=Report to HL7 Board from Transitional Technical Task Force=
+
<big>'''HL7 Technical Directorate - It's Mission, Responsibilities, Composition and Formation'''</big>
  
 
==Introduction==
 
==Introduction==
The following documents the recommendations of the Technical Transition Task Force (T3F) with regards to completing the definition of the Technical Directorate and proceeding to establish same.
+
This document provides specific recommendations from the Technical Transition Task Force (T3F) to the HL7 Board.  It includes a complete definition of the Technical Directorate (TD), its composition and relationships, and proposes a plan to elect and establish the Technical Directorate to allow its first meeting at the September 2007 Working Group Meeting in Atlanta.
  
The T3F began work in earnest at the Winter Working Group Meeting in January 2007.  The T3F met three times face-to-face at that meeting and have held a conference call every week but one since then.  The group used a number of sources in its efforts -- Strategic Initiative documents, ORC reports, work from the project life-cycle team, etc.  In addition, the group has benefited greatly by having consistent attendance at its meetings from the TSC (Quinn and Hammond), the ARB (Walker) and the project life-cycle group (McCaslin), and wishes to thank each of these groups for their support.
+
===Background===
 +
The T3F began work in earnest at the Winter Working Group Meeting in January 2007.  The T3F met three times face-to-face at that meeting and has held a conference call every week but one since then.  The group used a number of sources in its efforts -- Strategic Initiative documents, ORC reports, work from the project life-cycle team, etc.  In addition, the group has benefited greatly by having consistent attendance at its meetings from the TSC (Quinn and Hammond), the ARB (Walker) and the project life-cycle group (McCaslin), and wishes to thank each of these groups for their support.
  
 
Early on in its efforts, the T3F determined that its primary initial task was to provide a complete definition of the roles and composition of the Technical Directorate that could be adopted at the May Working Group Meeting.  This would afford the opportunity to review these recommendations in Cologne and allow the Technical Directorate to be formed as rapidly as possible thereafter.
 
Early on in its efforts, the T3F determined that its primary initial task was to provide a complete definition of the roles and composition of the Technical Directorate that could be adopted at the May Working Group Meeting.  This would afford the opportunity to review these recommendations in Cologne and allow the Technical Directorate to be formed as rapidly as possible thereafter.
 +
 +
===Status of this Document===
 +
The T3F regards this document as a draft of a "contract" between the Technical Directorate and the HL7 Board of Directors.  It should be a "living" document that evolves as the TD evolves.  It should not be replaced by a "Charter" for the Technical Directorate, but rather the Charter should be drawn from this document and evolve as this document and the TD itself evolves.
  
 
==Mission==
 
==Mission==
=== Mission Statement (Woody)===
+
=== Mission Statement ===
 
The HL7 Technical Directorate oversees and coordinates the technical effort contributed by the HL7 volunteers who make up the HL7 Working Group.  Its mission is to assure that the efforts of the Working Group are focused on the overall HL7 mission established by the HL7 Board.   
 
The HL7 Technical Directorate oversees and coordinates the technical effort contributed by the HL7 volunteers who make up the HL7 Working Group.  Its mission is to assure that the efforts of the Working Group are focused on the overall HL7 mission established by the HL7 Board.   
  
Line 21: Line 25:
 
* assure that HL7 standards are developed on a solid architectural foundation that assures consistency and interoperability.
 
* assure that HL7 standards are developed on a solid architectural foundation that assures consistency and interoperability.
  
The Technical Directorate criteria for success must center around three concepts -- assuring the continuity and vitality of the HL7 volunteer-based Working Group; maintaining coherent inter-operable standards while minimizing duplication of effort; and providing sound consensus-based standards that meet the needs and schedule requirements of HL7's clients.
 
  
=== Success Criteria (Charlie)===
+
=== Success Criteria ===
 +
The Technical Directorate success criteria must focus on three core objectives -- assuring the continuity and vitality of the HL7 volunteer-based Working Group; maintaining coherent inter-operable standards while minimizing duplication of effort; and providing sound consensus-based standards that meet the needs and schedule requirements of HL7's clients.
  
 
The Technical Directorate will be successful if HL7 members can easily find answers to the following sorts of questions:
 
The Technical Directorate will be successful if HL7 members can easily find answers to the following sorts of questions:
Line 29: Line 33:
 
*What is HL7 doing in the area of xxx? Where xxx is an area of interest to a member
 
*What is HL7 doing in the area of xxx? Where xxx is an area of interest to a member
 
** what publications exist?
 
** what publications exist?
** what active projects / workitems are there?
+
** what active projects / work-items are there?
 
** what committee is responsible for that area?
 
** what committee is responsible for that area?
  
Line 38: Line 42:
  
 
*How do I know what to do at a WGM?
 
*How do I know what to do at a WGM?
 
  
 
*What is the status of a particular HL7 specification or document?
 
*What is the status of a particular HL7 specification or document?
Line 50: Line 53:
 
Defining success criteria in this way shows how the TD is mandated to expose the information that is needed for the board and membership to be able to plan effectively and to support the promotion of the consensus-based products.  It also underpins the importance of work reuse, and only having as many projects and committees as are needed.  Finally it defines success in a way that reflects the questions that led to the formation of the TD.
 
Defining success criteria in this way shows how the TD is mandated to expose the information that is needed for the board and membership to be able to plan effectively and to support the promotion of the consensus-based products.  It also underpins the importance of work reuse, and only having as many projects and committees as are needed.  Finally it defines success in a way that reflects the questions that led to the formation of the TD.
  
==Responsibilities (Virginia)==
+
==Responsibilities ==
(draft based on editing of Charlie's/and Woody;'s edit of the strat initiatives.  also based on Woody's mission.  Also includes pulling forward TSC responsibilities from Bylaws and Policies and Procedures.)
+
This section is based on Strategic Initiative documents, on-going revision by the T3F, the Mission statement above, and consideration of the stated responsibilities of the Technical Steering Committee as documented in HL7's Bylaws and the Policies and Procedures Manual. These responsibilities are shared, as noted below, with the four Steering Divisions (SD) (sub-groups of committees) that report to the Technical Directorate.
  
===Oversees execution of standards development ===
+
===Oversees Execution of Standards Development ===
:''Assures that the efforts of the Working Group (WG) is effectively focused on accomplishing the product and services strategy set forth by the board.
+
:''Assures that the efforts of the Working Group (WG) are effectively focused on accomplishing the product and services strategy set forth by the Board.''
 
* Participates in development of an HL7 Product and Services strategy for adoption by the HL7 Board
 
* Participates in development of an HL7 Product and Services strategy for adoption by the HL7 Board
* Oversees the TD sub-groups in the establishment and management of projects and project teams to accomplish the product and services strategy set by the Board. To that end, it works through the sub-groups to:   
+
* Oversees the TD Steering Divisions (SD) in the establishment and management of projects and project teams to accomplish the product and services strategy set by the Board. To that end, it works through the SDs to:   
 
** Approve new work groups based on priority projects
 
** Approve new work groups based on priority projects
 
** Dissolve work groups no longer required based on the HL7 Products and Services strategy
 
** Dissolve work groups no longer required based on the HL7 Products and Services strategy
 
** Works with sub-groups to align and prioritize projects in accordance with the products and services strategy
 
** Works with sub-groups to align and prioritize projects in accordance with the products and services strategy
 
** Working with the subgroups, helps to ensure the availability of project resources
 
** Working with the subgroups, helps to ensure the availability of project resources
*** helps with resource provision (people, rooms, tools, etc)  
+
*** helps with resource provision or recruitment (people, rooms, tools, etc)  
 
*** includes ensuring the continuity, vitality, and effectiveness of the HL7 volunteer-based Working Group  
 
*** includes ensuring the continuity, vitality, and effectiveness of the HL7 volunteer-based Working Group  
 
* Approve, monitor, and perhaps intervene in overall product development
 
* Approve, monitor, and perhaps intervene in overall product development
**Works with the sub-groups and the PMO to oversee the tracking of projects to meet HL7 objectives.  The sub-groups will function to assure that they or the committees under them set milestones, monitor and ensure that quality assurance has been done
+
**Works with the SDs and the PMO to oversee the tracking of projects to meet HL7 objectives.  The Steering Divisions will function to assure that they or the committees under them set milestones, monitor and ensure that quality assurance has been done
 
* Performs top-level review and authorizations as specified in the formal development process:
 
* Performs top-level review and authorizations as specified in the formal development process:
** Working with the subgroups, reviews, approves, and prioritizes requests for new projects.   
+
** Working with the SDs, reviews, approves, and prioritizes requests for new projects.   
** Working with the subgroups, recommends project probation or dissolution to the Board  
+
** Working with the SDs, recommends project probation or dissolution to the Board  
** Sets remit for ARB and project office and serves as escalation point for issues not resolved at commitee or subgroup level.
+
** Sets remit for ARB and Project Management Office and serves as escalation point for issues not resolved at the committee or SD level.
 
** ensures that quality checks in the project development process are satisfied.
 
** ensures that quality checks in the project development process are satisfied.
 
**Reviews and approves requests from Technical Committees to initiate a ballot and serves as escalation point for ballot response handling.
 
**Reviews and approves requests from Technical Committees to initiate a ballot and serves as escalation point for ballot response handling.
Line 75: Line 78:
 
:''Establishes (or reviews) the Technical Architecture, the development methodologies, and the work processes to be used by the WG in developing HL7 consensus-based standards specifications''
 
:''Establishes (or reviews) the Technical Architecture, the development methodologies, and the work processes to be used by the WG in developing HL7 consensus-based standards specifications''
 
* has overall responsibility for the development and adherence to an HL7 Technical Architecture and the development, maintenance, and execution of an HL7 standards development process
 
* has overall responsibility for the development and adherence to an HL7 Technical Architecture and the development, maintenance, and execution of an HL7 standards development process
** working through sub-groups, makes sure that architecture and process is developed, communciated (documented, etc), maintained and enhanced.
+
** working through SDs, makes sure that architecture and process is developed, communicated (documented, etc), maintained and enhanced.
 
*** through Committees such as MnM, Vocabulary, and PIC as well as the ARB.
 
*** through Committees such as MnM, Vocabulary, and PIC as well as the ARB.
 
* defines and manages international harmonization mechanism
 
* defines and manages international harmonization mechanism
* ensures that the balloting of any HL7 specification, or portion thereof, is carried out in accordance with HL7
+
* ensures that the balloting of any HL7 specification, or portion thereof, is carried out in accordance with HL7 Bylaws and ANSI rules.
Bylaws and ANSI rules.
 
  
===Oversees the technical operations of the Working Group ===   
+
===Oversees the Technical Operations of the Working Group ===   
 
:''Assures that the WG works smoothly together and covers the work scope in a consistent manner.''
 
