Heart Defects (CCHD) pulse oximetry screening results, Release 1 to EC for consideration | ||
#Approval items from last week's e-vote: | #Approval items from last week's e-vote: | ||
##[https://gforge.hl7.org/gf/download/trackeritem/13748/15647/HL7_Publication_Request_CDA_VRDR_20170810.docx STU Publication Request] by the PHER WG of the DESD for ''HL7 CDA® Release 2 Implementation Guide: Vital Records Death Reporting, Release 1 STU 2 - US Realm'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=859 Project Insight 859] and [https://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=13748&start=0 TSC Tracker 13748] | ##[https://gforge.hl7.org/gf/download/trackeritem/13748/15647/HL7_Publication_Request_CDA_VRDR_20170810.docx STU Publication Request] by the PHER WG of the DESD for ''HL7 CDA® Release 2 Implementation Guide: Vital Records Death Reporting, Release 1 STU 2 - US Realm'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=859 Project Insight 859] and [https://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=13748&start=0 TSC Tracker 13748] | ||
#Approval items for this week: | #Approval items for this week: | ||
− | ## | + | ##from Tony: a substantive change approved during ballot reconciliation was not applied to V2.9 Chapter 2.A section 2.a.75. We could apply to V2.9 after ballot closing, but this would force a new ballot in January 2017. InM is therefore requesting an extension of the ballot period for 30 days from the posting of the updated material. |
+ | ##*Motion by Tony (on behalf of V2 Publishing and InM): extend ballot closing date on Version 2.9 ballot to September 20 (from September 5) to allow for patching the content on the ballot. | ||
#Discussion topics: | #Discussion topics: | ||
##Review [http://www.hl7.org/documentcenter/public/wg/tsc/Template%20-%20out%20of%20cycle%20mtg.doc Out of Cycle Meeting Request form] | ##Review [http://www.hl7.org/documentcenter/public/wg/tsc/Template%20-%20out%20of%20cycle%20mtg.doc Out of Cycle Meeting Request form] | ||
##*ACTION: Anne to ask if an agreement/SOU has to be in place for a WG to hold an official OOC or joint meeting with another organization | ##*ACTION: Anne to ask if an agreement/SOU has to be in place for a WG to hold an official OOC or joint meeting with another organization | ||
+ | ##**Anne checked with Karen, who responded that an SOU does not have to be in place. | ||
<!-- #WGM Planning - --> | <!-- #WGM Planning - --> | ||
#[http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=313 Open Issues List]/Parking Lot | #[http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=313 Open Issues List]/Parking Lot | ||
+ | ##Revised ballot process PSS - still need T3SD approval, requirements | ||
+ | ##Wayne and Freida working on co-chair handbook update process | ||
+ | ##FHIR Ballot level issues - waiting for written explanation from Grahame | ||
+ | ##Calvin/Austin will work on pulling out WG relationships and making a mapping for September meeting | ||
+ | ##September agenda | ||
+ | ##*EST/Tooling Update | ||
+ | ##*FHIR Normative ballot issues | ||
− | ===Minutes=== | + | ===Minutes=== |
#Housekeeping | #Housekeeping | ||
#*Introduction of visitors (including declaration of interests) | #*Introduction of visitors (including declaration of interests) | ||
− | + | #*Agenda review and approval - Paul has some update on the order of PSS review - accepted by general consent | |
− | #*Agenda review and approval - | + | #*Approve Minutes of [[2017-08-07 TSC Call Agenda]] |
− | #*Approve Minutes of [[2017-08-07 TSC Call Agenda]] | ||
#**Minutes accepted via general consent. | #**Minutes accepted via general consent. | ||
+ | #*Review gforge tracker https://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=1065 - everyone can access | ||
+ | #*Review WGM Agenda [[2017-09-09_TSC_WGM_Agenda]] | ||
+ | #**TSC Chair candidates reviewed | ||
+ | #** updates made | ||
#Review [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=494 action items] – | #Review [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=494 action items] – | ||
+ | ##Ken to send final Mission and Charter Review Checklist to steering divisions for use in review process [https://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=1065 here]. SD cochairs can make a tracker item and upload checklists into the tracker. | ||
##Paul to update process for order of PSS review with suggestions from 2017-08-07 call | ##Paul to update process for order of PSS review with suggestions from 2017-08-07 call | ||
− | ##* | + | ##*WEDI project example discussed; Paul and Lorraine will do some investigation and come back |
− | ## | + | ##*US Realm placement in order discussed. Melva states Changes made to scope statement due to parallel nature sometimes requires herto re-send to steering division. |
