Difference between revisions of "2017-05-01 TSC Call Agenda"
Jump to navigation
Jump to search
Anne wizauer (talk | contribs) |
Anne wizauer (talk | contribs) |
||
(7 intermediate revisions by the same user not shown) | |||
Line 17: | Line 17: | ||
| width="0%" colspan="2" align="left" style="background:#f0f0f0;"|'''HL7 TSC Meeting Minutes''' <br/> | | width="0%" colspan="2" align="left" style="background:#f0f0f0;"|'''HL7 TSC Meeting Minutes''' <br/> | ||
'''Location: GoToMeeting ID: [https://global.gotomeeting.com/join/426505829 426-505-829] | '''Location: GoToMeeting ID: [https://global.gotomeeting.com/join/426505829 426-505-829] | ||
− | | width="0%" colspan="1" align="left" style="background:#f0f0f0;"|'''Date: 2017- | + | | width="0%" colspan="1" align="left" style="background:#f0f0f0;"|'''Date: 2017-05-01<br/> '''Time: 11:00 AM U.S. Eastern''' |
|- | |- | ||
| width="0%" colspan="2" align="right"|'''Facilitator''': Ken McCaslin | | width="0%" colspan="2" align="right"|'''Facilitator''': Ken McCaslin | ||
Line 30: | Line 30: | ||
|colspan="2"|Chair/CTO ||colspan="2"|ArB ||colspan="2"|International Affiliate Rep ||colspan="2"|Ad-Hoc | |colspan="2"|Chair/CTO ||colspan="2"|ArB ||colspan="2"|International Affiliate Rep ||colspan="2"|Ad-Hoc | ||
|- | |- | ||
− | | | + | |Regrets||Ken McCaslin||x||Tony Julian||.|| Jean Duteau||.||Woody Beeler, TSC Member Emeritus |
|- | |- | ||
− | | | + | |x||Wayne Kubick ||x||Lorraine Constable||.|| Giorgio Cangioli||x||Freida Hall, GOM Expert |
|- | |- | ||
|.|| ||.|| ||.|| ||.|| | |.|| ||.|| ||.|| ||.|| | ||
Line 44: | Line 44: | ||
|Regrets||Melva Peters||.||Russ Hamm||.||Calvin Beebe||.||Andy Stechishin | |Regrets||Melva Peters||.||Russ Hamm||.||Calvin Beebe||.||Andy Stechishin | ||
|- | |- | ||
− | |Regrets||John Roberts|| | + | |Regrets||John Roberts||x||Paul Knapp||x||Austin Kreisler||x||Sandra Stuart |
|- | |- | ||
|.|| ||. || ||.|| ||.|| | |.|| ||. || ||.|| ||.|| | ||
Line 75: | Line 75: | ||
#*Review [http://hl7tsc.org/wiki/index.php?title=2017-05-06_TSC_WGM_Agenda Madrid Agenda] | #*Review [http://hl7tsc.org/wiki/index.php?title=2017-05-06_TSC_WGM_Agenda Madrid Agenda] | ||
#*Review [https://docs.google.com/spreadsheets/d/1swrETd7tvMoeVYiE0nLqhFKZVmtwWPNwgK2eDr8QCm0/edit?usp=sharing TSC essentialism spreadsheet] | #*Review [https://docs.google.com/spreadsheets/d/1swrETd7tvMoeVYiE0nLqhFKZVmtwWPNwgK2eDr8QCm0/edit?usp=sharing TSC essentialism spreadsheet] | ||
− | #*Review CDA Management Group M&C | + | #*Review [http://gforge.hl7.org/gf/project/tsc/docman/Draft%20Documents/Mission%20and%20Charter%20CDA%20Mgmt%20Group%20v1%202017%2004%2026%20SGB.docx CDA Management Group M&C] |
#Review [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=494 action items] – | #Review [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=494 action items] – | ||
+ | #*Wayne to look at examples of how other SDOs name their publications/discuss on Sunday in Madrid | ||
#*Paul to check back with CIMI WG on concerns regarding Project Approval Request of Integration of Information Models and Tools (IIM&T) | #*Paul to check back with CIMI WG on concerns regarding Project Approval Request of Integration of Information Models and Tools (IIM&T) | ||
− | # | + | #*Paul to follow up on improper dispositions on negative votes on [http://gforge.hl7.org/gf/download/trackeritem/13165/15302/HL7_Publication_Request_NMN_R1_D1_2017-04-04.docx STU Publication Request] by the ITS WG of the FTSD for ''HL7 Cross-Paradigm Specification: FHIRPath'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=1237 Project Insight 1237] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=13165&start=0 TSC Tracker 13165] |
