Difference between revisions of "Work Group Health"

From HL7 TSC
Jump to navigation Jump to search
 
(46 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
This page contains the links and charts for the latest Work Group Health (WGH) information by Steering Division.
 
This page contains the links and charts for the latest Work Group Health (WGH) information by Steering Division.
 +
 +
2019May Interim cycle Projects, Ballots and Standards (PBS) Metrics report is available
 +
[https://confluence.hl7.org/download/attachments/49643830/PBS_Metrics_20190329_interim.xlsx?api=v2 HERE]
  
 
Current WGH Snapshots: [http://gforge.hl7.org/gf/project/tsc/frs/?action=FrsReleaseBrowse&frs_package_id=121&_br_pkgrls_total=50&_br_pkgrls_page=1&br_pkgrlssort_by=release_date&br_pkgrlssort_order=desc Browse all packages] <br/>
 
Current WGH Snapshots: [http://gforge.hl7.org/gf/project/tsc/frs/?action=FrsReleaseBrowse&frs_package_id=121&_br_pkgrls_total=50&_br_pkgrls_page=1&br_pkgrlssort_by=release_date&br_pkgrlssort_order=desc Browse all packages] <br/>
or see the latest releases for 2016Jan Update Release:
+
or see the latest releases for 2019Jan:
*[http://gforge.hl7.org/gf/download/frsrelease/1191/14216/DESD-WorkGroupHealth_2016May.pdf DESD May Report]
+
 
*[http://gforge.hl7.org/gf/download/frsrelease/1191/14215/FTSD-WorkGroupHealth_2016May.pdf FTSD May Report]
+
[https://confluence.hl7.org/display/TSC/2019May+Interim+Reports 2019May Interim Work Group Health Reports]
*[http://gforge.hl7.org/gf/download/frsrelease/1191/14214/SSD_SD-WorkGroupHealth_2016May.pdf SSD-SD May Report]
 
*[http://gforge.hl7.org/gf/download/frsrelease/1191/14213/TSS_SD-WorkGroupHealth_2016May.pdf T3SD May Report]
 
  
 
__NOTOC__
 
__NOTOC__
Line 12: Line 13:
 
==What is measured?==
 
==What is measured?==
 
What is measured?  The activities count the bold headings on the grid, namely:
 
What is measured?  The activities count the bold headings on the grid, namely:
*Active projects – if less than 1, the count is incremented. Active projects are approved projects in active status with resources working on them (does not count 3-Yr Plan, On Hold, or unapproved projects).
+
{| class="wikitable" <!-- generated with [[w:de:Wikipedia:Technik/Text/Basic/EXCEL-Tabellenumwandlung]] V2.0 -->
*Mission and Charter statement(M&C) < 2 yrs old - If the Work Group's Mission and Charter has not been updated in the past two years, the count is incremented
+
|- style="font-size:11pt"  valign="top"
**Updated content to Mission and Charter statements must be approved by a vote in the Work Group and approved by the Steering Division
+
| align="right" width="167" height="15" | &nbsp;
**Reviews without changes to Mission and Charter statements must be voted upon by the Work Group and the Steering Division notified
+
|style="font-weight:bold" width="48" | Work Group (WG) Health Metric Has Been Met If:
*Decision Making Practices (DMP) - WG has an approved DMP less than 3 years old (changed 2014Feb)
+
 
**A change to a Work Group's DMP must be approved by a vote in the Work Group; Steering Division approval is not required. Send approved DMPs to PIC for review and to Lynn (at) HL7.org for publishing.
+
|- style="font-size:11pt;font-weight:bold"  valign="top"
*'''Project Health''' (new 2013Jan) - The newest metric is Project Health, which is a combination of the number of RED from the following {BS Metrics:
+
| height="15" | Active Projects
**Recirculation
+
| A WG has 1 or more active projects.  
**Unpublished Ballots
+
 
**Work Group Missing 3YP Items in Pjt Insight
+
|- style="font-size:11pt"
**% of PI Items with Nxt Milestone  Behind > 120 Days
+
|style="font-weight:bold" align="right" height="15"  valign="top" | &nbsp;
*SWOT – The Work Group's SWOT analysis should be less than three years old; if not, the count is incremented
+
| valign="bottom" | *Active projects are approved projects in active status with resources working on them  
**SWOT analysis should be approved by a vote in the Work Group; Steering Division approval is not required but Steering Division review is recommended
+
 
*Co-Chair Post-WGM Survey - if the Work Group did not participate in the post-WGM survey for the immediate past WGM, the count is incremented
+
|- style="font-size:11pt"
**Only one co-chair from each Work Group should participate in the survey
+
|style="font-weight:bold" align="right" height="15"  valign="top" | &nbsp;
*Ballot Presence - If the Work Group did not participate in the current ballot cycle or the two ballot cycles previous, the count is incremented (Not measured for T3SD nor *healthiest* WG)
+
| valign="bottom" | *This measure does not include 3-Yr Plan, On Hold, or unapproved projects
**Co-sponsorship of a ballot is also considered toward participation
+
 
