Difference between revisions of "2016-08-01 TSC Call Agenda"

From HL7 TSC
Jump to navigation Jump to search
 
(29 intermediate revisions by 3 users not shown)
Line 3: Line 3:
  
  
<!--
+
 
  EDITORS - When converting the content from Agenda to minuets:
 
  1) Delete the string "|Agenda Template" from   
 
        [[Category:2014 TSC Minutes|Agenda Template]] below
 
  2) Delete the Logistics template reference
 
        {{:TSC Meetings}}  below
 
-->
 
 
===Meeting Info/Attendees===
 
===Meeting Info/Attendees===
{{:TSC Meetings}}
+
 
   [[Category:2016 TSC Minutes|Agenda Template]]
+
   [[Category:2016 TSC Minutes]]
  
 
{|border="1" cellpadding="2" cellspacing="0"  
 
{|border="1" cellpadding="2" cellspacing="0"  
 
| width="0%" colspan="2" align="left" style="background:#f0f0f0;"|'''HL7 TSC Meeting Minutes''' <br/>
 
| width="0%" colspan="2" align="left" style="background:#f0f0f0;"|'''HL7 TSC Meeting Minutes''' <br/>
'''Location: call 770-657-9270 using code 985371#'''<br/> '''''NEW'''''  GoToMeeting ID: [https://global.gotomeeting.com/join/426505829  426-505-829]
+
'''Location: GoToMeeting ID: [https://global.gotomeeting.com/join/426505829  426-505-829]
 
| width="0%" colspan="1" align="left" style="background:#f0f0f0;"|'''Date: 2016-08-01'''<br/> '''Time: 11:00 AM U.S. Eastern'''
 
| width="0%" colspan="1" align="left" style="background:#f0f0f0;"|'''Date: 2016-08-01'''<br/> '''Time: 11:00 AM U.S. Eastern'''
 
|-
 
|-
Line 30: Line 24:
 
|colspan="2"|Chair/CTO ||colspan="2"|ArB ||colspan="2"|International Affiliate Rep ||colspan="2"|Ad-Hoc
 
|colspan="2"|Chair/CTO ||colspan="2"|ArB ||colspan="2"|International Affiliate Rep ||colspan="2"|Ad-Hoc
 
|-
 
|-
|.||Ken McCaslin||.||Tony Julian||.|| Jean Duteau||.||Austin Kreisler
+
|x||Ken McCaslin||x||Tony Julian||.|| Jean Duteau||x||Austin Kreisler
 
|-
 
|-
|.||Wayne Kubick ||.||Lorraine Constable||.|| Giorgio Cangioli||.||Freida Hall, GOM Expert
+
|x||Wayne Kubick ||.||Lorraine Constable||.|| Giorgio Cangioli||x||Freida Hall, GOM Expert
 
|-
 
|-
 
|.||  ||.|| ||.||  ||.||Woody Beeler, TSC Member Emeritus
 
|.||  ||.|| ||.||  ||.||Woody Beeler, TSC Member Emeritus
Line 42: Line 36:
  
 
|-
 
|-
|.||Melva Peters||.||Russ Hamm||.||Calvin Beebe||.||Andy Stechishin
+
|x||Melva Peters||x||Russ Hamm||.||Calvin Beebe||.||Andy Stechishin
 
|-
 
|-
|.||John Roberts||.||Paul Knapp||.||Gora Datta||.||Sandra Stuart
+
|x||John Roberts||.||Paul Knapp||x||Gora Datta||.||Sandra Stuart
 
|-
 
|-
 
|.||  ||. ||  ||.||  ||.||
 
|.||  ||. ||  ||.||  ||.||
Line 53: Line 47:
 
|colspan="2" align="center" style="background:#f0f0f0;"|HL7 Staff
 
|colspan="2" align="center" style="background:#f0f0f0;"|HL7 Staff
 
|-
 
|-
|.||Pat Van Dyke (HL7 Chair) w/vote||.|| ||.||''obs1''||.||Anne Wizauer
+
|.||Pat Van Dyke (HL7 Chair) w/vote||.|| ||.||''obs1''||x||Dave Hamill
 
|-
 
|-
 
|.||Chuck Jaffe (CEO) <s> vote</s>||.||.||.||''obs2''||.||
 
|.||Chuck Jaffe (CEO) <s> vote</s>||.||.||.||''obs2''||.||
Line 73: Line 67:
 
#Approve Minutes of [[2016-07-25 TSC Call Agenda]]
 
#Approve Minutes of [[2016-07-25 TSC Call Agenda]]
 
#Review [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=494 action items] –
 
#Review [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=494 action items] –
 +
#*Continue to review [http://gforge.hl7.org/gf/download/trackeritem/10313/14560/2016SepBallotReferrals.xlsx 2016Sep Ballot items] that are unapproved/required followup
 
#Approval Items from previous weeks with followup:
 
#Approval Items from previous weeks with followup:
 