#*Melva to go back to WG with reconciliation concerns on [http://gforge.hl7.org/gf/download/trackeritem/13215/15327/HL7%20Publication%20Request%20-%20US%20Meds%20PSS%201291.docx STU Publication Request] by the Pharmacy WG of the DESD for ''HL7 FHIR® Profile: Pharmacy; Medication, Release 1'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=1291 Project Insight 1291] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=13215&start=0 TSC Tracker 13215] | #*Melva to go back to WG with reconciliation concerns on [http://gforge.hl7.org/gf/download/trackeritem/13215/15327/HL7%20Publication%20Request%20-%20US%20Meds%20PSS%201291.docx STU Publication Request] by the Pharmacy WG of the DESD for ''HL7 FHIR® Profile: Pharmacy; Medication, Release 1'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=1291 Project Insight 1291] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=13215&start=0 TSC Tracker 13215] | ||
#*Wayne to contact WG with concerns regarding the [http://gforge.hl7.org/gf/download/trackeritem/13214/15326/HL7%20Out%20of%20Cycle%20request%20for%20May%202017.docx Out of Cycle Meeting Request] by the Attachments WG at [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=13214&start=0 TSC Tracker 13214] | #*Wayne to contact WG with concerns regarding the [http://gforge.hl7.org/gf/download/trackeritem/13214/15326/HL7%20Out%20of%20Cycle%20request%20for%20May%202017.docx Out of Cycle Meeting Request] by the Attachments WG at [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=13214&start=0 TSC Tracker 13214] | ||
#Approval items from last week's e-vote: | #Approval items from last week's e-vote: | ||
+ | #*[http://gforge.hl7.org/gf/download/trackeritem/9799/15316/HL7_PSS_Substantive%20Change_2017.docx Project Approval Request] by the ARB for ''Substantive Change Definition and Documentation'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=1259 Project Insight 1259] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=9799&start=0 TSC Tracker 9799] | ||
#Approval items for this week: | #Approval items for this week: | ||
− | #Discussion topics: | + | #*[http://gforge.hl7.org/gf/download/trackeritem/13305/15374/HL7_Publication_Request_LabOrderDAM%20Extension%202.docx STU extension request] by the OO WG of the SSD-SD for ''HL7 Version 3 Domain Analysis Model: Laboratory Orders, Release 1'' at Project Insight TBD and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=13305&start=0 TSC Tracker 13305] |
+ | #*[http://gforge.hl7.org/gf/download/trackeritem/13304/15373/20170413_HL7%20Project%20Scope%20Statement%20v2016_Additional_C-CDA_ADV_Template%202.docx Project Approval Request] by the Structured Docs WG of the SSD-SD for ''C-CDA R2.1 Volume 3 Update – Advance Directives Templates Clarifications'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=1323 Project Insight 1323] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=13304&start=0 TSC Tracker 13304] | ||
+ | #Discussion topics: | ||
+ | #*[http://gforge.hl7.org/gf/project/tsc/docman/Draft%20Documents/Ballot%20Level%20Change-R2%202.pptx SGB recommendations] regarding ballot level change requests - Calvin | ||
+ | #*Recommendation from SGB regarding process changes which affect standards development - Paul | ||
+ | #**Note: SGB does not see a need for changes to the Project Services "Introducing New Processes" document | ||