:''Assures that the WG works smoothly together and covers the work scope in a consistent manner.''
 
* Ensures that Working Group policies and procedures and bylaws are followed
 
* Ensures that Working Group policies and procedures and bylaws are followed
** With the subgroups, oversees execution of procedures for committee creation, dissolution, and co-chair elections.
+
** With the SDs, oversees execution of procedures for committee creation, dissolution, and co-chair elections.
 
** ensures that meetings and calls are carried out according to policy
 
** ensures that meetings and calls are carried out according to policy
 
* Oversees continuous quality process
 
* Oversees continuous quality process
* Works through sub-groups to identify cross-domain and cross-function gaps, overlaps, discrepancies, potentials for collaboration, and conflicts and recommends resolution
+
* Works through SDs to identify cross-domain and cross-function gaps, overlaps, discrepancies, potentials for collaboration, and conflicts and recommends resolution
 
* responsible for any official interpretation of the HL7 standards.
 
* responsible for any official interpretation of the HL7 standards.
 
** resolves conflicts within the Working Group and prioritizes resources according to project priority (example, room balancing at WGMs)
 
** resolves conflicts within the Working Group and prioritizes resources according to project priority (example, room balancing at WGMs)
Line 100: Line 102:
 
* responsible for any official interpretation of the HL7 standards.
 
* responsible for any official interpretation of the HL7 standards.
  
==Composition (Woody - based on minutes)==
+
==Composition ==
The T3F spent several meetings deliberating the appropriate composition and style of functioning for the Technical Directorate.  The section reflects the results of those discussions, and addresses four topics:
+
The T3F spent several meetings deliberating the appropriate composition and style of functioning for the Technical Directorate.  This section reflects the results of those discussions, and addresses three topics:
*[[#HL7 Committee Structure|HL7 Committee Structure - Board to TD to Committees & SIGs]]
+
*[[#HL7 Committee Structure|HL7 Committee Structure - Board-to-TD-to-Committees & SIGs]]
*[[#Creation of Committees and Projects|Creation of Committees and Projects - Role of TD]]
+
*[[#Composition and Functioning of TD|Composition and Functioning of TD]]
*[[#Composition and Functioning of TD|*Composition and Functioning of TD]]
 
 
*[[#Relationship of TD to CTO|Relationship of TD to CTO]]
 
*[[#Relationship of TD to CTO|Relationship of TD to CTO]]
  
 
The order of these topics is arbitrary and the discussion will, of needs, include both forward and backward references.  The T3F did not attack any of these topics ''de novo''.  In every circumstance, we built on the guidance provided by earlier Strategic Initiative, ORC and Transition documents.  We sought to recognize the principles and objectives that underlay each of those documents and to maintain those principles and objectives while improving, we hope, the resulting framework.
 
The order of these topics is arbitrary and the discussion will, of needs, include both forward and backward references.  The T3F did not attack any of these topics ''de novo''.  In every circumstance, we built on the guidance provided by earlier Strategic Initiative, ORC and Transition documents.  We sought to recognize the principles and objectives that underlay each of those documents and to maintain those principles and objectives while improving, we hope, the resulting framework.
 
===HL7 Committee Structure===
 
===HL7 Committee Structure===
The HL7 Working Group is made up of a group of volunteer-driven Committees and SIGs that have been highly successful to both their own and HL7's credit and benefit.  Simultaneously, however, as recognized in the Strategic Initiative, as the numbers of groups expanded, their breadth, number and diversity posed major challenges for coordination and collaboration between them. Discussion and debate on these issues in the forum of the Technical Steering Committee (TSC) became difficult and unproductive in recent years, and failures in coordination have begun to threaten the effectiveness of HL7.
+
The HL7 Working Group is made up of a number of volunteer-driven Committees and SIGs that have been highly successful, to both their own and to HL7's credit and benefit.  Simultaneously, however, as the numbers of groups expanded, their breadth, number and diversity posed major challenges for coordination and collaboration between them. Discussion and debate on such issues in the forum of the Technical Steering Committee (TSC) became difficult and unproductive in recent years, and failures in coordination have begun to threaten the effectiveness of HL7.
  
 
The challenge of the Strategic Initiative was to address these coordination and collaboration issues while retaining the essential vitality of a Working Group made up of and driven by the best, brightest and most dedicated medical informaticists and information scientists available.  The essence of the Strategic Initiative proposal was to revise the leadership of the Working Group from a single TSC with representation from each Committee and SIG to a two-level hierarchy of a Technical Directorate (TD) and a small set of Steering Divisions (SD, a new term).  This was the foundation from which the T3F developed this proposal.
 
The challenge of the Strategic Initiative was to address these coordination and collaboration issues while retaining the essential vitality of a Working Group made up of and driven by the best, brightest and most dedicated medical informaticists and information scientists available.  The essence of the Strategic Initiative proposal was to revise the leadership of the Working Group from a single TSC with representation from each Committee and SIG to a two-level hierarchy of a Technical Directorate (TD) and a small set of Steering Divisions (SD, a new term).  This was the foundation from which the T3F developed this proposal.
  
===Creation of Committees and Projects===
+
The starting point for this discussion was a previously developed Strategic Initiative document titled //"Creation of the Transitional Technical Task Force (T3F)"''.  The final proposal can be summarized with the "nested list" of bullet points at the end of this paragraph.  The remainder of the topics in this '''"HL7 Committee Structure"''' section discuss the rationale and principles behind this proposal, specific responsibilities of the TDs and SDs, and the definition and committees in each Steering Division.  The proposed hierarchy is:
 +
*'''HL7 Board'''
 +
**'''Technical Directorate''' -
 +
**: 6 elected voting representatives, 4 appointed voting members
 +
**: TD-elected Chair
 +
***'''Foundation & Technologies Steering Division'''
 +
***: 9 existing TCs and SIGs
 +
***:2 Elected SD Co-Chairs plus Co-Chairs of TCs & SIGs in SD
 +
***'''Structure & Semantic Design Steering Division'''
 +
***: 10 existing TCs & SIGs
 +
***:2 Elected SD Co-Chairs plus Co-Chairs of TCs & SIGs in SD
 +
***'''Domain Experts Steering Division'''
 +
***: 17 existing TCs and SIGs
 +
***:2 Elected SD Co-Chairs plus Co-Chairs of TCs & SIGs in SD
 +
***'''Technical & Support Services Steering Division'''
 +
***: 9 TD-appointed Committees (7 formerly Board-appointed, 2 new)
 +
***:2 Elected SD Co-Chairs plus Co-Chairs of Committees in SD
 +
====Organizing Principle====
 +
During its deliberations, the T3F made the following observations:
 +
*HL7 members join committees because of their personal (or corporate) interest in the '''subject matter content''' of the committee, regardless of whether their interest stems from academic, development or implementation activities.
 +
*The original break-out of committees (provided in the SI document) aggregates the committees by commonality of '''what they produce''' and the relationship of that work product to the other Working Group committees.  The T3F found this is to be a sound approach.
 +
*One of the key activities of the TD will be to identify and reduce those places where committees are "stepping on each others toes" or "reinventing the wheel."  Coordination within the proposed Steering Divisions will facilitate this activity.
 +
*The existing relationship between TCs and SIGs may need to be "re-thought", because the Steering Division strategy will clearly place a number of SIGS in a Steering Division that is different from that to which their current "parent TC" is assigned. 
 +
*It will be important to not disrupt existing collaboration while establishing this organization, and it is clear that many topics may best be managed, in "matrix fashion" between committees in two or three Steering Divisions.
 +
*A number of committees clearly produce products that fit in two or even three of the Steering Divisions.  This may be effective, or it lead the TD to consider whether to recommend these groups be split.
 +
 
 +
Ultimately, the T3F recognized that the organization as proposed is imperfect, not by design, but by the nature of the HL7 Committees and SIGs that do not permit simplistic classifications.  Regardless of what is proposed, someone will question the result.  The key element however is to establish the three-tier structure first, gain the advantages of focusing critical organizational thinking into smaller meetings so that the work can get done, and then evolve the structure over time.
 +
 
 +
====Technical Directorate Role====
 +
The technical Directorate (TD) will be the focal point for decision making, harmonization, issue resolution, project and committee creation and dissolution within the Working Group.  The TD will be a representative consensus body of elected and appointed members.  (Specifics are in a [[#Composition and Functioning of TD| later section]] of this document.) 
 +
 
 +
The T3F notes that however the Steering Divisions are defined, and whatever additional relationships may exist between committees, the '''Technical Directorate will not be successful in meeting HL7's objectives unless it can assure the harmonization of content and design across HL7 standards.''' 
 +
 
 +
As a consequence, the notion of '''required harmonization and shared stewardship''' must clearly be a fundamental principle of the TD, of the Steering Divisions, and of each TC and SIG. Overall, it is the TD that must define and manage the processes that bring about such harmonization and then must '''delegate similar responsibilities to the Steering Divisions''' and to the committees.
 +
 
 +
Further, the TD must have a central role in project management.  It is assumed that the project life cycle strategy being developed will be a fundamental process for all HL7 work.  The TD will incur responsibilities:
 +
*to approve projects (after they are vetted in the Steering Divisions)
 +
*to initiate projects to carry out its mission (such as harmonization)
 +
*to oversee the functions of the Project Management Office, and
 +
*to maintain the project life cycle definition
 +
 
 +
Certainly, several of these responsibilities will need to be delegated in whole or in part to the Steering Divisions or to specific committees.
 +
 
 +
====Steering Division Definition and Composition====
 +
In keeping with the original Strategic Initiative document, T3F proposes to divide the existing Technical Committees, Special Interest Groups and Board-appointed Committees into four functional groups called Steering Divisions (SD).  Each Steering Division will be a committee in its own right made up of the Co-Chairs of the groups in the SD.  It is expected that each SD will meet face-to-face during each Working Group Meeting and will conduct conference calls, as needed.  A partial list of specific SD responsibilities includes:
 +
*nominate and elect the representative from that SD to the TD, who will also serve as a Co-Chair of the SD
 +
*nominate and elect an Alternate representative to the TD, who will also serve as a Co-Chair of the SD
 +
*review proposed projects and make recommendations for action to the TD
 +
*monitor project status within the SD
 +
*review proposals to create, modify or dissolve Committees and SIGs in their SD and make recommendations for action on same to the TD
 +
*identify coordination issues within and between the committees of the SD and resolve these or recommend resolutions to the TD
 +
*identify coordination issues between SDs and their committees and recommend resolutions to the TD
 +
*undertake harmonization tasks as delegated by the TD
 +
 
 +
=====Foundation & Technologies Steering Division=====
 +
Committees and projects in this space focus on providing the fundamental tools and building blocks that other Committees should use to build the standards, and upon the technology infrastructure that implementers of HL7 standards must manage. 
 +
 