#*[http://gforge.hl7.org/gf/download/trackeritem/10051/14468/HL7%20Project%20Scope%20Statement%20Common%20Registry%20DAM%202016_05_07_Revised%20ACW%202016_06_16%202.docx Revised Project Approval Request] by the CQI WG of the DESD of ''Common Clinical Registry Framework Domain Analysis Model'' at Project Insight TBD and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=10051&start=0 TSC Tracker 10051]
 
#*[http://gforge.hl7.org/gf/download/trackeritem/10051/14468/HL7%20Project%20Scope%20Statement%20Common%20Registry%20DAM%202016_05_07_Revised%20ACW%202016_06_16%202.docx Revised Project Approval Request] by the CQI WG of the DESD of ''Common Clinical Registry Framework Domain Analysis Model'' at Project Insight TBD and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=10051&start=0 TSC Tracker 10051]
 
#**DESD: Item 2, WG level of involvement is not completed. Items 6c and PBS metrics review not completed. Item 6D, local and state departments of health should be checked.
 
#**DESD: Item 2, WG level of involvement is not completed. Items 6c and PBS metrics review not completed. Item 6D, local and state departments of health should be checked.
 
#**ARB: Is this investigative? Otherwise why not balloting?
 
#**ARB: Is this investigative? Otherwise why not balloting?
#***'''Melva to follow up on items 2, 6c and 6d'''
+
#***Melva to follow up on items 2, 6c and 6d
#***'''Followup on balloting: WG states it will indeed ballot Informative'''
+
#***'''UPDATE: Revised PSS submitted; will be in this week's e-vote'''
 
#*[http://gforge.hl7.org/gf/download/trackeritem/10253/14471/HL7%20PSS%20-%20PHR-S%20FM%20to%20Release%202%20format%20-%2020160610%202.docx Project Approval Request] by the EHR WG of the SSD-SD of ''HL7 Personal Health Record System Functional Model – Update from Release 1 to Release 2 format'' at Project Insight TBD and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=10253&start=0 TSC Tracker 10253]
 
#*[http://gforge.hl7.org/gf/download/trackeritem/10253/14471/HL7%20PSS%20-%20PHR-S%20FM%20to%20Release%202%20format%20-%2020160610%202.docx Project Approval Request] by the EHR WG of the SSD-SD of ''HL7 Personal Health Record System Functional Model – Update from Release 1 to Release 2 format'' at Project Insight TBD and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=10253&start=0 TSC Tracker 10253]
 
#**Freida: Does this need to be a Joint Initiative Council (JIC) ballot if it is going to ISO? [http://www.jointinitiativecouncil.org/ JointInitiativeCouncil.org] mentions HL7-ISO Pilot Agreement and joint copyright in §5.b
 
#**Freida: Does this need to be a Joint Initiative Council (JIC) ballot if it is going to ISO? [http://www.jointinitiativecouncil.org/ JointInitiativeCouncil.org] mentions HL7-ISO Pilot Agreement and joint copyright in §5.b
#***ACTION: Wayne to contact Ed as he is the formal HL7 rep to ISO
+
#***'''ACTION: Wayne to contact Ed as he is the formal HL7 rep to ISO'''
 
#*[http://gforge.hl7.org/gf/download/trackeritem/10372/14508/HL7%20V2%206%20Vital%20Records%20Death%20Reporting%20IG%20Publication_Request_20160630.docx STU Publication Request] by the PHER WG of the DESD for ''HL7 Version 2.6 Implementation Guide: Vital Records Death Reporting (US Realm), Release 1'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=1208 Project Insight 1208] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=10372&start=0 TSC Tracker 10372]
 
#*[http://gforge.hl7.org/gf/download/trackeritem/10372/14508/HL7%20V2%206%20Vital%20Records%20Death%20Reporting%20IG%20Publication_Request_20160630.docx STU Publication Request] by the PHER WG of the DESD for ''HL7 Version 2.6 Implementation Guide: Vital Records Death Reporting (US Realm), Release 1'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=1208 Project Insight 1208] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=10372&start=0 TSC Tracker 10372]
 
#**'''Referred by Freida''': It seems the Project Insight # may be incorrect reference?  Per the ballot desktop, the January 2016 ballot was:  HL7 Version 2.6 Implementation Guide: Vital Records Death Reporting (US Realm), Release 1 (PI ID: 735) The Publication Request indicates both project ids, don’t know why 735 says “delete?”  
 