<!-- #WGM Planning - --> | <!-- #WGM Planning - --> | ||
#[http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=313 Open Issues List]/Parking Lot | #[http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=313 Open Issues List]/Parking Lot | ||
+ | #*WGs not meeting at international meetings/out of cycle meeting scheduling | ||
+ | #*SGB recommendation on adding a category of ballot disposition for items under consideration for the future | ||
+ | #*Ken to address STU extensions, appropriate ballot reconciliation dispositions, and standards expiration/extension/withdrawal process at the co-chair dinner | ||
+ | #*Wayne and Freida working on co-chair handbook update process | ||
+ | #*FHIR Ballot level issues - waiting for written explanation from Grahame | ||
===Minutes=== | ===Minutes=== | ||
− | + | *Housekeeping | |
+ | **Introduction of visitors (including declaration of interests) | ||
+ | ***No visitors | ||
+ | **Agenda review and approval - | ||
+ | ***No additions | ||
+ | **Approve Minutes of [[2017-04-24 TSC Call Agenda]] | ||
+ | ***Approved via general consent | ||
+ | *Homework | ||
+ | **Review [http://hl7tsc.org/wiki/index.php?title=2017-05-06_TSC_WGM_Agenda Madrid Agenda] | ||
+ | ***Reviewed Madrid agenda. TSC members should let Wayne know if they are interested in running for TSC chair - discussion over process/Freida clarifies. Discussion over lack of formal nomination period in the GOM. Finalized in September. | ||
+ | ***Paul asks if we can move the second part of the essentialism to Q2 - Wayne will check with Ken. | ||
+ | ***Lorraine asks if we can include CIMI in the product roadmap; Wayne confirms that it is included. | ||
+ | **Review [https://docs.google.com/spreadsheets/d/1swrETd7tvMoeVYiE0nLqhFKZVmtwWPNwgK2eDr8QCm0/edit?usp=sharing TSC essentialism spreadsheet] | ||
+ | ***Wayne asks that people make comments/changes before the meeting right in the document. | ||
+ | **Review [http://gforge.hl7.org/gf/project/tsc/docman/Draft%20Documents/Mission%20and%20Charter%20CDA%20Mgmt%20Group%20v1%202017%2004%2026%20SGB.docx CDA Management Group M&C] | ||
+ | ***Also working on a general boilerplate template. | ||
+ | *Review [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=494 action items] – | ||
+ | **Wayne to look at examples of how other SDOs name their publications/discuss on Sunday in Madrid | ||
+ | **Paul to check back with CIMI WG on concerns regarding Project Approval Request of Integration of Information Models and Tools (IIM&T) | ||
+ | ***It went to EST; EST is circulating amongst cochairs to see if they want to join. They have raised an issue with resources/bandwidth to do the work. Lorraine suggests the project provide a liaison. Wayne: Michael Van der Zel is listed as the liaison on the PSS. Lorraine notes there is a tooling quarter for CIM I in Madrid. | ||
+ | **Paul to follow up on improper dispositions on negative votes on [http://gforge.hl7.org/gf/download/trackeritem/13165/15302/HL7_Publication_Request_NMN_R1_D1_2017-04-04.docx STU Publication Request] by the ITS WG of the FTSD for ''HL7 Cross-Paradigm Specification: FHIRPath'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=1237 Project Insight 1237] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=13165&start=0 TSC Tracker 13165] | ||
+ | ***ITS meeting is tomorrow | ||
