Difference between revisions of "TSC Action item list"
Jump to navigation
Jump to search
Line 3: | Line 3: | ||
['''''This is a place for TSC members to list or amend items that should be completed in the short term.'''''] | ['''''This is a place for TSC members to list or amend items that should be completed in the short term.'''''] | ||
− | |||
*From 2009JanWGM ACTION ITEM: Propose ballot-level coordination for ISO/JIC work - [http://newgforge.hl7.nscee.edu/pm/task.php?func=detailtask&project_task_id=199&group_id=52&group_project_id=103 Woody] and [http://newgforge.hl7.nscee.edu/pm/task.php?func=detailtask&project_task_id=198&group_id=52&group_project_id=103 Austin] to draft a proposal. Attached to [http://newgforge.hl7.nscee.edu/tracker/index.php?func=detail&aid=332&group_id=52&atid=313 Tracker #332] | *From 2009JanWGM ACTION ITEM: Propose ballot-level coordination for ISO/JIC work - [http://newgforge.hl7.nscee.edu/pm/task.php?func=detailtask&project_task_id=199&group_id=52&group_project_id=103 Woody] and [http://newgforge.hl7.nscee.edu/pm/task.php?func=detailtask&project_task_id=198&group_id=52&group_project_id=103 Austin] to draft a proposal. Attached to [http://newgforge.hl7.nscee.edu/tracker/index.php?func=detail&aid=332&group_id=52&atid=313 Tracker #332] | ||
*From 20090223CC: ACTION ITEM: Helen to draft revisions to Vendor demonstrations policy for recommendation to Board. | *From 20090223CC: ACTION ITEM: Helen to draft revisions to Vendor demonstrations policy for recommendation to Board. | ||
− | *From 20090330CC:Lynn to document TSC preference on dealing with SD not represented at WGM, that an ad-hoc member be approved for a short duration, as nominated by the selection of the Steering Division as a 'designated chair' for that WGM | + | *From 20090330CC:Lynn to document TSC preference on dealing with SD not represented at WGM, that an ad-hoc member be approved for a short duration, as nominated by the selection of the Steering Division as a 'designated chair' for that WGM. |
− | |||
− | |||
*From [[2009-06-08_TSC_Call_Minutes]]: TSC will be deferring the RASCI chart concept to Project Services for their consideration | *From [[2009-06-08_TSC_Call_Minutes]]: TSC will be deferring the RASCI chart concept to Project Services for their consideration | ||
+ | *From [[2009-07-20_TSC_Call_Minutes]]: DAM Medical Records Composite Privacy – ACTION ITEM- ARB to review and discussion. How would one trace conformance back to this document. | ||
+ | *From [[2009-07-20_TSC_Call_Minutes]]:HL7 Version 3 Standard: XML Implementation Technology Specification, Release 2 - need to clarify on whether this covers both datatypes and structures. ACTION ITEM: Woody will check with Grahame Grieve and then update the TSC |
Revision as of 15:43, 23 July 2009
Click for TSC Action Item List
back to TSC Minutes and Agendas
[This is a place for TSC members to list or amend items that should be completed in the short term.]
- From 2009JanWGM ACTION ITEM: Propose ballot-level coordination for ISO/JIC work - Woody and Austin to draft a proposal. Attached to Tracker #332
- From 20090223CC: ACTION ITEM: Helen to draft revisions to Vendor demonstrations policy for recommendation to Board.
- From 20090330CC:Lynn to document TSC preference on dealing with SD not represented at WGM, that an ad-hoc member be approved for a short duration, as nominated by the selection of the Steering Division as a 'designated chair' for that WGM.
- From 2009-06-08_TSC_Call_Minutes: TSC will be deferring the RASCI chart concept to Project Services for their consideration
- From 2009-07-20_TSC_Call_Minutes: DAM Medical Records Composite Privacy – ACTION ITEM- ARB to review and discussion. How would one trace conformance back to this document.
- From 2009-07-20_TSC_Call_Minutes:HL7 Version 3 Standard: XML Implementation Technology Specification, Release 2 - need to clarify on whether this covers both datatypes and structures. ACTION ITEM: Woody will check with Grahame Grieve and then update the TSC