 +
*Conformance
 +
*Infrastructure & Messaging
 +
*Implementable Technology Specifications (ITS)
 +
*Java
 +
*Modeling & Methodology
 +
*Security
 +
*Service Oriented Architecture (SOA)
 +
*Templates
 +
*Vocabulary
 +
 
 +
*'''Related multi-committee projects:'''
 +
**Dynamic Model
 +
**Harmonization
 +
**HL7 TermInfo
 +
 
 +
=====Structure & Semantic Design Steering Division=====
 +
Committees and project in this space focus on creation of basic patterns and common messages that could exist on their own, but are mostly used by others. 
 +
 
 +
*Clinical Context Object Workgroup (CCOW)
 +
*Clinical Decision Support
 +
*Electronic Health Record (EHR)
 +
*Financial Management
 +
*Genomics
 +
*Orders & Observations
 +
*Patient Administration
 +
*Personnel Management
 +
*Scheduling & Logistics
 +
*Structured Documents
 +
 
 +
*'''Related multi-committee projects:'''
 +
**Clinical Statements
 +
**Common Message Element Types (CMETs)
 +
 
 +
=====Domain Experts Steering Division=====
 +
Committees and projects in this space focus on creation of messages, services, documents using many of the common structures in place, yet expanding it in key areas as well.
 +
 
 +
*Anatomic Pathology
 +
*Anesthesiology
 +
*Attachments
 +
*Cardiology
 +
*Clinical Guidelines
 +
*Community Based Health Services
 +
*Emergency Care
 +
*Government Projects
 +
*Health Care Devices
 +
*Imaging Integration
 +
*Laboratory
 +
*Patient Care
 +
*Patient Safety
 +
*Pediatrics Data Standards
 +
*Public Health Emergency Response (PHER)
 +
*Pharmacy
 +
*Regulated Clinical Research Information Management (RCRIM)
 +
 
 +
=====Technical & Support Services Steering Division=====
 +
These committees are currently Board-appointed.  In future, the T3F recommends that they be appointed by the TD, subject to Board approval.  The committees will elect their own Co-chairs, subject to TD approval. For the most part, these groups are functioning on volunteer effort, although each has strong support from a designated staff liaison.  The primary feature of these committees is that their projects and products provide direct support to the Technical Committees and SIGs of the Working Group and thereby enable the Working Group to function efficiently.
 +
 
 +
*Education
 +
*Electronic Services
 +
*Implementation
 +
*Marketing Committee <small>(''T3F needs consultation during the Cologne meeting with the Board and the Marketing Committee to ascertain whether inclusion of the Marketing Committee in this Steering Division is appropriate'')</small>
 +
*Process Improvement Committee (PIC)
 +
*Product Management Committee <small>(''T3F needs consultation during the Cologne meeting with the Product & Services Committee to ascertain whether inclusion of the Products and Services in this Steering Division is appropriate'')</small>
 +
*Project Services -- a new group that will take responsibility for the Project Life Cycle and will serve as the primary support for the PMO
 +
*Publishing
 +
*Tooling
 +
 
 +
=====Architecture Review Board=====
 +
The T3F believes the Architecture Review Board (ARB) fulfills a critical mission that must continue under the TD.  To that end, the T3F is proposing that the ARB become a TD-appointed committee that "stands alone" (independent of the Steering Divisions), and (see below) that the ARB have a voting representative on the TD.  Normally this representative will be the ARB Chair, but in the circumstance that the ARB Chair is already a member of the TD, a different ARB member will also be named to the TD.
 +
 
 
===Composition and Functioning of TD===
 
===Composition and Functioning of TD===
:::::<big>'''[http://www.hl7.org/documentcenter/public/wg/t3f%5Cgeneral/TD-Composition-20070424.gif Composition Chart for Technical Directorate]'''</big>
+
The makeup of the proposed Technical Directorate is illustrated in the following chart.  It includes ten voting members -- six elected representatives, two Board-appointed positions (the CTO and a liaison), and up to two TD-appointed positions.  It also has a non-voting secretary, to be assigned by HQ, and other staff support positions.  Specifics of the election processes, terms, etc. are in following sub-sections.
::::::'''Note:''' In the final this should be an in-line diagram
+
 
 +
[[Image:TDComp-v3.png|600px]]
 +
 
 +
====TD Membership====
 +
=====Steering Division Representatives=====
 +
Each of the four Steering Divisions (SD) will have an elected voting Representative on the TD.  Further, each SD will elect an Alternate Representative who is authorized to attend TD meetings '''and vote''' in the event the elected Representative from that SD is unable to participate.  This assures strong, consistent representation from each SD. In addition, the primary and alternate representatives will serve as Co-Chairs of the Steering Division itself.
 +
 
 +
The election process for SD Representatives is patterned after the process used in 2006 to elect the T3F representatives:
 +
# During a nomination period of at least two weeks, nominations for representatives of the SD will be accepted from the Co-Chairs of the Committees and SIGs that make up the SD.
 +
#The nominees are expected to be individuals who are either current Co-Chairs or a past Co-Chair of one of the Committees or SIGs in the SD. Effective service on the TD will require such experience. Nominees should be prepared to commit one to two hours a week to the TD, if elected.
 +
#HL7 staff will contact nominees to verify their willingness to stand for election, and to solicit a brief nominees "statement" for distribution. 
 +
#Individuals who are nominated to represent more than one SD will be asked to choose which nomination they wish to accept, and must reject the other(s).
 +
# An election period of at least three weeks will follow the nomination period.  The votes will be cast by the Committees and SIGs in the SD, using their normal decision-making practices.
 +
# Each Committee will cast votes for two of the candidates, and will be asked to state a preference for one of the two as their primary representative. (This preference will be tallied only if there is a need to resolve a tie.)
 +
# The candidate receiving the most votes will be named the Representative for that Steering Division. The candidate receiving the next higher number of votes will be named the Alternate Representative for that SD. Both the first and second place candidates will be named Co-Chairs of the SD.
 +
# Tie votes will be resolved by tallying the primary representative preferences for the candidates involved in the tie. If tally also results in a tie, the decision will be made by drawing lots, unless one of the candidates involved wishes to defer to the other(s).
 +
 
 +
=====Affiliate Representatives=====
 +
Two Affiliate Representatives will be elected by the "global" HL7 Affiliates -- the "traditional" affiliate organizations plus the US affiliate. (During the initial election, the HL7 Board is requested to designate a consensus body to nominate and cast votes for the US Affiliate.)
 +
 
 +
The election process for Affiliate Representatives is:
 +
# During a nomination period of at least three weeks, nominations for Affiliate Representatives will be accepted from the affiliate organizations.
 +
#Nominees should be prepared to commit one to two hours a week to the TD, if elected.
 +
#HL7 staff will contact nominees to verify their willingness to stand for election, and to solicit a brief nominees "statement" for distribution. 
 +
# An election period of at least three weeks will follow the nomination period.  The votes will be cast the Affiliates, using their normal decision-making practices.
 +
# Each Affiliate will vote for one or two of the candidates, depending upon how many Affiliate Representative positions are being filled in that election. (See discussion of member terms, below.)
 +
# The one or two candidate receiving the most votes will be named the Affiliate Representative(s), depending upon how many positions are being contested.
 +
# Tie votes will be resolved by drawing lots, unless one of the candidates involved wishes to defer to the other(s).
 +
=====Representative Election Timing=====
 +
In order to assure the greatest diversity and balance of the representatives on the Technical Directorate, the election of Representative Members will be phased, with the Election for Steering Division Representatives coming first, election of Affiliate Representatives second, and appointed TD members being designated last.
 +
 
 +
=====Board-Appointed Members=====
 +
The HL7 Board of Directors will appoint two members to the Technical Directorate
 +
# The '''Chief Technology Officer''' who will hold an ''ex officio'' voting position on the Technical Directorate.
 +
# A '''Board Liaison''' to the Technical Directorate, which is also a voting position.
 +
 
 +
=====Technical Directorate-Appointed Members=====
 +
The Technical Directorate will also appoint two members to the TD.  They are:
 +
# An '''Architecture Review Board (ARB) Representative.''' The T3F believes that the ARB fulfills a vital "independent" role in HL7 and should have voting representation on the TD.  Normally this representative will be the ARB Chair, but in the event that the Chair is already a TD member, or declines to serve, another ARB member will be selected.
 +
# An ''ad hoc'' '''TD-Appointed Member''' will be appointed on a variable term, not to exceed two-years, based on requirements or needs for balance or expertise that the Technical Directorate may from time to time identify.  This will be a voting position.
 +
 
 +
====Membership Terms====
 +
All normal membership terms on the Technical directorate shall be for two years, and will run on a calendar year basis. (See exceptions, below). There are no term limits, members may serve successive terms. 
 +
 
 +
Technical Directorate Elections should be held between the "Spring" and "Fall" Working Group Meetings each year, for candidates who will take office in January of the following year.  Each year, representatives for two of the four Steering Divisions will be elected as will one of the two Affiliate Representatives.  The appointed positions do not need to be staggered.
 +
=====Vacancies=====
 +
In the event that a member must resign from the Technical Directorate, the following procedures shall be used to fill vacancies:
 +
# For SD Representative positions, the Alternate Representative will be designated to serve the remainder of the vacated term, and the Alternate position will be re-filled in the next election cycle.
 +
# For Affiliate Representative positions, the Affiliate Council will be asked to name an individual to serve the remainder of the vacated term.
 +
# For the Board Liaison and the ARB Representative appointed positions, the appointing body will be asked to fill the vacated position as soon as possible.  The initial term of the replacement appointee will run until the second year-end following the appointment.
 +
=====Term Exceptions=====
 +
The following exceptions exist for the two-year, calendar-term rule above:
 +
# The CTO holds a standing ''ex officio'' membership, and therefore that TD term is dependent upon the term of service as CTO.
 +
# The term of ''ad hoc'' TD-Appointed Member will start when the TD makes the appointment and will end as determined by the TD, but cannot exceed two years.
 +
# During the summer of 2007, elections are planned for all six elective positions.  In order to establish staggered terms, two of the four elected SD representatives and one of the two elected Affiliate representatives will be designated to serve an initial "half-term."  This designation will be determined by drawing lots.
 +
# Because of the desire to have the TD start functioning in September 2007, the initial terms of the elected and appointed members will be extended by to cover the period from September 16, 2007 through to the nominal start of their terms on January 1, 2008.
 +
 
 +
====Election of Technical Directorate Chair====
 +
The Chair of the Technical Directorate will be elected by the Technical Directorate itself.  The Chair shall be selected from the voting members of the TD.  There will be no formal designation of a Co-Chair or Vice-Chair for the Technical Directorate.  The Technical Directorate can take whatever steps it wishes to assure coverage when the Chair is unavailable for a particular meeting, including, if it wishes, naming a standing Vice-Chair.
 +
 
 +
=====Term of Office=====
 +
The Chair will be elected for a two-year term of office, regardless of how long the candidate's membership term has left to run.
 +
 
 +
In the not unlikely event that the term of office runs longer than the Chair's term as a member, the TD may use its "TD-Appointed" position to extend the Chair's membership, or may petition the Board to temporarily expand the TD membership to allow the Chair to serve out the term of office. 
 +
 
 +
The Technical Directorate should seek to establish Chair terms of office that run on a calendar basis. As with regular terms, the term of the initial TD Chair shall be extended to cover the period from September 16, 2007 through December 31, 2007.
 +
 
 +
====Decision making and delegated decisions====
 +
By and large, decisions of the Technical Directorate will be made by vote.  There are however, tactical decisions, such as approvals for ballot, exceptions to ballot rules, etc. that have, in the past been assigned to the Technical Chair of HL7.  Such decisions should be delegated to the CTO or to the Chair of the Technical Directorate.  The TD will need to take early action to assign such delegation.
 +
 
 
===Relationship of TD to CTO===
 
===Relationship of TD to CTO===
 +
In the course of its deliberations, the T3F paid particular attention to the role of a Chief Technical Officer (CTO).  Ultimately, the T3F came to the conclusion that the relationship between the CTO and the TD should mirror the relationship between the CEO and the Board of Directors each acting assure the success of the other.
  