#**'''Referred by Freida''': It seems the Project Insight # may be incorrect reference?  Per the ballot desktop, the January 2016 ballot was:  HL7 Version 2.6 Implementation Guide: Vital Records Death Reporting (US Realm), Release 1 (PI ID: 735) The Publication Request indicates both project ids, don’t know why 735 says “delete?”  
Line 89: Line 84:
 
#Approval items from last week's e-vote '''referred for discussion''':
 
#Approval items from last week's e-vote '''referred for discussion''':
 
#*[http://gforge.hl7.org/gf/download/trackeritem/10402/14554/HL7%20Project%20Scope%20Statement_DAF_2016_PSS_v4%207.docx Project Approval Request] by the FHIR-I WG of the FTSD of ''Data Access Framework (DAF) FHIR Implementation Guide(s)'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=1265 Project Insight 1265] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=10402&start=0 TSC Tracker 10402]
 
#*[http://gforge.hl7.org/gf/download/trackeritem/10402/14554/HL7%20Project%20Scope%20Statement_DAF_2016_PSS_v4%207.docx Project Approval Request] by the FHIR-I WG of the FTSD of ''Data Access Framework (DAF) FHIR Implementation Guide(s)'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=1265 Project Insight 1265] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=10402&start=0 TSC Tracker 10402]
#**'''Referred by T3SD, Giorgio, and DESD:''' Both comments are regarding deferral of vote until cosponsors have approved
+
#**'''Referred by T3SD, Giorgio, and DESD:''' All comments are regarding deferral of vote until cosponsors have approved
#**'''Referred by Freida:'''Does this need ARB review of externally developed content? PSS needs to better explain when/what ARB needs to review; change request entered for next PSS update.
+
#**'''Referred by Freida:''' Does this need ARB review of externally developed content? PSS needs to better explain when/what ARB needs to review; change request entered for next PSS update.
#Approval items from last week's e-vote approved 4/0/0 (one more needed for quorum):
+
#Approval items from last week's e-vote approved 8/0/0 with DESD, FTSD, SSD-SD, T3SD, Giorgio, Melva, Wayne, and Austin voting:
 
#*[http://gforge.hl7.org/gf/download/trackeritem/10401/14553/HL7_Publication_Request_Template_2016May_Health%20Concerns.docx Informative Publication Request] by the Patient Care WG of the DESD for ''Health Concerns DAM'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=929 Project Insight 929] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=10401&start=0 TSC Tracker 10401]
 
#*[http://gforge.hl7.org/gf/download/trackeritem/10401/14553/HL7_Publication_Request_Template_2016May_Health%20Concerns.docx Informative Publication Request] by the Patient Care WG of the DESD for ''Health Concerns DAM'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=929 Project Insight 929] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=10401&start=0 TSC Tracker 10401]
 
#Approval items for this week:
 
#Approval items for this week:
 +
#*[http://gforge.hl7.org/gf/download/trackeritem/10051/14569/HL7%20Project%20Scope%20Statement%20Common%20Registry%20DRAFT%20DAM%202016_05_09%20Revision%2029Jul16.docx Revised Project Approval Request] by the CQI WG of the DESD of ''Common Clinical Registry Framework Domain Analysis Model'' at Project Insight TBD and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=10051&start=0 TSC Tracker 10051]
 +
#*[http://gforge.hl7.org/gf/download/trackeritem/10412/14570/HL7_Publication_Request_Template%20CCHD%20Request%20for%20DSTU%20Extension%2028_07_2%20%20%20.docx DSTU Extension Request] by the PHER WG of the DESD for ''HL7 Version 2.6 Implementation Guide: Critical Congenital Heart Defects (CCHD) pulse oximetry screening results, Release 1'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=897 Project Insight 897] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=10412&start=0 TSC Tracker 10412]
 +
#*[http://gforge.hl7.org/gf/download/trackeritem/10413/14571/HL7_Publication_Request_Template_2016May_ProjSvcs.docx Informative Publication Request] by the Project Services WG of the T3SD of ''HL7 Policy for Introducint New Processes, Release 1'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=1224 Project Insight 1224] and http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=10413&start=0 TSC Tracker 10413]
 +
#*[http://gforge.hl7.org/gf/download/trackeritem/10414/14572/HL7%20PSS-Immunization%20Functional%20Profile-20160628.docx Project Approval Request] by the EHR WG of the SSD-SD for ''EHR System Immunization Functional Profile Release 2'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=1276 Project Insight 1276] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=10414&start=0 TSC Tracker 10414]
 
#Discussion topics:  
 
#Discussion topics:  
 
#*[http://gforge.hl7.org/gf/download/trackeritem/10313/14560/2016SepBallotReferrals.xlsx 2016Sep Ballot items] that are unapproved/required followup
 
#*[http://gforge.hl7.org/gf/download/trackeritem/10313/14560/2016SepBallotReferrals.xlsx 2016Sep Ballot items] that are unapproved/required followup
 
#Reports: (attach written reports below from Steering Divisions et al.)
 
#Reports: (attach written reports below from Steering Divisions et al.)
 
