Difference between revisions of "T3F Cologne Deliverable"

From HL7 TSC
Jump to navigation Jump to search
(New page: =Report to HL7 Board from Transitional Technical Task Force= ==Introduction== The following documents the recommendations of the Technical Transition Task Force (T3F) with regards to comp...)
 
Line 9: Line 9:
 
**Life-cycle project team
 
**Life-cycle project team
 
**PIC
 
**PIC
* Considerations of the core mission of HL7 as included in the SI documenta
+
* Considerations of the core mission of HL7 as included in the SI documents
==Mission==
+
==Mission (woody & Charlie)==
==Responsibilities==
+
==Responsibilities (Virginia)==
==Composition==
+
==Composition (Woody - done)==
==Relationships==
+
==Relationships (Woody - done)==
==Tactical Plan to Establish==
+
==Tactical Plan to Establish (Craig) ==

Revision as of 16:25, 10 April 2007

Report to HL7 Board from Transitional Technical Task Force

Introduction

The following documents the recommendations of the Technical Transition Task Force (T3F) with regards to completing the definition of the Technical Directorate and proceeding to establish same. It reflects:

  • efforts of T3F since January 2007
  • Source documents from
    • Strategic Initiative
    • ORC
    • Life-cycle project team
    • PIC
  • Considerations of the core mission of HL7 as included in the SI documents

Mission (woody & Charlie)

Responsibilities (Virginia)

Composition (Woody - done)

Relationships (Woody - done)

Tactical Plan to Establish (Craig)