==Relationships (Woody - based on minutes)==
+
This decision was predicated on the assumption by the T3F that the TD would participate in the Board's selection of the CTO and that the following principles will be applied in making a CTO selection, in priority order:
Clearly, with the central role that the Technical Directorate will play within HL7 demands an understanding of the relationships of that group to the rest of HL7.  To this end, the T3F has created:  
+
# A proven consensus builder
:::::<big>'''[http://www.hl7.org/documentcenter/public/wg/t3f%5Cgeneral/TD-Relationships-20070424.gif Chart of TD Relationships within HL7]'''</big>
+
# Someone who '''knows''' and '''is known to''' the HL7 Working Group
:::::('''Note:''' This chart should appear "in-line" in the final report]
+
# Likely to have been a Co-Chair or “facilitator”, but not necessarily required
 +
# Have a strong understanding or working knowledge of the technology that HL7 defines and is dependent upon.
  
The Technical Directorate (TD) and its four Steering Divisions (SD) are shown in relationship to the Board of Directors (BOD) on the right.  The TD and SDs make up the "Working Group" of HL7, and the relationships between them are discussed in the earlier sections of this document.
+
In that context, the following motion was unanimously adopted by the T3F.
 +
====T3F Motion Unanimously Adopted April 3, 2007====
 +
WHEREAS:
 +
*The task of over-seeing and coordinating the technical activities of Health Level Seven requires the full-time attention of a knowledgeable professional, "Technical Officer";
 +
*The effective coordination of the various committees and SIGs requires a restructuring of these into three or four sub-groups reporting to an elected Technical Directorate;
 +
*The Technical Directorate must assure the continued involvement and support of HL7's '''Core Resource''' - volunteer-driven Working Group; and
 +
*The success of the Technical Directorate and the success of the "Technical Officer" are inextricably intertwined, and, further, are essential to HL7's success; 
 +
 
 +
THEREFORE, the Transitional Technical Task Force RESOLVES to recommend:
 +
* The "Technical Officer" should be recruited to work with and support the Technical Directorate in its responsibilities to oversee HL7's technical activities;
 +
* The "Technical Officer" should report to the CEO and the HL7 Board, and should be a voting member of the Technical Directorate.
 +
* The Chair of the Technical Directorate should be be elected by the voting members of the Technical Directorate, and selected from within the members of the Technical Directorate.
 +
* The Technical Directorate and its Chair should delegate responsibilities and operational decision-making (to be defined later) to the "Technical Officer."
 +
* The Technical Directorate should have a role in recruiting and evaluating the "Technical Officer."
 +
 
 +
== Relationships ==
 +
Clearly, the central role that the Technical Directorate will play within HL7 demands an understanding of the relationships of that group to the rest of HL7.  To this end, the T3F has created the following chart.
 +
 
 +
 
 +
[[Image:TDRelationships20070424.gif|600px]]
 +
 
 +
 
 +
The Technical Directorate (TD) and its four Steering Divisions (SD) are shown in relationship to the Board of Directors (BOD) on the right.  The TD and SDs make up the "Working Group" of HL7, and the relationships between them are discussed in earlier sections of this document.
  
 
The left hand portion represents the employees of HL7 and the Staff of AMG, and these relationships are shown for example here and are not considered further in this report.  
 
The left hand portion represents the employees of HL7 and the Staff of AMG, and these relationships are shown for example here and are not considered further in this report.  
  
The committees and SIGs that make up three of the four SDs are entirely made up of volunteers and are formed by petition to and approval of the TD. (At present by the TSC.)  The fourth SD, the Support Services Steering Division (OT on the chart) is made up of committees appointed by the TD, chaired by a volunteer, but made up of a mix of volunteers, employees and staff.  Hence, they sit on the boundary between the Employees and Volunteers, as do the Board-appointed committees.   
+
The committees and SIGs that make up three of the four SDs are entirely made up of volunteers and are formed by petition to and approval of the TD. (At present by the TSC.)  The fourth SD, the Technical & Support Services Steering Division (ST on the chart) is made up of committees appointed by the TD, chaired by a volunteer, but made up of a mix of volunteers, employees and staff.  Hence, they sit on the boundary between the Employees and Volunteers, as do the Board-appointed committees.   
  
 
The most critical concept exposed by this chart, is that the TD, SDs and committees on the right, and the Staff and Employees on the left '''cannot be successful in their endeavors''' without robust productive collaboration between them.  HL7 has always been fortunate to have minimal contention and maximum cooperation between its employees, staff and volunteers, and this T3F report is predicated on the continuation of that relationship.
 
The most critical concept exposed by this chart, is that the TD, SDs and committees on the right, and the Staff and Employees on the left '''cannot be successful in their endeavors''' without robust productive collaboration between them.  HL7 has always been fortunate to have minimal contention and maximum cooperation between its employees, staff and volunteers, and this T3F report is predicated on the continuation of that relationship.
  
==Decision Making Practices (Jim)==
+
==Decision Making Practices==
 +
This section documents the proposed set of decision-making practices for the Technical Directorate, an elected and Board appointed Committee reporting to the HL7 Board.  The TD will lead by example, and adhere to a set of decision-making practices that ensure consensus, openness, and balance of interest.
 +
 