<!-- #WGM Planning - -->
 
<!-- #WGM Planning - -->
#[http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=313 Open Issues List]/Parking Lot
+
#Parking Lot/[http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=313 Open Issues List]
 +
#*SeptemberWGM prep
 
#*HL7 documentation formats across standards families - followup from 6-27 call with [http://gforge.hl7.org/gf/download/docmanfileversion/9305/14493/MFHAST_HL7_Standards_Formats.docx associated document]
 
#*HL7 documentation formats across standards families - followup from 6-27 call with [http://gforge.hl7.org/gf/download/docmanfileversion/9305/14493/MFHAST_HL7_Standards_Formats.docx associated document]
 
#*Assignment of outside projects to WGs:  
 
#*Assignment of outside projects to WGs:  
Line 114: Line 114:
 
===Minutes===
 
===Minutes===
 
'''Minutes/Conclusions Reached:'''<br/>
 
'''Minutes/Conclusions Reached:'''<br/>
 
+
#Introduction of visitors (including declaration of interests)
 +
#Agenda review and approval -
 +
#Approve Minutes of [[2016-07-25 TSC Call Agenda]]
 +
#*Accepted by general consent
 +
#Review [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=494 action items] –
 +
#*Reviewed [http://gforge.hl7.org/gf/download/trackeritem/10313/14577/%32%30%31%36%53%65%70%42%61%6c%6c%6f%74%52%65%66%65%72%72%61%6c%73%5f%32%30%31%36%30%38%30%34%55%70%64%61%74%65%73.%78%6c%73%78 2016Sep Ballot items Updated].  Motions/Notes captured in the XLS file as well as detailed below.  Also, Dave walked through the spreadsheet with Lynn Laakso on 8/4/2016.
 +
#**HL7 EHR System Usability Conformance Criteria, Release 1 (2nd Comment-Only Ballot) (PI ID: 995)
 +
#***Motion by Gora; seconded by Hal; Approve the document based on the condition that the Work Group will determine whether the dash should be included in the title as in ‘EHR System.  Unanimously approved.
 +
#***Once the EHR WG has decided, they should contact Frieda Hall to let her know the decision so that she can update the GOM.
 +
#***8/4/2016 Update Per Lynn Laakso, she has updated the ballot desktop and will include the following in her in her ballot update document:  The title of the item initially announced as HL7 EHR System Usability Conformance Criteria, Release 1 (2nd Comment-Only Ballot) (PI ID: 995) has been modified to HL7 EHRS-FM Release 2: Usability Conformance Criteria, Release 1 (PI ID: 995) to better reflect the updated naming conventions approved by the TSC. This did result in a change to the Unique Ballot ID: EHRS_USEGUIDE_R1_O2_2016SEP to: EHRSFM_R2_USEGUIDE_R1_O2_2016SEP.
 +
#**HL7 FHIR® IG: Data Access Framework (DAF) Research, Release 1 (1st Comment-Only Ballot) (PI ID: 1265)
 +
#***Dave to reach out to Jonathon Coleman to attend the ArB meeting on Tuesday to explain the externally developed content and cc Tony and Wayne.
 +
#***Motion to approve subject to ArB approval by Hall; Beebe seconds; Unanimously approved.
 +
#***8/4/2016 Update: ArB approved.
 +
#**HL7 Specification: Standards Privacy Impact Assessment (SPIA) Implementation Guide, Release 1 (PI ID: 1263)  Requesting alternate ballot title "Standards Privacy Impact Assessment (SPIA) Cookbook" (1st Informative Ballot)
 +
#***Datta motions; Stuart seconds motions to approve title subjected to the Work Group agreeing.Unanimously approved.
 +
#***ACTION ITEM: Dave/Anne to have the Work Group inform the TSC upon their decision.
 +
#***Dave completed on 8/4/2016
 +
#Approval Items from previous weeks with followup:
 +
#*[http://gforge.hl7.org/gf/download/trackeritem/10051/14468/HL7%20Project%20Scope%20Statement%20Common%20Registry%20DAM%202016_05_07_Revised%20ACW%202016_06_16%202.docx Revised Project Approval Request] by the CQI WG of the DESD of ''Common Clinical Registry Framework Domain Analysis Model'' at Project Insight TBD and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=10051&start=0 TSC Tracker 10051]
 +
#**DESD: Item 2, WG level of involvement is not completed. Items 6c and PBS metrics review not completed. Item 6D, local and state departments of health should be checked.
 +
#**ARB: Is this investigative? Otherwise why not balloting?
 +
#***Melva to follow up on items 2, 6c and 6d
 +
#***'''UPDATE: Dave to put in this week's e-vote'''
 +
#*[http://gforge.hl7.org/gf/download/trackeritem/10253/14471/HL7%20PSS%20-%20PHR-S%20FM%20to%20Release%202%20format%20-%2020160610%202.docx Project Approval Request] by the EHR WG of the SSD-SD of ''HL7 Personal Health Record System Functional Model – Update from Release 1 to Release 2 format'' at Project Insight TBD and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=10253&start=0 TSC Tracker 10253]
 +
#**Freida: Does this need to be a Joint Initiative Council (JIC) ballot if it is going to ISO? [http://www.jointinitiativecouncil.org/ JointInitiativeCouncil.org] mentions HL7-ISO Pilot Agreement and joint copyright in §5.b
 +
#***'''ACTION: Wayne to contact Ed as he is the formal HL7 rep to ISO'''
 +
#*[http://gforge.hl7.org/gf/download/trackeritem/10372/14508/HL7%20V2%206%20Vital%20Records%20Death%20Reporting%20IG%20Publication_Request_20160630.docx STU Publication Request] by the PHER WG of the DESD for ''HL7 Version 2.6 Implementation Guide: Vital Records Death Reporting (US Realm), Release 1'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=1208 Project Insight 1208] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=10372&start=0 TSC Tracker 10372]
 +
#**Referred by Freida: It seems the Project Insight # may be incorrect reference?  Per the ballot desktop, the January 2016 ballot was:  HL7 Version 2.6 Implementation Guide: Vital Records Death Reporting (US Realm), Release 1 (PI ID: 735) The Publication Request indicates both project ids, don’t know why 735 says “delete?”
 +