− | ##*Ken | + | ##*Re-Sequence depends on the type of change |
− | ##** | + | ##*Wayne notes that on-line review would help that - most recent version always online and changes notified to review groups. |
− | ##Melva to put together notes on existing WG review meeting with Jean, John, and Calvin | + | ##*Ken summarizes this would make TSC Review #4 and SD Review #3 out of the parallel stream; Paul moves and Melva seconds approval. Approved sequence is: |
− | ##Calvin to put together recommendations on FHIR naming issue | + | ##*Proposed Approval Order for PSSs |
− | ##Austin to report back on ballot reconciliation sync project by September WGM | + | ##*#Work Group review – ensures it meets project, WG and organizational needs. |
+ | ##*#Administrative review – in parallel | ||
+ | ##*#*Family Management Group – ensure it meets Family requirements | ||
+ | ##*#*(If US Realm) USRSC – ensure it meets US Realm needs | ||
+ | ##*#Steering Division – ensure it meets: content completeness; work group scope; other work group co-sponsors and interest groups; and, organizational needs | ||
+ | ##*#TSC review | ||
+ | ##*#*Optionally ARB and/or SGB review recommendations to TSC | ||
+ | ##*#*TSC decision | ||
+ | ##*Wayne would like to set expectations on what these cycles should take in time | ||
+ | ##*Paul will send to PSC who owns the PSS. | ||
+ | ##Melva to put together notes on existing WG review meeting with Jean, John, and Calvin - Melva will post notes from their review of low hanging fruit | ||
+ | ##Calvin to put together recommendations on FHIR naming issue - no report, regrets today | ||
+ | ##Austin to report back on ballot reconciliation sync project by September WGM - no report, regrets today | ||
##Calvin to resubmit powerpoint on ballot level change request for Anne to send out | ##Calvin to resubmit powerpoint on ballot level change request for Anne to send out | ||
− | ##Wayne to forward STU Extension request by the PHER WG for HL7 Version 2.6 Implementation Guide: Critical Congenital Heart Defects (CCHD) pulse oximetry screening results, Release 1 to EC for consideration | + | ##*View Calvin's document [https://gforge.hl7.org/gf/project/tsc/docman/Draft%20Documents/Ballot%20Level%20Change-R3.pptx here] |
− | #Discussion topics: | + | ##Wayne to forward STU Extension request by the PHER WG for HL7 Version 2.6 Implementation Guide: Critical Congenital Heart Defects (CCHD) pulse oximetry screening results, Release 1 to EC for consideration - complete |
+ | #Discussion topics: | ||
##Review [http://www.hl7.org/documentcenter/public/wg/tsc/Template%20-%20out%20of%20cycle%20mtg.doc Out of Cycle Meeting Request form] | ##Review [http://www.hl7.org/documentcenter/public/wg/tsc/Template%20-%20out%20of%20cycle%20mtg.doc Out of Cycle Meeting Request form] | ||
− | ##*Needed to review in terms of co-branded events. | + | ##*ACTION: Anne to ask if an agreement/SOU has to be in place for a WG to hold an official OOC or joint meeting with another organization |
− | ##* | + | ##**Anne checked with Karen, who responded that an SOU does not have to be in place. |
− | ## | + | ##*Needed to review in terms of co-branded events. Need to include request |
− | #Adjourned at | + | ##*'''Motion:'''Paul moves, Melva seconded approval of document and send to EC for final approval. |
+ | ##**VOTE: unanimously approved | ||
+ | #Approval items for this week: | ||
+ | ##from Tony: a substantive change approved during ballot reconciliation was not applied to V2.9 Chapter 2.A section 2.a.75. We could apply to V2.9 after ballot closing, but this would force a new ballot in January 2017. InM is therefore requesting an extension of the ballot period for 30 days from the posting of the updated material. | ||
+ | ##*'''Motion''' by Tony (on behalf of V2 Publishing and InM): extend ballot closing date on Version 2.9 ballot to September 20 (from September 5) to allow for patching the content on the ballot. | ||
+ | ##**Paul seconds the motion, unanimously approved. | ||
+ | ##*Lynn will make the changes to the ballot package and announcements and Tony will send notice on ballot desktop. | ||
+ | #[http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=313 Open Issues List]/Parking Lot | ||
+ | ##Revised ballot process PSS - still need T3SD approval, requirements - forwarded to Lloyd with requested changes by Andy | ||
+ | ##Wayne and Freida working on co-chair handbook update process - in process | ||
+ | ##FHIR Ballot level issues - waiting for written explanation from Grahame - Grahame still has some requirements work to do | ||
+ | ##Calvin/Austin will work on pulling out WG relationships and making a mapping for September meeting- no report, regrets today | ||
+ | ##September agenda | ||