 +
Furthermore, the practices as outlined here are designed to enable timely decision-making with an earnest attempt to ensure that input from all affected parties is considered.  The Decision-making practices are intended to govern the standard operating procedures of the TD and are not intended to conflict with rules governing ballot procedure as defined by ANSI and the HL7 Bylaws and Policies and Procedures.<br><br>
 +
# '''Meetings are open to all interested parties including but not limited to members of HL7, HL7 affiliates, and guests of HL7 as referenced in the HL7 Bylaws – Article 3.02.''' <br><br>Meetings of the TD are open to everyone to ensure that viewpoints of all affected parties have an opportunity to be shared and considered.  Everyone may have an opportunity to speak; however, the chair may limit discussion to topics that have been identified during the setting of the meeting agenda, or due to time-constraints that may prevent completion of business. If discussion is truncated prior to resolution of the item under discussion, a future time for discussion will be set prior to moving to the next topic. Participants with submitted topics are expected to attend when the purpose or mode of the meeting require their input. Other HL7 members may be asked to attend to provide specific input regarding a particular issue. The following list identifies expected participation by meeting type.  All TD meetings are open; this list simply identifies the anticipated participants.
 +
#* <u>Scheduled/Periodic conference call meetings</u> are attended by persons registered on the TD email list.
 +
#* <u>TD Meetings during Working Group Meetings</u> may be attended by any working group meeting attendee.  Participants are asked to introduce themselves and identify the nature of their affiliation with HL7.<br><br>
 +
# '''Venues of Notification.'''<br><br>All activities will be conducted in a public light with efforts made to ensure ample notification of those interested.  The TD shall utilize two key venues to notify the interested membership of its activities:  the TD<nowiki>'</nowiki>s Wiki site and the TD<nowiki>'</nowiki>s website.<br><br>Satisfaction of minimal notification requirements dictates that relevant announcements/materials/etc. be posted to '''''both''''' the Wiki and the website.  The Wiki will be used for discussion threads, notifications, new and archived documents, whereas the web server will predominantly be used for archival and document resources (decision documents, minutes, papers, etc.).<br><br>Any use of the terms '''post''', '''posted''', or '''posting''' refers to notification subject to these constraints.<br><br>
 +
# '''Notification of meetings and the intended agenda is provided prior to the meeting.''' <br><br>Binding decisions can be made only at meetings with the required advance notification; only recommendations and non-binding decisions can be made at special purpose meetings.<br><br>The chair of the TD shall make every attempt to ensure that all parties with an interest in agenda topics are made aware of the meeting time and location subject to the documented notification requirements.  As appropriate, TD activities will be cross-posted to other HL7 Wiki sites, depending upon the topic and type of meeting as indicated in the following list.  Certain meetings are subject to Bylaws guidelines for notification.  Please refer to the Bylaws for additional information.<br>
 +
#* <u>Working group meeting agendas</u> are posted in the meeting brochure.  A preliminary agenda is developed by Wednesday of the prior working-group meeting and posted with the minutes within 2 weeks.  The preliminary agenda is finalized on a scheduled conference call two weeks prior to the working group meeting and posted within 2 business days.  Recognizing the dynamic nature of working group meetings, the agenda may require updates.  Notification will be satisfied so long as at least two of the following venues are used:
 +
#** <u>E-mail notification by 6:00 pm local time the evening before the event</u>
 +
#** <u>Notification on the bulletin board (near the registration desk) at least 2 quarters prior to the event</u>
 +
#** <u>Announcement in the general session or lunch session prior to the event</u>
 +
#* <u>Scheduled/Periodic telephone conference call meeting agendas</u> are to be posted no later than 24 hours prior to the call. Preliminary agendas are to be determined at the close of each teleconference.
 +
#* The agenda, for either a conference call or working group meeting, will include the purpose of each topic, anticipated discussion time and whether it is intended to set direction or to make a decision.
 +
#* Should the TD require <u>action between scheduled meetings</u> there are two alternatives.  First, a Special Purpose Meeting may be called as defined in the Bylaws (Section 11.04), which requires 30 days notice.  Alternatively, the issues may be discussed as an informal group, bringing forward recommendations to the list or as a discussion topic for the next regularly scheduled TD meeting. Recommendations by the informal group are not binding decisions until acted upon by the TD.<br><br>
 +
#'''Decisions made at TD meetings are recorded in meeting minutes and posted.'''<br><br>Minutes are recorded and posted for all TD meetings including the date, time, and location of the meeting, a list of attendees, the intended agenda, a brief summary of discussion topics, and the outcome of proposals made (including vote tallies if votes were taken).<br><br>Minutes from a working group meeting will be posted no later than 2 weeks of the last day of the conference and in compliance with HQ deadlines; minutes from a conference call will be posted within one week of the call.<br><br>
 +
# '''Decisions made at non-working group meetings (conference calls and special purpose meetings) are summarized during the next working group meeting.'''<br><br>In the interest of facilitating good communication among the TD members, those decisions that were made between working group meetings will be summarized and available at working group meetings.  This communication will contain, at a minimum, abbreviated summary of the issues involved and the decisions made by the TD.  Any TD decisions are subject to the practices documented elsewhere in this paper.<br><br>
 +
#. '''Quorum for TD meetings: For decision making, the chair (or designate) and at least five other TD members must be present, including at least two of the four elected sub-group chairs (or their alternates) . For direction setting, the chair (or designate) and at least four TD members must be present.'''<br><br>Attendance for all meetings is recorded in the meeting minutes, including the participant name and constituency they represent.  The recorder for the meeting is responsible for ensuring minutes are taken and posted.  Due to the balanced makeup of the TD,  "Preponderance of Influence" is not viewed as a substantive issue for the TD.  The chair may cast a vote as a tie-breaker.<br><br>In all circumstances, the TD can have no more than one presiding chair. All other TD members,  act as regular voting members when not presiding.  Unlike other HL7 technical committees or SIGs with multiple co-chairs, the chair shall not change within the course of a given meeting.<br><br>Although any issue may be discussed within TD meeting venues at any time, binding actions cannot be taken without sufficient notification and quorum.  Absence of either of these conditions allows the TD to issue recommendations that must subsequently be ratified by the TD subject to satisfying constraints placed upon binding decisions.<br><br>
 +
# '''Decisions made by the Technical Directorate are reached using a simple majority vote.  The TD will always strive for consensus in decision-making.'''<br><br>While decisions are made by simple majority vote, the TD shall endeavor to make its decisions via a consensus process.  For a decision to be called consensus, it must receive two-thirds (66%) majority support.  While determining if consensus is being reached, a variety of techniques may be used informally to assess the position of the group, including but not limited to straw poll, Robert<nowiki>'</nowiki>s Rules of Order, seeking response to a hypothetical opposing view, and polling each participant to voice their position on the issue.<br><br>When formal votes are taken appointed or elected TD members shall always receive a vote. For non-binding decisions only, all meeting participants may have the opportunity to vote at the discretion of the chair.<br><br>Once voted, quorum is revisited to adjust for abstentions.  Quorum must be met across yeah-s and neah-s for the vote to carry.<br><br>It is recognized that revisiting previously made decisions inhibits TD progress and should be discouraged.  That said, circumstances might exist that warrant re-opening of discussion on a previously visited issue.  To dissuade this practice, such re-opening requires a formal motion, second, and simple majority affirmative vote of the TD as subject to the quorum rules in this document; however, in order for the decision to be considered binding, advance notification, as defined in this document, is required<br><br>
 +
# '''TD Members unable to participate in Directorate activities in person may <u>not</u> do so by proxy.'''<br><br>The Technical Directorate does not recognize voting by proxy.  There is ample opportunity to support or oppose proposals under consideration through TD Wiki discussions, email and conference calls.  If a member feels strongly enough about a particular topic to want consideration by the TD, that member shall be present for the topic to be considered.  The chair will be sensitive and considerate in attempting to accommodate schedules to ensure the member can be present at the appropriate venue.<br><br>'''Note:''' The four TD members who serve as Representatives of a Steering Division each have an elected Alternate Representative who can attend and vote in TD meetings when the primary Representative is unable to attend.  '''Votes by Alternate Representatives are not deemed to be ''proxy'' votes.'''<br><br><u>Statement of Position</u>.  Those HL7 members wishing to establish a position on a topic under consideration by the TD in writing may do so subject to the notification requirements below.  Statements of Position received prior-to or during the meeting will be shared by the chair as part of the discussion on the related topic.  The chair has the responsibility to voice and represent these positions during relevant discussion, though they are not under obligation to support or defend them.  These statements do not carry the weight of a vote and are included as informational items only for consideration by the TD. All Statements of Position received in electronic form will be included as attachments to the minutes.<br><br>
 +
# '''The TD shall rely upon Robert<nowiki>'</nowiki>s Rules of Order in the event that formal guidance is needed or requested.'''<br><br>The TD intends to ensure the effective and active engagement of all participants.  To ensure fair and just participation, the TD shall follow its documented decision-making practices, falling-back upon Roberts Rules of Order in the event of a question or concern.  Since Robert<nowiki>'</nowiki>s Rules of Order provides formalism for addressing almost all matters of process, this provides a "backup mechanism" of formality in the event that it is required.<br><br>It is the responsibility of the chair to guide the TD to an efficient and effective outcome.  The TD shall follow, in this order of precedence, these Decision-making Practices (which cannot conflict with HL7 Policies and Procedures or the HL7 Bylaws), HL7 Policies and Procedures, the HL7 Bylaws, and Robert<nowiki>'</nowiki>s Rules of Order.  TD-established decision-making practices can refine the HL7 Policies and Procedures and Bylaws so long as they remain in accordance with those documents.<br><br>In the event that an issue arises where formality is required and other guidance exists, Robert<nowiki>'</nowiki>s Rules of Order shall take precedence.  This provides a "common denominator" to keep in-check the power of the chair and to confirm the rights of all TD members.
 +
 
 +
 
 +
===Quorum Examples===
 +
 
 +
Based upon PIC<nowiki>'</nowiki>s Decision Making Practices Document version 1.3, adopted December 1, 2003.
 +
 
 +
# Simple scenario<br>''6 persons, including two elected subgroup representatives , attend a meeting, including the chair (or their designate).''<br><br>Quorum is established and the TD can conduct its business as usual. All participants are eligible for voting;<br><br>
 +
# Tie scenario<br>''6 persons, including two elected subgroup representatives,attend a meeting, including the chair (or their designate).''<br><br>Quorum is established and the TD can conduct its business as usual. In the event of a tie this will not constitute a consensus decision, because the consensus majority (66%) criterion has not been met.<br><br>
 +
# Non-representative scenario<br>''6 persons, not including two elected subgroup representatives, including the chair (or their designate).''<br><br>Quorum is not established and the TD cannot conduct official business, because two members representing an elected subgroup are not present.<br><br>
 +
 
 +
Below is a quick reference for meeting configurations.  (Note:  this table does not have a direct correlation to the scenarios above.)  .
 +
 
 +
{|border="2" cellspacing="0" cellpadding="4" width="17%"
 +
|colspan = "10"|'''  '''
 +
 
 +
|-
 +
|'''Member Designation'''
 +
|align = "center"|'''1'''
 +
|align = "center"|'''2'''
 +
|align = "center"|'''3'''
 +
|align = "center"|'''4'''
 +
|align = "center"|'''5'''
 +
|align = "center"|'''6'''
 +
|align = "center"|'''7'''
 +
|align = "center"|'''8'''
 +
|align = "center"|'''9'''
 +
 
 +
|-
 +
|'''Chair or Designate'''
 +
|1
 +
|1
 +
|1
 +
|1
 +
|1
 +
|1
 +
|1
 +
|1
 +
|1
 +
 
 +
|-
 +
|'''Elected subgroup representatives'''
 +
|1
 +
|2
 +
|3
 +
|1
 +
|2
 +
|3
 +
|1
 +
|2
 +
|3
 +
 
 +
|-
 +
|'''Other Voting TD members'''
 +
|3
 +
|2
 +
|2
 +
|4
 +
|3
 +
|2
 +
|5
 +
|4
 +
|1
 +
 
 +
|-
 +
|'''Is a Quorum established?'''
 +
|No
 +
|No
 +
|Yes
 +
|No
 +
|Yes
 +
|Yes
 +
|No
 +
|Yes
 +
|No
 +
 
 +
|}<br clear="all">
 +
 
 +
==Tactical Plan to Establish Technical Directorate ==
 +
The T3F recommends the following time-line to the HL7 Board for the establishment of the Technical Directorate.  If the composition and election processes included in this report are approved by the Board before or during the Board's June Conference call, this schedule provides a reasonable time-line for carrying out the TD elections in time to allow the TD to hold its first meeting during the September 2007 Working Group Meeting in Atlanta.  (Note that the staging of the nominations and elections are designed to allow the Affiliate constituencies to know who are the Steering Division Representatives before the Affiliate election process begins.)
 +
 +
'''May 2007 Working Group Meeting'''
 +
* T3F to present current recommendations for the formation of the TD.
 +
'''May 31, 2007'''
 +
* T3F submits a final version of this document based on feedback from the presentation at the May WGM to the Board, and seeks approval of the [[#Composition and Functioning of TD|section detailing the composition and election of TD members]].
 +
 
 +
'''June through August 2007'''
 +
* Three weeks for nominations of SD Representatives. (open June 5; close June 24)
 +
* Three weeks for election of SD Representatives. (close July 15)
 +
* Three weeks for nomination of Affiliate Representatives. (close Aug 5)
 +
* Three weeks for Affiliate Representative election.(close August 26)
 +
'''September 2007'''
 +
* Board appoints its representative any time prior to September.
 +
'''September 2007 Working Group Meeting'''
 +
* First official meeting of the TD.  TD to elect a chair.
 +
* Terms will be staggered by drawing lots.
 +
 
 +
==Project Plan for an HL7 Architecture ==
 +
The initial guidance from the Strategic Initiative and the Board suggests that a completely defined, accessible Architecture for HL7 standards is an essential element to developing, promoting and maintaining the inter-operable standards to which HL7 aspires.
 +
 
 +
The T3F is in full agreement with this suggestion, yet has not found the band-width to do more than pay lip service to this need.  This simply reflects inevitable trade-offs between tactical and strategic objectives.  In this case, the tactical objective has been to get the Technical Directorate "off the ground."
 +
 
 +
In order to avoid having tactical issues continue to dominate, the T3F will prepare a Project Proposal in the near future to:
 +
* define HL7's objectives for a effective architecture,
 +
* do a "gap analysis" between what HL7 has today and what it seeks, and
 +
* recommend a specific plan of action to achieve the goal.
 +
 
 +
At one point, the T3F aspired to have a Project Proposal for review at the upcoming Working Group Meeting, but will not meet that objective.  At this point it is the T3F's intent to develop such a proposal in coming weeks so that it might be available for Board review this summer.
 +
 
