Difference between revisions of "T3F Action item list"
Jump to navigation
Jump to search
WoodyBeeler (talk | contribs) |
WoodyBeeler (talk | contribs) |
||
Line 2: | Line 2: | ||
##Assemble a '''one page''' document listing the '''six core features''' of the HL7 Architecture | ##Assemble a '''one page''' document listing the '''six core features''' of the HL7 Architecture | ||
##:'''Was:'''[''Starting with the Current "HDF", and the SI Documents identify the '''SIX''' (not more) features/objectives of the HL7 "Architecture" (e.g. "reuse common models"''] | ##:'''Was:'''[''Starting with the Current "HDF", and the SI Documents identify the '''SIX''' (not more) features/objectives of the HL7 "Architecture" (e.g. "reuse common models"''] | ||
− | ##''Work through the SI documents to identify issues and strategies that prevent achieving these objectives, and/or facilitate achieving them'' | + | ##Classify and propose actions on items in document trove |
− | ##''Outline a standards development process that can realize deliverables that meet these objectives. (Definition of what is a "Projects" belongs here too.)'' | + | ##:'''Was:'''[''Work through the SI documents to identify issues and strategies that prevent achieving these objectives, and/or facilitate achieving them''] |
− | ##''Identify principles under which Committees are formed and differentiated, how they relate to the T3F/TD structure, including resolution process for inter-committee conflicts.'' | + | ###Determine the documents to be reviewed |
− | ##''Create a white paper for review by Board and TSC about this'' | + | ###Assign (or accept) responsibility for each |
− | + | ###Define a format for listing issues discovered | |
+ | ###Do the reviews | ||
+ | ### Assemble responses to the collection | ||
+ | ##Map the results of (1) and (2) to the elements of the Project Life Cycle process that address or affect each | ||
+ | ##:'''Was:'''[''Outline a standards development process that can realize deliverables that meet these objectives. (Definition of what is a "Projects" belongs here too.)''] | ||
+ | ##'''Was:'''[''Identify principles under which Committees are formed and differentiated, how they relate to the T3F/TD structure, including resolution process for inter-committee conflicts.''] | ||
+ | ##Create a white paper for review by Board and TSC about this | ||
+ | ##:'''Was:'''[''Create a white paper for review by Board and TSC about this''] | ||
#Assemble agenda topic list | #Assemble agenda topic list |
Revision as of 22:56, 12 January 2007
- Refine the steps from minutes of 20070104 into action items
- Assemble a one page document listing the six core features of the HL7 Architecture
- Was:[Starting with the Current "HDF", and the SI Documents identify the SIX (not more) features/objectives of the HL7 "Architecture" (e.g. "reuse common models"]
- Classify and propose actions on items in document trove
- Was:[Work through the SI documents to identify issues and strategies that prevent achieving these objectives, and/or facilitate achieving them]
- Determine the documents to be reviewed
- Assign (or accept) responsibility for each
- Define a format for listing issues discovered
- Do the reviews
- Assemble responses to the collection
- Map the results of (1) and (2) to the elements of the Project Life Cycle process that address or affect each
- Was:[Outline a standards development process that can realize deliverables that meet these objectives. (Definition of what is a "Projects" belongs here too.)]
- Was:[Identify principles under which Committees are formed and differentiated, how they relate to the T3F/TD structure, including resolution process for inter-committee conflicts.]
- Create a white paper for review by Board and TSC about this
- Was:[Create a white paper for review by Board and TSC about this]
- Assemble a one page document listing the six core features of the HL7 Architecture
- Assemble agenda topic list