+ | ##*EST/Tooling Update | ||
+ | ##*FHIR Normative ballot issues | ||
+ | #Adjourned at 11:49 PM Eastern | ||
===Next Steps=== | ===Next Steps=== |
Latest revision as of 14:37, 25 August 2017
TSC Agenda/Minutes
HL7 TSC Meeting Minutes Location: GoToMeeting ID: 426-505-829 |
Date: 2017-08-21 Time: 11:00 AM U.S. Eastern | |
Facilitator: Ken McCaslin | Note taker(s): Lynn Laakso |
Quorum = chair + 5 including 2 SD represented | yes/no | ||||||
Chair/CTO | ArB | International Affiliate Rep | Ad-Hoc | ||||
x | Ken McCaslin | x | Tony Julian | Regrets | Jean Duteau | regrets | Freida Hall, GOM Expert |
x | Wayne Kubick | x | Lorraine Constable | x | Giorgio Cangioli | . | |
Domain Experts | Foundation and Technology | Structure and Semantic Design | Technical and Support Services | ||||
x | Melva Peters | . | Russ Hamm | Calvin Beebe | x | Andy Stechishin | |
x | John Roberts | x | Paul Knapp | Austin Kreisler | Sandra Stuart | ||
. | . | . | . | ||||
ex officio | Invited Guests | Observers | HL7 Staff | ||||
. | Pat Van Dyke (HL7 Chair) w/vote | . | . | obs1 | regrets | Anne Wizauer | |
. | Chuck Jaffe (CEO) |
. | . | . | obs2 | x | Lynn Laakso
|
. | . | . | . | . | |||
Agenda
- Housekeeping
- Introduction of visitors (including declaration of interests)
- Agenda review and approval -
- Approve Minutes of 2017-08-14 TSC Call Agenda
- Review gforge tracker https://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=1065
- Review WGM Agenda 2017-09-09_TSC_WGM_Agenda
- Review action items –
- Paul to update process for order of PSS review with suggestions from 2017-08-07 call
- Ken to send final Mission and Charter Review Checklist to steering divisions for use in review process
- Anne to set up a private place on Gforge where people can post.
- Private area to upload M&Cs is located here. SD cochairs can make a tracker item and upload checklists into the tracker.
- Anne to set up a private place on Gforge where people can post.
- Melva to put together notes on existing WG review meeting with Jean, John, and Calvin
- Calvin to put together recommendations on FHIR naming issue
- Austin to report back on ballot reconciliation sync project by September WGM
- Calvin to resubmit powerpoint on ballot level change request for Anne to send out
- View Calvin's document here
- Wayne to forward STU Extension request by the PHER WG for HL7 Version 2.6 Implementation Guide: Critical Congenital Heart Defects (CCHD) pulse oximetry screening results, Release 1 to EC for consideration
- Approval items from last week's e-vote:
- STU Publication Request by the PHER WG of the DESD for HL7 CDA® Release 2 Implementation Guide: Vital Records Death Reporting, Release 1 STU 2 - US Realm at Project Insight 859 and TSC Tracker 13748
- Approval items for this week:
- from Tony: a substantive change approved during ballot reconciliation was not applied to V2.9 Chapter 2.A section 2.a.75. We could apply to V2.9 after ballot closing, but this would force a new ballot in January 2017. InM is therefore requesting an extension of the ballot period for 30 days from the posting of the updated material.
- Motion by Tony (on behalf of V2 Publishing and InM): extend ballot closing date on Version 2.9 ballot to September 20 (from September 5) to allow for patching the content on the ballot.
- from Tony: a substantive change approved during ballot reconciliation was not applied to V2.9 Chapter 2.A section 2.a.75. We could apply to V2.9 after ballot closing, but this would force a new ballot in January 2017. InM is therefore requesting an extension of the ballot period for 30 days from the posting of the updated material.
- Discussion topics:
- Review Out of Cycle Meeting Request form
- ACTION: Anne to ask if an agreement/SOU has to be in place for a WG to hold an official OOC or joint meeting with another organization
- Anne checked with Karen, who responded that an SOU does not have to be in place.
- ACTION: Anne to ask if an agreement/SOU has to be in place for a WG to hold an official OOC or joint meeting with another organization
- Review Out of Cycle Meeting Request form
- Open Issues List/Parking Lot
- Revised ballot process PSS - still need T3SD approval, requirements
- Wayne and Freida working on co-chair handbook update process
- FHIR Ballot level issues - waiting for written explanation from Grahame
- Calvin/Austin will work on pulling out WG relationships and making a mapping for September meeting
- September agenda
- EST/Tooling Update
- FHIR Normative ballot issues
Minutes
- Housekeeping
- Introduction of visitors (including declaration of interests)
- Agenda review and approval - Paul has some update on the order of PSS review - accepted by general consent
- Approve Minutes of 2017-08-07 TSC Call Agenda
- Minutes accepted via general consent.