*Minutes posted since last WGM – if posted minutes from the prior WGM or interim teleconferences are not present the count is incremented. Posting of minutes can be on the Work Group's page on the HL7 web site or at the location pointed to from the Work Group's "Additional Resources" on the Web site (e.g. on the Wiki).
+
|- style="font-size:11pt;font-weight:bold"  valign="top"
**Posted minutes of the last WGM are counted although a better demonstration of WGH is to have posted minutes of conference calls occurring between WGMs.
+
| height="15" | M&C < 2 yrs old
*Last listserv activity - if no activity has occurred on the list serv since the last WGM, the count is incremented
+
| The WG's Mission and Charter (M&C) Statement has been updated in the past two (2) years
*'''Harmonization Participation''' (updated 2013May): if the Work Group did not have a representative attend Harmonization in the past cycle, or if the WG does not indicate to the Harmonization listserv they have reviewed the items for harmonization this cycle and have no input, the count is incremented (excludes T3SD and not measured for *Healthiest* WG)
+
 
**Participation is measured by the attendees' self-declaration of the Work Group(s) they are representing. An attendee can represent more than one Work Group.
+
|- style="font-size:11pt"
*WG CC Scheduled – if the Work Group has not scheduled any conference calls since the last WGM, the count is incremented (may be validated using conference calling service records whether calls were actually conducted, in addition to whether they were scheduled, as well)
+
|style="font-weight:bold" align="right" height="15"  valign="top" | &nbsp;
**For those WGs who do not conduct conference calls, out-of-cycle meetings are counted towards demonstration of interim activity between Working Group Meetings of the WG
+
| valign="bottom" | *Changes to Mission and Charter statements must be approved by the WG and Steering Division
*SD CC Participation – if the Work Group did not have at least 50% representation at Steering Division conference calls or e-votes since the last meeting, the count is incremented (i.e. DESD uses Doodle Polls; SSD SD both e-vote and concalls; FTSD & T3SD usually conf calls)
+
 
<!--   -->
+
|- style="font-size:11pt"
*Steering Division co-chair (TSC Representative) Election Participation – if the Work Group did not cast a vote for their Steering Division co-chair, i.e. representative of the Steering Division to the TSC in the annual election prior to the Plenary meeting, the count is incremented
+
|style="font-weight:bold" align="right" height="15"  valign="top" | &nbsp;
**This metric continues to be represented in each cycle, not just in the plenary cycle, for even though the activity is only conducted once per year the effect perseveres through all cycles.
+
| valign="bottom" | *Review without changes to Mission and Charter statements must be approved by the WG with notification to Steering Division
*WG Rep at SD WGM - if WG does not have a representative at the previous Face to Face Steering Division Work Group Meeting, the count is incremented
+
 
*WGM scheduled – if the Work Group did not schedule any meetings in person at the WGM, the count is incremented. 
+
|- style="font-size:11pt;font-weight:bold"
**Meetings counted are Host only; joint meetings not counted.
+
| height="15"  valign="top" | Project Health
*Co-Chair WGM Tasks
+
| valign="bottom" | Project Health is not Red (must be Green or Yellow)
**This metric is an evaluation of the following tasks and their completion by the deadlines set and announced in the countdown calendar: WGM room requests; posting the previous cycle's WGM minutes (i.e., the May report evaluates if the January minutes were posted on time) and posting the upcoming WGM agenda. WGs receive credit if two of the three tasks have been completed on time in the cycle.
+
|- style="font-size:11pt"
 +
|style="font-weight:bold" align="right" height="15"  valign="top" | &nbsp;
 +
| valign="bottom" | *Project Health as expressed on the WG Health spreadsheets is calculated by combining the following measures from the PBS metrics spreadsheet:
 +
 
 +
|- style="font-size:11pt"
 +
| align="right" height="15"  valign="top" | &nbsp;
 +
| valign="bottom" | *Ballots requiring recirculation
 +
 
 +
|- style="font-size:11pt"
 +
| align="right" height="15"  valign="top" | &nbsp;
 +
| valign="bottom" | *Unpublished ballots
 +
 
 +
|- style="font-size:11pt"
 +
| align="right" height="15"  valign="top" | &nbsp;
 +
| valign="bottom" | *WG Missing 3 year plan items in Project Insight
 +
 
 +
|- style="font-size:11pt"
 +
| align="right" height="15"  valign="top" | &nbsp;
 +
| valign="bottom" | *Percentage of project insight items with next milestone behind > 120 days
 +
 