 +
In preparation for that effort, Berndt Blobel, a member of the T3F, has provided the following background material.  It provides a glimpse of what is needed, and a cursory assessment of where HL7 stands in this regard.
 +
 
 +
===Architecture for Inter-operable Health Information Systems===
 +
For establishing sustainable and semantically inter-operable health information systems, an appropriate architectural approach has to be developed, referring to approved knowledge and existing standards as much as possible.
 +
 
 +
====Definition====
 +
An architecture of a system is a (formal) model of the real system, describing the system<nowiki>'</nowiki>s components, their functions and relationships.
 +
 
 +
====Architecture Characteristics====
 +
The architecture has to be
 +
* '''business-driven '''(for meeting user requirements and process needs),
 +
* '''following a unified process '''(for definition, design, implementation, evaluation, testing, and maintenance to support semantic interoperability),
 +
* '''service-oriented '''(for meeting business requirements and users<nowiki>'</nowiki> expectations (acceptance) by serving the users<nowiki>'</nowiki> business processes, based on domain knowledge expressed in corresponding concepts and aggregation schemes),
 +
* '''model-driven '''(separating computation-independent models, platform-independent models, and platform-specific models for enabling portability, flexibility, and semantic interoperability),
 +
* '''component-oriented '''(for supporting scalability and flexibility),
 +
* '''lawful '''(for providing user acceptance and trust).
 +
 
 +
====Model Characteristics====
 +
In that context, models as reality representation, communication tools, and representations of business interests, intentions, etc., have to possess certain characteristics such as
 +
* the separation of computation-independent models, platform-independent models, and platform-specific models, always starting with the business model and tackling all views of the ISO 10746 Open Distributing Processing reference model,
 +
* deriving the models by constraining reference models for information and processes,
 +
* the consideration of structural <u>'''and'''</u> behavioral aspects of the considered system (reflecting the semantic and the pragmatic aspect of information),
 +
* the provision of appropriate concept representations including the aggregation schemes (rules) at different aggregation levels,
 +
* the deployment of appropriate (reference) terminologies and ontologies.
 +
 
 +
====HL7's Position in This Space====
 +
For those who have wrestled with "Version 3" for the last decade, these are familiar concepts and objectives, most of which have been recognized and some of which have been addressed, if not fully achieved.
 +
 
 +
For example, HL7 meets some but not all of the paradigms for establishing sustainable and semantically inter-operable health information systems, defined in the Generic Component Model, such as:
 +
* Component orientation and the distribution paradigm;
 +
* Unified process of definition, design, implementation, evaluation, testing, and maintenance;
 +
* Common reference models for information and processes;
 +
* Common terminologies and ontologies;
 +
* Separation of logical and technological views by platform-independent and platform-specific models, respectively;
 +
* Specification of the components<nowiki>'</nowiki> structure and behavior as well as of the rules being applied based on knowledge, concepts and contexts;
 +
* Enhanced security and privacy services.
 +
 
 +
HL7 has developed an advanced unified process, the HDF. It provides a model-driven approach, a vocabulary with references to existing terminologies. It is component-oriented at different levels of granularity. HL7 V3 describes most (in future perhaps all) views of the RM-ODP, starting with business requirements (e.g. EHR-S Functional Model), business process models (e.g. Templates, SOA), and thus is, step by step, establishing a service-oriented architecture.
  
==Tactical Plan to Establish Technical Directorate (Craig) ==
+
The most obvious weaknesses are immature development in some areas and missing integration between the paradigms and methodologies needed for establishing a sustainable architecture. This is a question of time and development, and the project to be proposed will seek to define how much time, and how much development.
==Project Plan for Architecture (Berndt) ==
 

Latest revision as of 06:08, 30 April 2007

HL7 Technical Directorate - It's Mission, Responsibilities, Composition and Formation

Contents

Introduction

This document provides specific recommendations from the Technical Transition Task Force (T3F) to the HL7 Board. It includes a complete definition of the Technical Directorate (TD), its composition and relationships, and proposes a plan to elect and establish the Technical Directorate to allow its first meeting at the September 2007 Working Group Meeting in Atlanta.

Background

The T3F began work in earnest at the Winter Working Group Meeting in January 2007. The T3F met three times face-to-face at that meeting and has held a conference call every week but one since then. The group used a number of sources in its efforts -- Strategic Initiative documents, ORC reports, work from the project life-cycle team, etc. In addition, the group has benefited greatly by having consistent attendance at its meetings from the TSC (Quinn and Hammond), the ARB (Walker) and the project life-cycle group (McCaslin), and wishes to thank each of these groups for their support.

Early on in its efforts, the T3F determined that its primary initial task was to provide a complete definition of the roles and composition of the Technical Directorate that could be adopted at the May Working Group Meeting. This would afford the opportunity to review these recommendations in Cologne and allow the Technical Directorate to be formed as rapidly as possible thereafter.

Status of this Document

The T3F regards this document as a draft of a "contract" between the Technical Directorate and the HL7 Board of Directors. It should be a "living" document that evolves as the TD evolves. It should not be replaced by a "Charter" for the Technical Directorate, but rather the Charter should be drawn from this document and evolve as this document and the TD itself evolves.

Mission

Mission Statement

The HL7 Technical Directorate oversees and coordinates the technical effort contributed by the HL7 volunteers who make up the HL7 Working Group. Its mission is to assure that the efforts of the Working Group are focused on the overall HL7 mission established by the HL7 Board.

The Technical Directorate and the HL7 Working Group operate in such a way so as to:

  • respect the contributions and ideas of the talented individuals who make up the Working Group;
  • maintain an effective focus on the goals of HL7;
  • assure that the all major decisions are based on consensus of the stakeholders;
  • maximize sharing and "re-use" of work products between elements of the Working Group;
  • use project management to assure that project goals are articulated and met;
  • reduce competition and conflict between the elements of the Working Group; and
  • assure that HL7 standards are developed on a solid architectural foundation that assures consistency and interoperability.


Success Criteria

The Technical Directorate success criteria must focus on three core objectives -- assuring the continuity and vitality of the HL7 volunteer-based Working Group; maintaining coherent inter-operable standards while minimizing duplication of effort; and providing sound consensus-based standards that meet the needs and schedule requirements of HL7's clients.

The Technical Directorate will be successful if HL7 members can easily find answers to the following sorts of questions:

  • What is HL7 doing in the area of xxx? Where xxx is an area of interest to a member
    • what publications exist?
    • what active projects / work-items are there?
    • what committee is responsible for that area?
  • What is happening on this project?
    • When will it deliver?
    • What can I do to make that faster / more likely to deliver on time?
    • What has happened recently (is it really active?, has it delivered on schedule?) What is happening to this publication?
  • How do I know what to do at a WGM?
  • What is the status of a particular HL7 specification or document?
    • Who is using / plans to use this publication?
    • What feedback was received to this DSTU?
    • What change proposals are open for this publication?
    • Who maintains this document, and where do I send comments / questions
    • What is the ballot history for this document (when was it balloted, and what were the comments and resolution, and what was the ballot pool)
    • Are there any plans to produce a revision for this document?

Defining success criteria in this way shows how the TD is mandated to expose the information that is needed for the board and membership to be able to plan effectively and to support the promotion of the consensus-based products. It also underpins the importance of work reuse, and only having as many projects and committees as are needed. Finally it defines success in a way that reflects the questions that led to the formation of the TD.

Responsibilities

This section is based on Strategic Initiative documents, on-going revision by the T3F, the Mission statement above, and consideration of the stated responsibilities of the Technical Steering Committee as documented in HL7's Bylaws and the Policies and Procedures Manual. These responsibilities are shared, as noted below, with the four Steering Divisions (SD) (sub-groups of committees) that report to the Technical Directorate.

Oversees Execution of Standards Development

Assures that the efforts of the Working Group (WG) are effectively focused on accomplishing the product and services strategy set forth by the Board.
  • Participates in development of an HL7 Product and Services strategy for adoption by the HL7 Board
  • Oversees the TD Steering Divisions (SD) in the establishment and management of projects and project teams to accomplish the product and services strategy set by the Board. To that end, it works through the SDs to:
    • Approve new work groups based on priority projects
    • Dissolve work groups no longer required based on the HL7 Products and Services strategy
    • Works with sub-groups to align and prioritize projects in accordance with the products and services strategy
    • Working with the subgroups, helps to ensure the availability of project resources
      • helps with resource provision or recruitment (people, rooms, tools, etc)
      • includes ensuring the continuity, vitality, and effectiveness of the HL7 volunteer-based Working Group
  • Approve, monitor, and perhaps intervene in overall product development
    • Works with the SDs and the PMO to oversee the tracking of projects to meet HL7 objectives. The Steering Divisions will function to assure that they or the committees under them set milestones, monitor and ensure that quality assurance has been done
  • Performs top-level review and authorizations as specified in the formal development process:
    • Working with the SDs, reviews, approves, and prioritizes requests for new projects.
    • Working with the SDs, recommends project probation or dissolution to the Board
    • Sets remit for ARB and Project Management Office and serves as escalation point for issues not resolved at the committee or SD level.
    • ensures that quality checks in the project development process are satisfied.
    • Reviews and approves requests from Technical Committees to initiate a ballot and serves as escalation point for ballot response handling.

Provides a Coherent Architecture and Development Process

Establishes (or reviews) the Technical Architecture, the development methodologies, and the work processes to be used by the WG in developing HL7 consensus-based standards specifications
  • has overall responsibility for the development and adherence to an HL7 Technical Architecture and the development, maintenance, and execution of an HL7 standards development process
    • working through SDs, makes sure that architecture and process is developed, communicated (documented, etc), maintained and enhanced.
      • through Committees such as MnM, Vocabulary, and PIC as well as the ARB.
  • defines and manages international harmonization mechanism
  • ensures that the balloting of any HL7 specification, or portion thereof, is carried out in accordance with HL7 Bylaws and ANSI rules.

Oversees the Technical Operations of the Working Group

Assures that the WG works smoothly together and covers the work scope in a consistent manner.
  • Ensures that Working Group policies and procedures and bylaws are followed
    • With the SDs, oversees execution of procedures for committee creation, dissolution, and co-chair elections.
    • ensures that meetings and calls are carried out according to policy
  • Oversees continuous quality process
  • Works through SDs to identify cross-domain and cross-function gaps, overlaps, discrepancies, potentials for collaboration, and conflicts and recommends resolution
  • responsible for any official interpretation of the HL7 standards.
    • resolves conflicts within the Working Group and prioritizes resources according to project priority (example, room balancing at WGMs)
    • ensures the impartial handling of substantive and procedural

complaints regarding any action or inaction as related to the production of HL7 specifications.