#**Anne checked with Lynn; she states "Vital Records' project ID was changed with the new PSS. It used to be 735 but is now balloting under 1208."
 +
#***ACTION: Anne to talk with Dave to make sure old project (735) is closed.
 +
#***'''UPDATE:  Dave conveyed Michelle Williamson's explanation regarding project 735 vs 1208:  "Our first IG (DSTU 1) was a V2.5.1 Vital Records Death Reporting IG. 735; The current IG is DSTU 2 – V2.6 Vital Records Death Reporting IG. 1208"
 +
#***'''TSC was fine with archiving 735.  Dave to put in this week's e-vote'''
 +
#Approval items from last week's e-vote '''referred for discussion''':
 +
#*[http://gforge.hl7.org/gf/download/trackeritem/10402/14554/HL7%20Project%20Scope%20Statement_DAF_2016_PSS_v4%207.docx Project Approval Request] by the FHIR-I WG of the FTSD of ''Data Access Framework (DAF) FHIR Implementation Guide(s)'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=1265 Project Insight 1265] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=10402&start=0 TSC Tracker 10402]
 +
#**Referred by T3SD, Giorgio, and DESD: All comments are regarding deferral of vote until cosponsors have approved
 +
#**Referred by Freida: Does this need ARB review of externally developed content? PSS needs to better explain when/what ARB needs to review; change request entered for next PSS update.
 +
#**'''UPDATE: Discussion and Motion documented in the Ballot Review XLS file (agenda item #2 above)'''
 +
#Approval items from last week's e-vote approved 8/0/0 with DESD, FTSD, SSD-SD, T3SD, Giorgio, Melva, Wayne, and Austin voting:
 +
#*[http://gforge.hl7.org/gf/download/trackeritem/10401/14553/HL7_Publication_Request_Template_2016May_Health%20Concerns.docx Informative Publication Request] by the Patient Care WG of the DESD for ''Health Concerns DAM'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=929 Project Insight 929] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=10401&start=0 TSC Tracker 10401]
 +
#Approval items for this week (Dave to send out in an e-vote):
 +
#*[http://gforge.hl7.org/gf/download/trackeritem/10051/14569/HL7%20Project%20Scope%20Statement%20Common%20Registry%20DRAFT%20DAM%202016_05_09%20Revision%2029Jul16.docx Revised Project Approval Request] by the CQI WG of the DESD of ''Common Clinical Registry Framework Domain Analysis Model'' at Project Insight TBD and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=10051&start=0 TSC Tracker 10051]
 +
#*[http://gforge.hl7.org/gf/download/trackeritem/10412/14570/HL7_Publication_Request_Template%20CCHD%20Request%20for%20DSTU%20Extension%2028_07_2%20%20%20.docx DSTU Extension Request] by the PHER WG of the DESD for ''HL7 Version 2.6 Implementation Guide: Critical Congenital Heart Defects (CCHD) pulse oximetry screening results, Release 1'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=897 Project Insight 897] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=10412&start=0 TSC Tracker 10412]
 +
#*[http://gforge.hl7.org/gf/download/trackeritem/10413/14571/HL7_Publication_Request_Template_2016May_ProjSvcs.docx Informative Publication Request] by the Project Services WG of the T3SD of ''HL7 Policy for Introducint New Processes, Release 1'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=1224 Project Insight 1224] and http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=10413&start=0 TSC Tracker 10413]
 +
#*[http://gforge.hl7.org/gf/download/trackeritem/10414/14572/HL7%20PSS-Immunization%20Functional%20Profile-20160628.docx Project Approval Request] by the EHR WG of the SSD-SD for ''EHR System Immunization Functional Profile Release 2'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=1276 Project Insight 1276] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=10414&start=0 TSC Tracker 10414]
 +
#Discussion topics:
 +
#*[http://gforge.hl7.org/gf/download/trackeritem/10313/14577/%32%30%31%36%53%65%70%42%61%6c%6c%6f%74%52%65%66%65%72%72%61%6c%73%5f%32%30%31%36%30%38%30%34%55%70%64%61%74%65%73.%78%6c%73%78 2016Sep Ballot items Updated] that are unapproved/required followup
 +
#Reports: (attach written reports below from Steering Divisions et al.)
 +
<!-- #WGM Planning - -->
 +
#Parking Lot/[http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=313 Open Issues List]
 +
#*SeptemberWGM prep
 +
#*HL7 documentation formats across standards families - followup from 6-27 call with [http://gforge.hl7.org/gf/download/docmanfileversion/9305/14493/MFHAST_HL7_Standards_Formats.docx associated document]
 +
#*Assignment of outside projects to WGs:
 +
#**1) We need a process for Universal realm projects; 2) We need a model for top down approval process; 3) We need advice published for people coming in with a project from the outside; 4: we need to clearly define role of TSC and steering divisions in this process. Calvin: US Realm should be added to the list for the US things.
 +
#*Continue work on multi-year planning items:
 +
#**Simplification of location of meeting notifications, minutes, agendas, and other documentation - '''merged with Standardization of Processes Across WGs'''
 +
#**Evaluate WG/SD structure: Melva, John, Russ
 +
#**Evaluate opportunities for member/non-member engagement: John, Lorraine, Russ w/Anne assisting
 +
#**Standards organization hierarchy: John
 +
#**Standards sharing across realms: Jean, Giorgio
 +
#**Standardization of processes across WGs: Sandy, Melva, Ken, Tony, w/Anne assisting - rescheduling call due to harmonization
 +
#**Strategy for PSS management throughout the lifecycle: Jean, Calvin, Dave, EST
 +
#***Working on scheduling a call
 +
#*For Work Groups in Yellow or Red status, Gora proposes the following process be implemented when a Steering Division reviews a newly submitted PSS:
 +
#**SD communicates the Yellow/Red Status to the WG
 +
#**WG must acknowledge the notification that they are in Yellow/Red status
  