 +
|- style="font-size:11pt"
 +
| align="right" height="15" valign="top" | &nbsp;
 +
| valign="bottom" | *A WG with red status on Project Health on Projects, Ballots, and Standards metrics will be incremented on WG Health as well.
 +
 
 +
|- style="font-size:11pt;font-weight:bold"
 +
| height="15"  valign="top" | SWOT
 +
| valign="bottom" | The WG's Strengths, Weaknesses, Opportunities, and Threats (SWOT) document has been updated in the past three (3) years
 +
 
 +
|- style="font-size:11pt;font-weight:bold"
 +
| height="15"  valign="top" | Ballot Presence
 +
| valign="bottom" | The WG participated in the current or preceding two ballot cycles
 +
 
 +
|- style="font-size:11pt"
 +
| align="right" height="15"  valign="top" | &nbsp;
 +
| valign="bottom" | *A WG with an increment in this category is still eligible for "healthiest" status if all other measures are met
 +
 
 +
|- style="font-size:11pt"
 +
| align="right" height="15"  valign="top" | &nbsp;
 +
| valign="bottom" | *This category is not measured for T3SD
 +
 
 +
|- style="font-size:11pt;font-weight:bold"  valign="top"
 +
| height="15" | Minutes Posted Since Last WGM
 +
| The WG has posted minutes since the last Working Group Meeting (WGM)
 +
 
 +
|- style="font-size:11pt"
 +
| align="right" height="15"  valign="top" | &nbsp;
 +
| valign="bottom" | *Minutes may be either posted to the WG's page on HL7.org, or the HL7.org page can link to minutes posted on the WG's wiki or Confluence page
 +
 
 +
|- style="font-size:11pt;font-weight:bold"  valign="top"
 +
| height="15" | Last Listserv Activity
 +
|style="font-size:11pt" | Activity has occurred on the WG's listserv since the last WGM
 +
 
 +
|- style="font-size:11pt;font-weight:bold"  valign="top"
 +
| height="15" | Harmonization Participation
 +
| A WG representative attended Harmonization in the past cycle
 +
 
 +
|- style="font-size:11pt"
 +
|style="font-weight:bold" align="right" height="15"  valign="top" | &nbsp;
 +
| valign="bottom" | *Participation is measured by attendees' self declaration of the WG they are representing; attendees can represent more than one WG
 +
 
 +
|- style="font-size:11pt"
 +
| align="right" height="15"  valign="top" | &nbsp;
 +
| valign="bottom" | *If the WG reviews the items for harmonization and has no input, they may also satisfy this requirement by stating that in a message to the harmonization listserv
 +
 
 +
|- style="font-size:11pt;font-weight:bold"  valign="top"
 +
| height="15" | WG CC Scheduled
 +
| The WG has scheduled and held conference calls since the last WGM
 +
 
 +
|- style="font-size:11pt"
 +
| align="right" height="15"  valign="top" | &nbsp;
 +
| valign="bottom" | *For WGs that do not conduct conference calls, approved out-of-cycle meetings also satisfy this requirement
 +
 
 +
|- style="font-size:11pt;font-weight:bold"  valign="top"
 +
| height="15" | SD CC Participation
 +
| The WG had representation on at least 50% of Steering Division conference calls or e-votes since the last WGM
 +
 
 +
|- style="font-size:11pt;font-weight:bold"  valign="top"
 +
| height="15" | TSC Election Participation
 +
| The WG voted for their Steering Division co-chair in the annual TSC election prior to the Plenary meeting
 +
 
 +
|- style="font-size:11pt;font-weight:bold"  valign="top"
 +
| height="15" | WG Rep at SD WGM
 +
  | The WG had a representative at the previous Steering Division Meeting at the WGM
 +
 
 +
|- style="font-size:11pt;font-weight:bold"  valign="top"
 +
| height="15" | WGM Scheduled
 +
| The WG scheduled one or more in-person meetings at the upcoming WGM
 +
 
 +
|- style="font-size:11pt;font-weight:bold"  valign="top"
 +
| height="15" | Co-Chair WGM Tasks
 +
| The WG completed the prescribed activities by the stated deadlines, including:
 +
 
 +
|- style="font-size:11pt"
 +
| align="right" height="15"  valign="top" | &nbsp;
 +
| valign="bottom" | *Completed the WGM Room Request Form on time
 +
 
 +
|- style="font-size:11pt"
 +
| align="right" height="15"  valign="top" | &nbsp;
 +
| valign="bottom" | *Posted the previous cycle's WGM minutes on time
 +
 
 +
|- style="font-size:11pt"
 +
| align="right" height="15"  valign="top" | &nbsp;
 +
| valign="bottom" | *Posted the upcoming WGM agenda on time
 +
 
 +
|- style="font-size:11pt"
 +
| align="right" height="15"  valign="top" | &nbsp;
 +
| valign="bottom" | *Credit is given when two out of three tasks are completed on time
 +
 
 +
|}
 +
 
  
  
 
===Suggestions?===
 
===Suggestions?===
*Suggestions for enhancements to the Work Group Health metrics are being tracked in the TSC GForge project at http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=616. Send suggestions to Lynn to be considered at the next WGM.
+
*Suggestions for enhancements to the Work Group Health metrics are being tracked in the TSC GForge project at http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=616. Send suggestions to Anne to be considered at the next WGM.
  