+ | **Melva to go back to WG with reconciliation concerns on [http://gforge.hl7.org/gf/download/trackeritem/13215/15327/HL7%20Publication%20Request%20-%20US%20Meds%20PSS%201291.docx STU Publication Request] by the Pharmacy WG of the DESD for ''HL7 FHIR® Profile: Pharmacy; Medication, Release 1'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=1291 Project Insight 1291] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=13215&start=0 TSC Tracker 13215] | ||
+ | ***Issue was resolved per Melva. | ||
+ | ***'''Austin withdraws negative and item PASSES.''' | ||
+ | **Wayne to contact WG with concerns regarding the [http://gforge.hl7.org/gf/download/trackeritem/13214/15326/HL7%20Out%20of%20Cycle%20request%20for%20May%202017.docx Out of Cycle Meeting Request] by the Attachments WG at [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=13214&start=0 TSC Tracker 13214] | ||
+ | ***WG responded to Wayne and agreed to everything. Ultimately went to EC because they are the approving body in this situation. | ||
+ | *Approval items from last week's e-vote: | ||
+ | **[http://gforge.hl7.org/gf/download/trackeritem/9799/15316/HL7_PSS_Substantive%20Change_2017.docx Project Approval Request] by the ARB for ''Substantive Change Definition and Documentation'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=1259 Project Insight 1259] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=9799&start=0 TSC Tracker 9799] | ||
+ | *Approval items for this week: | ||
+ | **Lab Order DAM STU extension request | ||
+ | **C-CDA R2.1 V3 update - Advance Directives Templates Clarifications (if final updates from US Realm review are applied) | ||
+ | **Security Labeling Service R2 (if cosponsor dates are added) | ||
+ | *Discussion topics: | ||
+ | **[http://gforge.hl7.org/gf/project/tsc/docman/Draft%20Documents/Ballot%20Level%20Change-R2%202.pptx SGB recommendations] regarding ballot level change requests - Calvin | ||
+ | ***Add to future agenda | ||
+ | **Recommendation from SGB regarding process changes which affect standards development - Paul | ||
+ | ***Note: SGB does not see a need for changes to the Project Services "Introducing New Processes" document | ||
+ | ****Remove from list | ||
+ | <!-- *WGM Planning - --> | ||
+ | *[http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=313 Open Issues List]/Parking Lot | ||
+ | **WGs not meeting at international meetings/out of cycle meeting scheduling | ||
+ | **SGB recommendation on adding a category of ballot disposition for items under consideration for the future | ||
+ | **Ken to address STU extensions, appropriate ballot reconciliation dispositions, and standards expiration/extension/withdrawal process at the co-chair dinner | ||
+ | **Wayne and Freida working on co-chair handbook update process | ||
+ | ***Wayne will touch on it at the WGM | ||
+ | **FHIR Ballot level issues - waiting for written explanation from Grahame | ||
+ | ***Grahame hopes to get to it this week | ||
+ | *Adjourned at 11:38 AM Eastern | ||
===Next Steps=== | ===Next Steps=== | ||
Line 98: | Line 158: | ||
|- | |- | ||
|colspan="4" |'''Next Meeting/Preliminary Agenda Items'''<br/> | |colspan="4" |'''Next Meeting/Preliminary Agenda Items'''<br/> | ||
− | *[[2017- | + | *[[2017-05-22 TSC Call Agenda]]. |
|} | |} | ||
© 2017 Health Level Seven® International. All rights reserved. | © 2017 Health Level Seven® International. All rights reserved. |
Latest revision as of 20:52, 2 May 2017
TSC Agenda/Minutes
Meeting Info/Attendees
Standing Conference Calls
TSC will hold a Conference Call at 11AM Eastern time, each Monday except during scheduled face-to-face Working Group Meetings unless otherwise noted at TSC_Minutes_and_Agendas.