 
===Next Steps===
 
===Next Steps===
Line 123: Line 188:
 
|-
 
|-
 
|colspan="4" |'''Next Meeting/Preliminary Agenda Items'''<br/>
 
|colspan="4" |'''Next Meeting/Preliminary Agenda Items'''<br/>
*[[2016-MM-DD TSC Call Agenda]].
+
*[[2016-08-08 TSC Call Agenda]].
 
|}
 
|}
  
  
 
© 2016 Health Level Seven® International.  All rights reserved.
 
© 2016 Health Level Seven® International.  All rights reserved.

Latest revision as of 18:56, 20 September 2016

TSC Agenda/Minutes

Meeting Info/Attendees

HL7 TSC Meeting Minutes

Location: GoToMeeting ID: 426-505-829

Date: 2016-08-01
Time: 11:00 AM U.S. Eastern
Facilitator: Ken McCaslin Note taker(s): Dave Hamill
Quorum = chair + 5 including 2 SD represented yes/no
Chair/CTO ArB International Affiliate Rep Ad-Hoc
x Ken McCaslin x Tony Julian . Jean Duteau x Austin Kreisler
x Wayne Kubick . Lorraine Constable . Giorgio Cangioli x Freida Hall, GOM Expert
. . . . Woody Beeler, TSC Member Emeritus
Domain Experts Foundation and Technology Structure and Semantic Design Technical and Support Services
x Melva Peters x Russ Hamm . Calvin Beebe . Andy Stechishin
x John Roberts . Paul Knapp x Gora Datta . Sandra Stuart
. . . .
ex officio Invited Guests Observers HL7 Staff
. Pat Van Dyke (HL7 Chair) w/vote . . obs1 x Dave Hamill
. Chuck Jaffe (CEO) vote . . . obs2 .


. . . . .

