Difference between revisions of "Work Group Health"

From HL7 TSC
Jump to navigation Jump to search
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
This page contains the links and charts for the latest Work Group Health (WGH) information by Steering Division.
 
This page contains the links and charts for the latest Work Group Health (WGH) information by Steering Division.
  
2018Sep cycle Projects, Ballots and Standards (PBS) Metrics report is available  
+
2019May Interim cycle Projects, Ballots and Standards (PBS) Metrics report is available  
[https://gforge.hl7.org/gf/download/frsrelease/1303/16937/PBS_Metrics_20180924_2018SepWGM.xlsx HERE]
+
[https://confluence.hl7.org/download/attachments/49643830/PBS_Metrics_20190329_interim.xlsx?api=v2 HERE]
  
 
Current WGH Snapshots: [http://gforge.hl7.org/gf/project/tsc/frs/?action=FrsReleaseBrowse&frs_package_id=121&_br_pkgrls_total=50&_br_pkgrls_page=1&br_pkgrlssort_by=release_date&br_pkgrlssort_order=desc Browse all packages] <br/>
 
Current WGH Snapshots: [http://gforge.hl7.org/gf/project/tsc/frs/?action=FrsReleaseBrowse&frs_package_id=121&_br_pkgrls_total=50&_br_pkgrls_page=1&br_pkgrlssort_by=release_date&br_pkgrlssort_order=desc Browse all packages] <br/>
or see the latest releases for 2018:
+
or see the latest releases for 2019Jan:
  
*[https://gforge.hl7.org/gf/download/frsrelease/1298/16939/AdministrativeSDWorkGroupHealth_2018Sep.pdf Administrative Steering Division - September Report]
+
[https://confluence.hl7.org/display/TSC/2019May+Interim+Reports 2019May Interim Work Group Health Reports]
*[https://gforge.hl7.org/gf/download/frsrelease/1298/16941/ClinicalSDWorkGroupHealth2018Sep.pdf Clinical Steering Division - September Report]
 
*[https://gforge.hl7.org/gf/download/frsrelease/1298/16943/InfrastructureSD-WorkGroupHealth_2018Sep.pdf Infrastructure Steering Division - September Report]
 
*[https://gforge.hl7.org/gf/download/frsrelease/1298/16942/OrgSupportWorkGroupHealth_2018Sep.pdf Organizational Support Steering Division - September Report]
 
  
 
__NOTOC__
 
__NOTOC__

Latest revision as of 19:45, 10 April 2019

This page contains the links and charts for the latest Work Group Health (WGH) information by Steering Division.

2019May Interim cycle Projects, Ballots and Standards (PBS) Metrics report is available HERE

Current WGH Snapshots: Browse all packages
or see the latest releases for 2019Jan:

2019May Interim Work Group Health Reports


What is measured?

What is measured? The activities count the bold headings on the grid, namely:

  Work Group (WG) Health Metric Has Been Met If:
Active Projects A WG has 1 or more active projects.
  *Active projects are approved projects in active status with resources working on them
  *This measure does not include 3-Yr Plan, On Hold, or unapproved projects
M&C < 2 yrs old The WG's Mission and Charter (M&C) Statement has been updated in the past two (2) years
  *Changes to Mission and Charter statements must be approved by the WG and Steering Division
  *Review without changes to Mission and Charter statements must be approved by the WG with notification to Steering Division
Project Health Project Health is not Red (must be Green or Yellow)
  *Project Health as expressed on the WG Health spreadsheets is calculated by combining the following measures from the PBS metrics spreadsheet:
  *Ballots requiring recirculation
  *Unpublished ballots
  *WG Missing 3 year plan items in Project Insight
  *Percentage of project insight items with next milestone behind > 120 days
  *A WG with red status on Project Health on Projects, Ballots, and Standards metrics will be incremented on WG Health as well.
SWOT The WG's Strengths, Weaknesses, Opportunities, and Threats (SWOT) document has been updated in the past three (3) years
Ballot Presence The WG participated in the current or preceding two ballot cycles
  *A WG with an increment in this category is still eligible for "healthiest" status if all other measures are met
  *This category is not measured for T3SD
Minutes Posted Since Last WGM The WG has posted minutes since the last Working Group Meeting (WGM)
  *Minutes may be either posted to the WG's page on HL7.org, or the HL7.org page can link to minutes posted on the WG's wiki or Confluence page
Last Listserv Activity Activity has occurred on the WG's listserv since the last WGM
Harmonization Participation A WG representative attended Harmonization in the past cycle
  *Participation is measured by attendees' self declaration of the WG they are representing; attendees can represent more than one WG
  *If the WG reviews the items for harmonization and has no input, they may also satisfy this requirement by stating that in a message to the harmonization listserv
WG CC Scheduled The WG has scheduled and held conference calls since the last WGM
  *For WGs that do not conduct conference calls, approved out-of-cycle meetings also satisfy this requirement
SD CC Participation The WG had representation on at least 50% of Steering Division conference calls or e-votes since the last WGM
TSC Election Participation The WG voted for their Steering Division co-chair in the annual TSC election prior to the Plenary meeting
WG Rep at SD WGM The WG had a representative at the previous Steering Division Meeting at the WGM
WGM Scheduled The WG scheduled one or more in-person meetings at the upcoming WGM
Co-Chair WGM Tasks The WG completed the prescribed activities by the stated deadlines, including:
  *Completed the WGM Room Request Form on time
  *Posted the previous cycle's WGM minutes on time
  *Posted the upcoming WGM agenda on time
  *Credit is given when two out of three tasks are completed on time


Suggestions?

Key:

  • 0-3: Green light
  • 4-7: Yellow light
  • 8+ : Red light


Archives

Full spreadsheets, as well as snapshots of point-in-time work group health portraits are available by Steering Division on GForge at: http://gforge.hl7.org/gf/project/tsc/frs/?action=FrsReleaseBrowse&frs_package_id=121


© 2018 Health Level Seven® International. All rights reserved.