- GoToMeeting at https://global.gotomeeting.com/join/426505829 using VOIP
- For those without access to microphone/speakers:
- US: +1 (224)501-3318
- Canada: +1 (647)497-9379
- Italy: +39 0 230 57 81 80
- Access Code: 426-505-829
- GoToMeeting ID: 426-505-829
HL7 TSC Meeting Minutes Location: GoToMeeting ID: 426-505-829 |
Date: 2017-05-01 Time: 11:00 AM U.S. Eastern | |
Facilitator: Ken McCaslin | Note taker(s): Anne Wizauer |
Quorum = chair + 5 including 2 SD represented | yes/no | ||||||
Chair/CTO | ArB | International Affiliate Rep | Ad-Hoc | ||||
Regrets | Ken McCaslin | x | Tony Julian | . | Jean Duteau | . | Woody Beeler, TSC Member Emeritus |
x | Wayne Kubick | x | Lorraine Constable | . | Giorgio Cangioli | x | Freida Hall, GOM Expert |
. | . | . | . | ||||
Domain Experts | Foundation and Technology | Structure and Semantic Design | Technical and Support Services | ||||
Regrets | Melva Peters | . | Russ Hamm | . | Calvin Beebe | . | Andy Stechishin |
Regrets | John Roberts | x | Paul Knapp | x | Austin Kreisler | x | Sandra Stuart |
. | . | . | . | ||||
ex officio | Invited Guests | Observers | HL7 Staff | ||||
. | Pat Van Dyke (HL7 Chair) w/vote | . | . | obs1 | . | Anne Wizauer | |
. | Chuck Jaffe (CEO) |
. | . | . | obs2 | . |
|
. | . | . | . | . | |||
Agenda
- Housekeeping
- Introduction of visitors (including declaration of interests)
- Agenda review and approval -
- Approve Minutes of 2017-04-24 TSC Call Agenda
- Homework
- Review Madrid Agenda
- Review TSC essentialism spreadsheet
- Review CDA Management Group M&C
- Review action items –
- Wayne to look at examples of how other SDOs name their publications/discuss on Sunday in Madrid
- Paul to check back with CIMI WG on concerns regarding Project Approval Request of Integration of Information Models and Tools (IIM&T)
- Paul to follow up on improper dispositions on negative votes on STU Publication Request by the ITS WG of the FTSD for HL7 Cross-Paradigm Specification: FHIRPath at Project Insight 1237 and TSC Tracker 13165
- Melva to go back to WG with reconciliation concerns on STU Publication Request by the Pharmacy WG of the DESD for HL7 FHIR® Profile: Pharmacy; Medication, Release 1 at Project Insight 1291 and TSC Tracker 13215
- Wayne to contact WG with concerns regarding the Out of Cycle Meeting Request by the Attachments WG at TSC Tracker 13214
- Approval items from last week's e-vote:
- Project Approval Request by the ARB for Substantive Change Definition and Documentation at Project Insight 1259 and TSC Tracker 9799
- Approval items for this week:
- STU extension request by the OO WG of the SSD-SD for HL7 Version 3 Domain Analysis Model: Laboratory Orders, Release 1 at Project Insight TBD and TSC Tracker 13305
- Project Approval Request by the Structured Docs WG of the SSD-SD for C-CDA R2.1 Volume 3 Update – Advance Directives Templates Clarifications at Project Insight 1323 and TSC Tracker 13304
- Discussion topics:
- SGB recommendations regarding ballot level change requests - Calvin
- Recommendation from SGB regarding process changes which affect standards development - Paul
- Note: SGB does not see a need for changes to the Project Services "Introducing New Processes" document
- Open Issues List/Parking Lot
- WGs not meeting at international meetings/out of cycle meeting scheduling
- SGB recommendation on adding a category of ballot disposition for items under consideration for the future
- Ken to address STU extensions, appropriate ballot reconciliation dispositions, and standards expiration/extension/withdrawal process at the co-chair dinner
- Wayne and Freida working on co-chair handbook update process
- FHIR Ballot level issues - waiting for written explanation from Grahame
Minutes
- Housekeeping
- Introduction of visitors (including declaration of interests)
- No visitors
- Agenda review and approval -
- No additions
- Approve Minutes of 2017-04-24 TSC Call Agenda
- Approved via general consent
- Introduction of visitors (including declaration of interests)
- Homework
- Review Madrid Agenda
- Reviewed Madrid agenda. TSC members should let Wayne know if they are interested in running for TSC chair - discussion over process/Freida clarifies. Discussion over lack of formal nomination period in the GOM. Finalized in September.