Agenda

Housekeeping

  1. Introduction of visitors (including declaration of interests)
  2. Agenda review and approval -
  3. Approve Minutes of 2016-07-25 TSC Call Agenda
  4. Review action items
  5. Approval Items from previous weeks with followup:
    • Revised Project Approval Request by the CQI WG of the DESD of Common Clinical Registry Framework Domain Analysis Model at Project Insight TBD and TSC Tracker 10051
      • DESD: Item 2, WG level of involvement is not completed. Items 6c and PBS metrics review not completed. Item 6D, local and state departments of health should be checked.
      • ARB: Is this investigative? Otherwise why not balloting?
        • Melva to follow up on items 2, 6c and 6d
        • UPDATE: Revised PSS submitted; will be in this week's e-vote
    • Project Approval Request by the EHR WG of the SSD-SD of HL7 Personal Health Record System Functional Model – Update from Release 1 to Release 2 format at Project Insight TBD and TSC Tracker 10253
      • Freida: Does this need to be a Joint Initiative Council (JIC) ballot if it is going to ISO? JointInitiativeCouncil.org mentions HL7-ISO Pilot Agreement and joint copyright in §5.b
        • ACTION: Wayne to contact Ed as he is the formal HL7 rep to ISO
    • STU Publication Request by the PHER WG of the DESD for HL7 Version 2.6 Implementation Guide: Vital Records Death Reporting (US Realm), Release 1 at Project Insight 1208 and TSC Tracker 10372
      • Referred by Freida: It seems the Project Insight # may be incorrect reference? Per the ballot desktop, the January 2016 ballot was: HL7 Version 2.6 Implementation Guide: Vital Records Death Reporting (US Realm), Release 1 (PI ID: 735) The Publication Request indicates both project ids, don’t know why 735 says “delete?”
      • Anne checked with Lynn; she states "Vital Records' project ID was changed with the new PSS. It used to be 735 but is now balloting under 1208."
        • ACTION: Anne to talk with Dave to make sure old project (735) is closed.
        • UPDATE: Dave has archived project 735
  6. Approval items from last week's e-vote referred for discussion:
    • Project Approval Request by the FHIR-I WG of the FTSD of Data Access Framework (DAF) FHIR Implementation Guide(s) at Project Insight 1265 and TSC Tracker 10402
      • Referred by T3SD, Giorgio, and DESD: All comments are regarding deferral of vote until cosponsors have approved
      • Referred by Freida: Does this need ARB review of externally developed content? PSS needs to better explain when/what ARB needs to review; change request entered for next PSS update.
  7. Approval items from last week's e-vote approved 8/0/0 with DESD, FTSD, SSD-SD, T3SD, Giorgio, Melva, Wayne, and Austin voting:
  8. Approval items for this week:
  9. Discussion topics:
  10. Reports: (attach written reports below from Steering Divisions et al.)
  11. Parking Lot/Open Issues List
    • SeptemberWGM prep
    • HL7 documentation formats across standards families - followup from 6-27 call with associated document
    • Assignment of outside projects to WGs:
      • 1) We need a process for Universal realm projects; 2) We need a model for top down approval process; 3) We need advice published for people coming in with a project from the outside; 4: we need to clearly define role of TSC and steering divisions in this process. Calvin: US Realm should be added to the list for the US things.
    • Continue work on multi-year planning items:
      • Simplification of location of meeting notifications, minutes, agendas, and other documentation - merged with Standardization of Processes Across WGs
      • Evaluate WG/SD structure: Melva, John, Russ
      • Evaluate opportunities for member/non-member engagement: John, Lorraine, Russ w/Anne assisting
      • Standards organization hierarchy: John
      • Standards sharing across realms: Jean, Giorgio
      • Standardization of processes across WGs: Sandy, Melva, Ken, Tony, w/Anne assisting - rescheduling call due to harmonization
      • Strategy for PSS management throughout the lifecycle: Jean, Calvin, Dave, EST
        • Working on scheduling a call

Minutes

Minutes/Conclusions Reached:

