Difference between revisions of "T3F Action item list"
Jump to navigation
Jump to search
WoodyBeeler (talk | contribs) |
WoodyBeeler (talk | contribs) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | + | #Assemble a '''one page''' document listing the '''[[Six Core Architecture Features|six core features]]''' of the HL7 Architecture '''(ALL, underway)''' | |
− | + | #:'''Step:'''[''Starting with the Current "HDF", and the SI Documents identify the '''SIX''' (not more) features/objectives of the HL7 "Architecture" (e.g. "reuse common models"''] | |
− | + | #Classify and propose actions on items in document trove | |
− | + | #:'''Step:'''[''Work through the SI documents to identify issues and strategies that prevent achieving these objectives, and/or facilitate achieving them''] | |
− | + | ##Determine the documents to be reviewed '''(McCay)''' | |
− | + | ##Assign (or accept) responsibility for each | |
− | + | ##Define a format for listing issues discovered | |
− | + | ##Do the reviews | |
− | + | ## Assemble responses to the collection | |
− | + | #Map the results of (1) and (2) to the elements of the Project Life Cycle process that address or affect each | |
− | + | #:'''Step:'''[''Outline a standards development process that can realize deliverables that meet these objectives. (Definition of what is a "Projects" belongs here too.)''] | |
− | + | #'''Step:'''[''Identify principles under which Committees are formed and differentiated, how they relate to the T3F/TD structure, including resolution process for inter-committee conflicts.''] | |
− | + | #Create a white paper for review by Board and TSC about this | |
− | + | #:'''Step:'''[''Create a white paper for review by Board and TSC about this''] | |
− | |||
− | |||
#Assemble agenda topic list | #Assemble agenda topic list |
Latest revision as of 18:34, 16 January 2007
- Assemble a one page document listing the six core features of the HL7 Architecture (ALL, underway)
- Step:[Starting with the Current "HDF", and the SI Documents identify the SIX (not more) features/objectives of the HL7 "Architecture" (e.g. "reuse common models"]
- Classify and propose actions on items in document trove
- Step:[Work through the SI documents to identify issues and strategies that prevent achieving these objectives, and/or facilitate achieving them]
- Determine the documents to be reviewed (McCay)
- Assign (or accept) responsibility for each
- Define a format for listing issues discovered
- Do the reviews
- Assemble responses to the collection
- Map the results of (1) and (2) to the elements of the Project Life Cycle process that address or affect each
- Step:[Outline a standards development process that can realize deliverables that meet these objectives. (Definition of what is a "Projects" belongs here too.)]
- Step:[Identify principles under which Committees are formed and differentiated, how they relate to the T3F/TD structure, including resolution process for inter-committee conflicts.]
- Create a white paper for review by Board and TSC about this
- Step:[Create a white paper for review by Board and TSC about this]
- Assemble agenda topic list