- Paul asks if we can move the second part of the essentialism to Q2 - Wayne will check with Ken.
- Lorraine asks if we can include CIMI in the product roadmap; Wayne confirms that it is included.
- Review TSC essentialism spreadsheet
- Wayne asks that people make comments/changes before the meeting right in the document.
- Review CDA Management Group M&C
- Also working on a general boilerplate template.
- Review Madrid Agenda
- Review action items –
- Wayne to look at examples of how other SDOs name their publications/discuss on Sunday in Madrid
- Paul to check back with CIMI WG on concerns regarding Project Approval Request of Integration of Information Models and Tools (IIM&T)
- It went to EST; EST is circulating amongst cochairs to see if they want to join. They have raised an issue with resources/bandwidth to do the work. Lorraine suggests the project provide a liaison. Wayne: Michael Van der Zel is listed as the liaison on the PSS. Lorraine notes there is a tooling quarter for CIM I in Madrid.
- Paul to follow up on improper dispositions on negative votes on STU Publication Request by the ITS WG of the FTSD for HL7 Cross-Paradigm Specification: FHIRPath at Project Insight 1237 and TSC Tracker 13165
- ITS meeting is tomorrow
- Melva to go back to WG with reconciliation concerns on STU Publication Request by the Pharmacy WG of the DESD for HL7 FHIR® Profile: Pharmacy; Medication, Release 1 at Project Insight 1291 and TSC Tracker 13215
- Issue was resolved per Melva.
- Austin withdraws negative and item PASSES.
- Wayne to contact WG with concerns regarding the Out of Cycle Meeting Request by the Attachments WG at TSC Tracker 13214
- WG responded to Wayne and agreed to everything. Ultimately went to EC because they are the approving body in this situation.
- Paul to check back with CIMI WG on concerns regarding Project Approval Request of Integration of Information Models and Tools (IIM&T)
- Approval items from last week's e-vote:
- Project Approval Request by the ARB for Substantive Change Definition and Documentation at Project Insight 1259 and TSC Tracker 9799
- Approval items for this week:
- Lab Order DAM STU extension request
- C-CDA R2.1 V3 update - Advance Directives Templates Clarifications (if final updates from US Realm review are applied)
- Security Labeling Service R2 (if cosponsor dates are added)
- Discussion topics:
- SGB recommendations regarding ballot level change requests - Calvin
- Add to future agenda
- Recommendation from SGB regarding process changes which affect standards development - Paul
- Note: SGB does not see a need for changes to the Project Services "Introducing New Processes" document
- Remove from list
- Note: SGB does not see a need for changes to the Project Services "Introducing New Processes" document
- SGB recommendations regarding ballot level change requests - Calvin
- Open Issues List/Parking Lot
- WGs not meeting at international meetings/out of cycle meeting scheduling
- SGB recommendation on adding a category of ballot disposition for items under consideration for the future
- Ken to address STU extensions, appropriate ballot reconciliation dispositions, and standards expiration/extension/withdrawal process at the co-chair dinner
- Wayne and Freida working on co-chair handbook update process
- Wayne will touch on it at the WGM
- FHIR Ballot level issues - waiting for written explanation from Grahame
- Grahame hopes to get to it this week
- Adjourned at 11:38 AM Eastern
Next Steps
Actions (Include Owner, Action Item, and due date)
| |||
Next Meeting/Preliminary Agenda Items |
© 2017 Health Level Seven® International. All rights reserved.