  1. Introduction of visitors (including declaration of interests)
  2. Agenda review and approval -
  3. Approve Minutes of 2016-07-25 TSC Call Agenda
    • Accepted by general consent
  4. Review action items
    • Reviewed 2016Sep Ballot items Updated. Motions/Notes captured in the XLS file as well as detailed below. Also, Dave walked through the spreadsheet with Lynn Laakso on 8/4/2016.
      • HL7 EHR System Usability Conformance Criteria, Release 1 (2nd Comment-Only Ballot) (PI ID: 995)
        • Motion by Gora; seconded by Hal; Approve the document based on the condition that the Work Group will determine whether the dash should be included in the title as in ‘EHR System. Unanimously approved.
        • Once the EHR WG has decided, they should contact Frieda Hall to let her know the decision so that she can update the GOM.
        • 8/4/2016 Update Per Lynn Laakso, she has updated the ballot desktop and will include the following in her in her ballot update document: The title of the item initially announced as HL7 EHR System Usability Conformance Criteria, Release 1 (2nd Comment-Only Ballot) (PI ID: 995) has been modified to HL7 EHRS-FM Release 2: Usability Conformance Criteria, Release 1 (PI ID: 995) to better reflect the updated naming conventions approved by the TSC. This did result in a change to the Unique Ballot ID: EHRS_USEGUIDE_R1_O2_2016SEP to: EHRSFM_R2_USEGUIDE_R1_O2_2016SEP.
      • HL7 FHIR® IG: Data Access Framework (DAF) Research, Release 1 (1st Comment-Only Ballot) (PI ID: 1265)
        • Dave to reach out to Jonathon Coleman to attend the ArB meeting on Tuesday to explain the externally developed content and cc Tony and Wayne.
        • Motion to approve subject to ArB approval by Hall; Beebe seconds; Unanimously approved.
        • 8/4/2016 Update: ArB approved.
      • HL7 Specification: Standards Privacy Impact Assessment (SPIA) Implementation Guide, Release 1 (PI ID: 1263) Requesting alternate ballot title "Standards Privacy Impact Assessment (SPIA) Cookbook" (1st Informative Ballot)
        • Datta motions; Stuart seconds motions to approve title subjected to the Work Group agreeing.Unanimously approved.
        • ACTION ITEM: Dave/Anne to have the Work Group inform the TSC upon their decision.
        • Dave completed on 8/4/2016
  5. Approval Items from previous weeks with followup:
    • Revised Project Approval Request by the CQI WG of the DESD of Common Clinical Registry Framework Domain Analysis Model at Project Insight TBD and TSC Tracker 10051
      • DESD: Item 2, WG level of involvement is not completed. Items 6c and PBS metrics review not completed. Item 6D, local and state departments of health should be checked.
      • ARB: Is this investigative? Otherwise why not balloting?
        • Melva to follow up on items 2, 6c and 6d
        • UPDATE: Dave to put in this week's e-vote
    • Project Approval Request by the EHR WG of the SSD-SD of HL7 Personal Health Record System Functional Model – Update from Release 1 to Release 2 format at Project Insight TBD and TSC Tracker 10253
      • Freida: Does this need to be a Joint Initiative Council (JIC) ballot if it is going to ISO? JointInitiativeCouncil.org mentions HL7-ISO Pilot Agreement and joint copyright in §5.b
        • ACTION: Wayne to contact Ed as he is the formal HL7 rep to ISO
    • STU Publication Request by the PHER WG of the DESD for HL7 Version 2.6 Implementation Guide: Vital Records Death Reporting (US Realm), Release 1 at Project Insight 1208 and TSC Tracker 10372
      • Referred by Freida: It seems the Project Insight # may be incorrect reference? Per the ballot desktop, the January 2016 ballot was: HL7 Version 2.6 Implementation Guide: Vital Records Death Reporting (US Realm), Release 1 (PI ID: 735) The Publication Request indicates both project ids, don’t know why 735 says “delete?”
      • Anne checked with Lynn; she states "Vital Records' project ID was changed with the new PSS. It used to be 735 but is now balloting under 1208."
        • ACTION: Anne to talk with Dave to make sure old project (735) is closed.
        • UPDATE: Dave conveyed Michelle Williamson's explanation regarding project 735 vs 1208: "Our first IG (DSTU 1) was a V2.5.1 Vital Records Death Reporting IG. 735; The current IG is DSTU 2 – V2.6 Vital Records Death Reporting IG. 1208"
        • TSC was fine with archiving 735. Dave to put in this week's e-vote
  6. Approval items from last week's e-vote referred for discussion:
    • Project Approval Request by the FHIR-I WG of the FTSD of Data Access Framework (DAF) FHIR Implementation Guide(s) at Project Insight 1265 and TSC Tracker 10402
      • Referred by T3SD, Giorgio, and DESD: All comments are regarding deferral of vote until cosponsors have approved
      • Referred by Freida: Does this need ARB review of externally developed content? PSS needs to better explain when/what ARB needs to review; change request entered for next PSS update.
      • UPDATE: Discussion and Motion documented in the Ballot Review XLS file (agenda item #2 above)
  7. Approval items from last week's e-vote approved 8/0/0 with DESD, FTSD, SSD-SD, T3SD, Giorgio, Melva, Wayne, and Austin voting:
  8. Approval items for this week (Dave to send out in an e-vote):
  9. Discussion topics:
  10. Reports: (attach written reports below from Steering Divisions et al.)
  11. Parking Lot/Open Issues List
    • SeptemberWGM prep
    • HL7 documentation formats across standards families - followup from 6-27 call with associated document
    • Assignment of outside projects to WGs:
      • 1) We need a process for Universal realm projects; 2) We need a model for top down approval process; 3) We need advice published for people coming in with a project from the outside; 4: we need to clearly define role of TSC and steering divisions in this process. Calvin: US Realm should be added to the list for the US things.
    • Continue work on multi-year planning items:
      • Simplification of location of meeting notifications, minutes, agendas, and other documentation - merged with Standardization of Processes Across WGs
      • Evaluate WG/SD structure: Melva, John, Russ
      • Evaluate opportunities for member/non-member engagement: John, Lorraine, Russ w/Anne assisting
      • Standards organization hierarchy: John
      • Standards sharing across realms: Jean, Giorgio
      • Standardization of processes across WGs: Sandy, Melva, Ken, Tony, w/Anne assisting - rescheduling call due to harmonization
      • Strategy for PSS management throughout the lifecycle: Jean, Calvin, Dave, EST
        • Working on scheduling a call
    • For Work Groups in Yellow or Red status, Gora proposes the following process be implemented when a Steering Division reviews a newly submitted PSS:
      • SD communicates the Yellow/Red Status to the WG
      • WG must acknowledge the notification that they are in Yellow/Red status

Next Steps

Actions (Include Owner, Action Item, and due date)
  • .
Next Meeting/Preliminary Agenda Items


© 2016 Health Level Seven® International. All rights reserved.