Primary Communication Vehicle for the Technical Operations of HL7

Serves as technical authority of HL7, communicating status and guidelines regarding standards and operations.
  • serves as technical escalation point for any questions related to the technical operations of HL7
  • reports to the Board, the WGM, and the membership on Technical operations news, status, and issues as appropriate
  • responsible for any official interpretation of the HL7 standards.

Composition

The T3F spent several meetings deliberating the appropriate composition and style of functioning for the Technical Directorate. This section reflects the results of those discussions, and addresses three topics:

The order of these topics is arbitrary and the discussion will, of needs, include both forward and backward references. The T3F did not attack any of these topics de novo. In every circumstance, we built on the guidance provided by earlier Strategic Initiative, ORC and Transition documents. We sought to recognize the principles and objectives that underlay each of those documents and to maintain those principles and objectives while improving, we hope, the resulting framework.

HL7 Committee Structure

The HL7 Working Group is made up of a number of volunteer-driven Committees and SIGs that have been highly successful, to both their own and to HL7's credit and benefit. Simultaneously, however, as the numbers of groups expanded, their breadth, number and diversity posed major challenges for coordination and collaboration between them. Discussion and debate on such issues in the forum of the Technical Steering Committee (TSC) became difficult and unproductive in recent years, and failures in coordination have begun to threaten the effectiveness of HL7.

The challenge of the Strategic Initiative was to address these coordination and collaboration issues while retaining the essential vitality of a Working Group made up of and driven by the best, brightest and most dedicated medical informaticists and information scientists available. The essence of the Strategic Initiative proposal was to revise the leadership of the Working Group from a single TSC with representation from each Committee and SIG to a two-level hierarchy of a Technical Directorate (TD) and a small set of Steering Divisions (SD, a new term). This was the foundation from which the T3F developed this proposal.

The starting point for this discussion was a previously developed Strategic Initiative document titled //"Creation of the Transitional Technical Task Force (T3F)". The final proposal can be summarized with the "nested list" of bullet points at the end of this paragraph. The remainder of the topics in this "HL7 Committee Structure" section discuss the rationale and principles behind this proposal, specific responsibilities of the TDs and SDs, and the definition and committees in each Steering Division. The proposed hierarchy is:

  • HL7 Board
    • Technical Directorate -
      6 elected voting representatives, 4 appointed voting members
      TD-elected Chair
      • Foundation & Technologies Steering Division
        9 existing TCs and SIGs
        2 Elected SD Co-Chairs plus Co-Chairs of TCs & SIGs in SD
      • Structure & Semantic Design Steering Division
        10 existing TCs & SIGs
        2 Elected SD Co-Chairs plus Co-Chairs of TCs & SIGs in SD
      • Domain Experts Steering Division
        17 existing TCs and SIGs
        2 Elected SD Co-Chairs plus Co-Chairs of TCs & SIGs in SD
      • Technical & Support Services Steering Division
        9 TD-appointed Committees (7 formerly Board-appointed, 2 new)
        2 Elected SD Co-Chairs plus Co-Chairs of Committees in SD

Organizing Principle

During its deliberations, the T3F made the following observations:

  • HL7 members join committees because of their personal (or corporate) interest in the subject matter content of the committee, regardless of whether their interest stems from academic, development or implementation activities.
  • The original break-out of committees (provided in the SI document) aggregates the committees by commonality of what they produce and the relationship of that work product to the other Working Group committees. The T3F found this is to be a sound approach.
  • One of the key activities of the TD will be to identify and reduce those places where committees are "stepping on each others toes" or "reinventing the wheel." Coordination within the proposed Steering Divisions will facilitate this activity.
  • The existing relationship between TCs and SIGs may need to be "re-thought", because the Steering Division strategy will clearly place a number of SIGS in a Steering Division that is different from that to which their current "parent TC" is assigned.
  • It will be important to not disrupt existing collaboration while establishing this organization, and it is clear that many topics may best be managed, in "matrix fashion" between committees in two or three Steering Divisions.
  • A number of committees clearly produce products that fit in two or even three of the Steering Divisions. This may be effective, or it lead the TD to consider whether to recommend these groups be split.

Ultimately, the T3F recognized that the organization as proposed is imperfect, not by design, but by the nature of the HL7 Committees and SIGs that do not permit simplistic classifications. Regardless of what is proposed, someone will question the result. The key element however is to establish the three-tier structure first, gain the advantages of focusing critical organizational thinking into smaller meetings so that the work can get done, and then evolve the structure over time.

Technical Directorate Role

The technical Directorate (TD) will be the focal point for decision making, harmonization, issue resolution, project and committee creation and dissolution within the Working Group. The TD will be a representative consensus body of elected and appointed members. (Specifics are in a later section of this document.)

The T3F notes that however the Steering Divisions are defined, and whatever additional relationships may exist between committees, the Technical Directorate will not be successful in meeting HL7's objectives unless it can assure the harmonization of content and design across HL7 standards.

As a consequence, the notion of required harmonization and shared stewardship must clearly be a fundamental principle of the TD, of the Steering Divisions, and of each TC and SIG. Overall, it is the TD that must define and manage the processes that bring about such harmonization and then must delegate similar responsibilities to the Steering Divisions and to the committees.

Further, the TD must have a central role in project management. It is assumed that the project life cycle strategy being developed will be a fundamental process for all HL7 work. The TD will incur responsibilities:

  • to approve projects (after they are vetted in the Steering Divisions)
  • to initiate projects to carry out its mission (such as harmonization)
  • to oversee the functions of the Project Management Office, and
  • to maintain the project life cycle definition

Certainly, several of these responsibilities will need to be delegated in whole or in part to the Steering Divisions or to specific committees.

Steering Division Definition and Composition

In keeping with the original Strategic Initiative document, T3F proposes to divide the existing Technical Committees, Special Interest Groups and Board-appointed Committees into four functional groups called Steering Divisions (SD). Each Steering Division will be a committee in its own right made up of the Co-Chairs of the groups in the SD. It is expected that each SD will meet face-to-face during each Working Group Meeting and will conduct conference calls, as needed. A partial list of specific SD responsibilities includes:

  • nominate and elect the representative from that SD to the TD, who will also serve as a Co-Chair of the SD
  • nominate and elect an Alternate representative to the TD, who will also serve as a Co-Chair of the SD
  • review proposed projects and make recommendations for action to the TD
  • monitor project status within the SD
  • review proposals to create, modify or dissolve Committees and SIGs in their SD and make recommendations for action on same to the TD
  • identify coordination issues within and between the committees of the SD and resolve these or recommend resolutions to the TD
  • identify coordination issues between SDs and their committees and recommend resolutions to the TD
  • undertake harmonization tasks as delegated by the TD
Foundation & Technologies Steering Division

Committees and projects in this space focus on providing the fundamental tools and building blocks that other Committees should use to build the standards, and upon the technology infrastructure that implementers of HL7 standards must manage.

  • Conformance
  • Infrastructure & Messaging
  • Implementable Technology Specifications (ITS)
  • Java
  • Modeling & Methodology
  • Security
  • Service Oriented Architecture (SOA)
  • Templates
  • Vocabulary
  • Related multi-committee projects:
    • Dynamic Model
    • Harmonization
    • HL7 TermInfo
Structure & Semantic Design Steering Division

Committees and project in this space focus on creation of basic patterns and common messages that could exist on their own, but are mostly used by others.

  • Clinical Context Object Workgroup (CCOW)
  • Clinical Decision Support
  • Electronic Health Record (EHR)
  • Financial Management
  • Genomics
  • Orders & Observations
  • Patient Administration
  • Personnel Management
  • Scheduling & Logistics
  • Structured Documents
  • Related multi-committee projects:
    • Clinical Statements
    • Common Message Element Types (CMETs)
Domain Experts Steering Division

Committees and projects in this space focus on creation of messages, services, documents using many of the common structures in place, yet expanding it in key areas as well.

  • Anatomic Pathology
  • Anesthesiology
  • Attachments
  • Cardiology
  • Clinical Guidelines
  • Community Based Health Services
  • Emergency Care
  • Government Projects
  • Health Care Devices
  • Imaging Integration
  • Laboratory
  • Patient Care
  • Patient Safety
  • Pediatrics Data Standards
  • Public Health Emergency Response (PHER)
  • Pharmacy
  • Regulated Clinical Research Information Management (RCRIM)
Technical & Support Services Steering Division

These committees are currently Board-appointed. In future, the T3F recommends that they be appointed by the TD, subject to Board approval. The committees will elect their own Co-chairs, subject to TD approval. For the most part, these groups are functioning on volunteer effort, although each has strong support from a designated staff liaison. The primary feature of these committees is that their projects and products provide direct support to the Technical Committees and SIGs of the Working Group and thereby enable the Working Group to function efficiently.

  • Education
  • Electronic Services
  • Implementation
  • Marketing Committee (T3F needs consultation during the Cologne meeting with the Board and the Marketing Committee to ascertain whether inclusion of the Marketing Committee in this Steering Division is appropriate)
  • Process Improvement Committee (PIC)
  • Product Management Committee (T3F needs consultation during the Cologne meeting with the Product & Services Committee to ascertain whether inclusion of the Products and Services in this Steering Division is appropriate)
  • Project Services -- a new group that will take responsibility for the Project Life Cycle and will serve as the primary support for the PMO
  • Publishing
  • Tooling
Architecture Review Board

The T3F believes the Architecture Review Board (ARB) fulfills a critical mission that must continue under the TD. To that end, the T3F is proposing that the ARB become a TD-appointed committee that "stands alone" (independent of the Steering Divisions), and (see below) that the ARB have a voting representative on the TD. Normally this representative will be the ARB Chair, but in the circumstance that the ARB Chair is already a member of the TD, a different ARB member will also be named to the TD.

Composition and Functioning of TD

The makeup of the proposed Technical Directorate is illustrated in the following chart. It includes ten voting members -- six elected representatives, two Board-appointed positions (the CTO and a liaison), and up to two TD-appointed positions. It also has a non-voting secretary, to be assigned by HQ, and other staff support positions. Specifics of the election processes, terms, etc. are in following sub-sections.

TDComp-v3.png

TD Membership

Steering Division Representatives

Each of the four Steering Divisions (SD) will have an elected voting Representative on the TD. Further, each SD will elect an Alternate Representative who is authorized to attend TD meetings and vote in the event the elected Representative from that SD is unable to participate. This assures strong, consistent representation from each SD. In addition, the primary and alternate representatives will serve as Co-Chairs of the Steering Division itself.