 
==Key:==
 
==Key:==
Line 60: Line 170:
 
http://gforge.hl7.org/gf/project/tsc/frs/?action=FrsReleaseBrowse&frs_package_id=121
 
http://gforge.hl7.org/gf/project/tsc/frs/?action=FrsReleaseBrowse&frs_package_id=121
  
 +
<!--
 
{|width=100% cellspacing=0 cellpadding=2 border="1"
 
{|width=100% cellspacing=0 cellpadding=2 border="1"
 
|-
 
|-
Line 137: Line 248:
 
|}
 
|}
  
 +
-->
  
 
+
© 2018 Health Level Seven® International.  All rights reserved.
© 2014 Health Level Seven® International.  All rights reserved.
 

Latest revision as of 19:45, 10 April 2019

This page contains the links and charts for the latest Work Group Health (WGH) information by Steering Division.

2019May Interim cycle Projects, Ballots and Standards (PBS) Metrics report is available HERE

Current WGH Snapshots: Browse all packages
or see the latest releases for 2019Jan:

2019May Interim Work Group Health Reports


What is measured?

What is measured? The activities count the bold headings on the grid, namely:

  Work Group (WG) Health Metric Has Been Met If:
Active Projects A WG has 1 or more active projects.
  *Active projects are approved projects in active status with resources working on them
  *This measure does not include 3-Yr Plan, On Hold, or unapproved projects
M&C < 2 yrs old The WG's Mission and Charter (M&C) Statement has been updated in the past two (2) years
  *Changes to Mission and Charter statements must be approved by the WG and Steering Division
  *Review without changes to Mission and Charter statements must be approved by the WG with notification to Steering Division
Project Health Project Health is not Red (must be Green or Yellow)
  *Project Health as expressed on the WG Health spreadsheets is calculated by combining the following measures from the PBS metrics spreadsheet:
  *Ballots requiring recirculation
  *Unpublished ballots
  *WG Missing 3 year plan items in Project Insight
  *Percentage of project insight items with next milestone behind > 120 days
  *A WG with red status on Project Health on Projects, Ballots, and Standards metrics will be incremented on WG Health as well.
SWOT The WG's Strengths, Weaknesses, Opportunities, and Threats (SWOT) document has been updated in the past three (3) years
Ballot Presence The WG participated in the current or preceding two ballot cycles
  *A WG with an increment in this category is still eligible for "healthiest" status if all other measures are met
  *This category is not measured for T3SD
Minutes Posted Since Last WGM The WG has posted minutes since the last Working Group Meeting (WGM)
  *Minutes may be either posted to the WG's page on HL7.org, or the HL7.org page can link to minutes posted on the WG's wiki or Confluence page
Last Listserv Activity Activity has occurred on the WG's listserv since the last WGM
Harmonization Participation A WG representative attended Harmonization in the past cycle
  *Participation is measured by attendees' self declaration of the WG they are representing; attendees can represent more than one WG
  *If the WG reviews the items for harmonization and has no input, they may also satisfy this requirement by stating that in a message to the harmonization listserv
WG CC Scheduled The WG has scheduled and held conference calls since the last WGM
  *For WGs that do not conduct conference calls, approved out-of-cycle meetings also satisfy this requirement
SD CC Participation The WG had representation on at least 50% of Steering Division conference calls or e-votes since the last WGM
TSC Election Participation The WG voted for their Steering Division co-chair in the annual TSC election prior to the Plenary meeting
WG Rep at SD WGM The WG had a representative at the previous Steering Division Meeting at the WGM
WGM Scheduled The WG scheduled one or more in-person meetings at the upcoming WGM
Co-Chair WGM Tasks The WG completed the prescribed activities by the stated deadlines, including:
  *Completed the WGM Room Request Form on time
  *Posted the previous cycle's WGM minutes on time
  *Posted the upcoming WGM agenda on time
  *Credit is given when two out of three tasks are completed on time


Suggestions?

Key:

  • 0-3: Green light
  • 4-7: Yellow light
  • 8+ : Red light


Archives

Full spreadsheets, as well as snapshots of point-in-time work group health portraits are available by Steering Division on GForge at: http://gforge.hl7.org/gf/project/tsc/frs/?action=FrsReleaseBrowse&frs_package_id=121


© 2018 Health Level Seven® International. All rights reserved.