- Review gforge tracker https://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=1065 - everyone can access
- Review WGM Agenda 2017-09-09_TSC_WGM_Agenda
- TSC Chair candidates reviewed
- updates made
- Review action items –
- Ken to send final Mission and Charter Review Checklist to steering divisions for use in review process here. SD cochairs can make a tracker item and upload checklists into the tracker.
- Paul to update process for order of PSS review with suggestions from 2017-08-07 call
- WEDI project example discussed; Paul and Lorraine will do some investigation and come back
- US Realm placement in order discussed. Melva states Changes made to scope statement due to parallel nature sometimes requires herto re-send to steering division.
- Re-Sequence depends on the type of change
- Wayne notes that on-line review would help that - most recent version always online and changes notified to review groups.
- Ken summarizes this would make TSC Review #4 and SD Review #3 out of the parallel stream; Paul moves and Melva seconds approval. Approved sequence is:
- Proposed Approval Order for PSSs
- Work Group review – ensures it meets project, WG and organizational needs.
- Administrative review – in parallel
- Family Management Group – ensure it meets Family requirements
- (If US Realm) USRSC – ensure it meets US Realm needs
- Steering Division – ensure it meets: content completeness; work group scope; other work group co-sponsors and interest groups; and, organizational needs
- TSC review
- Optionally ARB and/or SGB review recommendations to TSC
- TSC decision
- Wayne would like to set expectations on what these cycles should take in time
- Paul will send to PSC who owns the PSS.
- Melva to put together notes on existing WG review meeting with Jean, John, and Calvin - Melva will post notes from their review of low hanging fruit
- Calvin to put together recommendations on FHIR naming issue - no report, regrets today
- Austin to report back on ballot reconciliation sync project by September WGM - no report, regrets today
- Calvin to resubmit powerpoint on ballot level change request for Anne to send out
- View Calvin's document here
- Wayne to forward STU Extension request by the PHER WG for HL7 Version 2.6 Implementation Guide: Critical Congenital Heart Defects (CCHD) pulse oximetry screening results, Release 1 to EC for consideration - complete
- Discussion topics:
- Review Out of Cycle Meeting Request form
- ACTION: Anne to ask if an agreement/SOU has to be in place for a WG to hold an official OOC or joint meeting with another organization
- Anne checked with Karen, who responded that an SOU does not have to be in place.
- Needed to review in terms of co-branded events. Need to include request
- Motion:Paul moves, Melva seconded approval of document and send to EC for final approval.
- VOTE: unanimously approved
- ACTION: Anne to ask if an agreement/SOU has to be in place for a WG to hold an official OOC or joint meeting with another organization
- Review Out of Cycle Meeting Request form
- Approval items for this week:
- from Tony: a substantive change approved during ballot reconciliation was not applied to V2.9 Chapter 2.A section 2.a.75. We could apply to V2.9 after ballot closing, but this would force a new ballot in January 2017. InM is therefore requesting an extension of the ballot period for 30 days from the posting of the updated material.
- Motion by Tony (on behalf of V2 Publishing and InM): extend ballot closing date on Version 2.9 ballot to September 20 (from September 5) to allow for patching the content on the ballot.
- Paul seconds the motion, unanimously approved.
- Lynn will make the changes to the ballot package and announcements and Tony will send notice on ballot desktop.
- Motion by Tony (on behalf of V2 Publishing and InM): extend ballot closing date on Version 2.9 ballot to September 20 (from September 5) to allow for patching the content on the ballot.
- from Tony: a substantive change approved during ballot reconciliation was not applied to V2.9 Chapter 2.A section 2.a.75. We could apply to V2.9 after ballot closing, but this would force a new ballot in January 2017. InM is therefore requesting an extension of the ballot period for 30 days from the posting of the updated material.
- Open Issues List/Parking Lot
- Revised ballot process PSS - still need T3SD approval, requirements - forwarded to Lloyd with requested changes by Andy
- Wayne and Freida working on co-chair handbook update process - in process
- FHIR Ballot level issues - waiting for written explanation from Grahame - Grahame still has some requirements work to do
- Calvin/Austin will work on pulling out WG relationships and making a mapping for September meeting- no report, regrets today
- September agenda
- EST/Tooling Update
- FHIR Normative ballot issues
- Adjourned at 11:49 PM Eastern
Next Steps
Actions (Include Owner, Action Item, and due date)
| |||
Next Meeting/Preliminary Agenda Items |
© 2017 Health Level Seven® International. All rights reserved.