The election process for SD Representatives is patterned after the process used in 2006 to elect the T3F representatives:

  1. During a nomination period of at least two weeks, nominations for representatives of the SD will be accepted from the Co-Chairs of the Committees and SIGs that make up the SD.
  2. The nominees are expected to be individuals who are either current Co-Chairs or a past Co-Chair of one of the Committees or SIGs in the SD. Effective service on the TD will require such experience. Nominees should be prepared to commit one to two hours a week to the TD, if elected.
  3. HL7 staff will contact nominees to verify their willingness to stand for election, and to solicit a brief nominees "statement" for distribution.
  4. Individuals who are nominated to represent more than one SD will be asked to choose which nomination they wish to accept, and must reject the other(s).
  5. An election period of at least three weeks will follow the nomination period. The votes will be cast by the Committees and SIGs in the SD, using their normal decision-making practices.
  6. Each Committee will cast votes for two of the candidates, and will be asked to state a preference for one of the two as their primary representative. (This preference will be tallied only if there is a need to resolve a tie.)
  7. The candidate receiving the most votes will be named the Representative for that Steering Division. The candidate receiving the next higher number of votes will be named the Alternate Representative for that SD. Both the first and second place candidates will be named Co-Chairs of the SD.
  8. Tie votes will be resolved by tallying the primary representative preferences for the candidates involved in the tie. If tally also results in a tie, the decision will be made by drawing lots, unless one of the candidates involved wishes to defer to the other(s).
Affiliate Representatives

Two Affiliate Representatives will be elected by the "global" HL7 Affiliates -- the "traditional" affiliate organizations plus the US affiliate. (During the initial election, the HL7 Board is requested to designate a consensus body to nominate and cast votes for the US Affiliate.)

The election process for Affiliate Representatives is:

  1. During a nomination period of at least three weeks, nominations for Affiliate Representatives will be accepted from the affiliate organizations.
  2. Nominees should be prepared to commit one to two hours a week to the TD, if elected.
  3. HL7 staff will contact nominees to verify their willingness to stand for election, and to solicit a brief nominees "statement" for distribution.
  4. An election period of at least three weeks will follow the nomination period. The votes will be cast the Affiliates, using their normal decision-making practices.
  5. Each Affiliate will vote for one or two of the candidates, depending upon how many Affiliate Representative positions are being filled in that election. (See discussion of member terms, below.)
  6. The one or two candidate receiving the most votes will be named the Affiliate Representative(s), depending upon how many positions are being contested.
  7. Tie votes will be resolved by drawing lots, unless one of the candidates involved wishes to defer to the other(s).
Representative Election Timing

In order to assure the greatest diversity and balance of the representatives on the Technical Directorate, the election of Representative Members will be phased, with the Election for Steering Division Representatives coming first, election of Affiliate Representatives second, and appointed TD members being designated last.

Board-Appointed Members

The HL7 Board of Directors will appoint two members to the Technical Directorate.

  1. The Chief Technology Officer who will hold an ex officio voting position on the Technical Directorate.
  2. A Board Liaison to the Technical Directorate, which is also a voting position.
Technical Directorate-Appointed Members

The Technical Directorate will also appoint two members to the TD. They are:

  1. An Architecture Review Board (ARB) Representative. The T3F believes that the ARB fulfills a vital "independent" role in HL7 and should have voting representation on the TD. Normally this representative will be the ARB Chair, but in the event that the Chair is already a TD member, or declines to serve, another ARB member will be selected.
  2. An ad hoc TD-Appointed Member will be appointed on a variable term, not to exceed two-years, based on requirements or needs for balance or expertise that the Technical Directorate may from time to time identify. This will be a voting position.

Membership Terms

All normal membership terms on the Technical directorate shall be for two years, and will run on a calendar year basis. (See exceptions, below). There are no term limits, members may serve successive terms.

Technical Directorate Elections should be held between the "Spring" and "Fall" Working Group Meetings each year, for candidates who will take office in January of the following year. Each year, representatives for two of the four Steering Divisions will be elected as will one of the two Affiliate Representatives. The appointed positions do not need to be staggered.

Vacancies

In the event that a member must resign from the Technical Directorate, the following procedures shall be used to fill vacancies:

  1. For SD Representative positions, the Alternate Representative will be designated to serve the remainder of the vacated term, and the Alternate position will be re-filled in the next election cycle.
  2. For Affiliate Representative positions, the Affiliate Council will be asked to name an individual to serve the remainder of the vacated term.
  3. For the Board Liaison and the ARB Representative appointed positions, the appointing body will be asked to fill the vacated position as soon as possible. The initial term of the replacement appointee will run until the second year-end following the appointment.
Term Exceptions

The following exceptions exist for the two-year, calendar-term rule above:

  1. The CTO holds a standing ex officio membership, and therefore that TD term is dependent upon the term of service as CTO.
  2. The term of ad hoc TD-Appointed Member will start when the TD makes the appointment and will end as determined by the TD, but cannot exceed two years.
  3. During the summer of 2007, elections are planned for all six elective positions. In order to establish staggered terms, two of the four elected SD representatives and one of the two elected Affiliate representatives will be designated to serve an initial "half-term." This designation will be determined by drawing lots.
  4. Because of the desire to have the TD start functioning in September 2007, the initial terms of the elected and appointed members will be extended by to cover the period from September 16, 2007 through to the nominal start of their terms on January 1, 2008.

Election of Technical Directorate Chair

The Chair of the Technical Directorate will be elected by the Technical Directorate itself. The Chair shall be selected from the voting members of the TD. There will be no formal designation of a Co-Chair or Vice-Chair for the Technical Directorate. The Technical Directorate can take whatever steps it wishes to assure coverage when the Chair is unavailable for a particular meeting, including, if it wishes, naming a standing Vice-Chair.

Term of Office

The Chair will be elected for a two-year term of office, regardless of how long the candidate's membership term has left to run.

In the not unlikely event that the term of office runs longer than the Chair's term as a member, the TD may use its "TD-Appointed" position to extend the Chair's membership, or may petition the Board to temporarily expand the TD membership to allow the Chair to serve out the term of office.

The Technical Directorate should seek to establish Chair terms of office that run on a calendar basis. As with regular terms, the term of the initial TD Chair shall be extended to cover the period from September 16, 2007 through December 31, 2007.

Decision making and delegated decisions

By and large, decisions of the Technical Directorate will be made by vote. There are however, tactical decisions, such as approvals for ballot, exceptions to ballot rules, etc. that have, in the past been assigned to the Technical Chair of HL7. Such decisions should be delegated to the CTO or to the Chair of the Technical Directorate. The TD will need to take early action to assign such delegation.

Relationship of TD to CTO

In the course of its deliberations, the T3F paid particular attention to the role of a Chief Technical Officer (CTO). Ultimately, the T3F came to the conclusion that the relationship between the CTO and the TD should mirror the relationship between the CEO and the Board of Directors each acting assure the success of the other.

This decision was predicated on the assumption by the T3F that the TD would participate in the Board's selection of the CTO and that the following principles will be applied in making a CTO selection, in priority order:

  1. A proven consensus builder
  2. Someone who knows and is known to the HL7 Working Group
  3. Likely to have been a Co-Chair or “facilitator”, but not necessarily required
  4. Have a strong understanding or working knowledge of the technology that HL7 defines and is dependent upon.

In that context, the following motion was unanimously adopted by the T3F.

T3F Motion Unanimously Adopted April 3, 2007

WHEREAS:

  • The task of over-seeing and coordinating the technical activities of Health Level Seven requires the full-time attention of a knowledgeable professional, "Technical Officer";
  • The effective coordination of the various committees and SIGs requires a restructuring of these into three or four sub-groups reporting to an elected Technical Directorate;
  • The Technical Directorate must assure the continued involvement and support of HL7's Core Resource - volunteer-driven Working Group; and
  • The success of the Technical Directorate and the success of the "Technical Officer" are inextricably intertwined, and, further, are essential to HL7's success;

THEREFORE, the Transitional Technical Task Force RESOLVES to recommend:

  • The "Technical Officer" should be recruited to work with and support the Technical Directorate in its responsibilities to oversee HL7's technical activities;
  • The "Technical Officer" should report to the CEO and the HL7 Board, and should be a voting member of the Technical Directorate.
  • The Chair of the Technical Directorate should be be elected by the voting members of the Technical Directorate, and selected from within the members of the Technical Directorate.
  • The Technical Directorate and its Chair should delegate responsibilities and operational decision-making (to be defined later) to the "Technical Officer."
  • The Technical Directorate should have a role in recruiting and evaluating the "Technical Officer."

Relationships

Clearly, the central role that the Technical Directorate will play within HL7 demands an understanding of the relationships of that group to the rest of HL7. To this end, the T3F has created the following chart.


TDRelationships20070424.gif


The Technical Directorate (TD) and its four Steering Divisions (SD) are shown in relationship to the Board of Directors (BOD) on the right. The TD and SDs make up the "Working Group" of HL7, and the relationships between them are discussed in earlier sections of this document.

The left hand portion represents the employees of HL7 and the Staff of AMG, and these relationships are shown for example here and are not considered further in this report.

The committees and SIGs that make up three of the four SDs are entirely made up of volunteers and are formed by petition to and approval of the TD. (At present by the TSC.) The fourth SD, the Technical & Support Services Steering Division (ST on the chart) is made up of committees appointed by the TD, chaired by a volunteer, but made up of a mix of volunteers, employees and staff. Hence, they sit on the boundary between the Employees and Volunteers, as do the Board-appointed committees.

The most critical concept exposed by this chart, is that the TD, SDs and committees on the right, and the Staff and Employees on the left cannot be successful in their endeavors without robust productive collaboration between them. HL7 has always been fortunate to have minimal contention and maximum cooperation between its employees, staff and volunteers, and this T3F report is predicated on the continuation of that relationship.

Decision Making Practices

This section documents the proposed set of decision-making practices for the Technical Directorate, an elected and Board appointed Committee reporting to the HL7 Board. The TD will lead by example, and adhere to a set of decision-making practices that ensure consensus, openness, and balance of interest.

Furthermore, the practices as outlined here are designed to enable timely decision-making with an earnest attempt to ensure that input from all affected parties is considered. The Decision-making practices are intended to govern the standard operating procedures of the TD and are not intended to conflict with rules governing ballot procedure as defined by ANSI and the HL7 Bylaws and Policies and Procedures.

  1. Meetings are open to all interested parties including but not limited to members of HL7, HL7 affiliates, and guests of HL7 as referenced in the HL7 Bylaws – Article 3.02.

    Meetings of the TD are open to everyone to ensure that viewpoints of all affected parties have an opportunity to be shared and considered. Everyone may have an opportunity to speak; however, the chair may limit discussion to topics that have been identified during the setting of the meeting agenda, or due to time-constraints that may prevent completion of business. If discussion is truncated prior to resolution of the item under discussion, a future time for discussion will be set prior to moving to the next topic. Participants with submitted topics are expected to attend when the purpose or mode of the meeting require their input. Other HL7 members may be asked to attend to provide specific input regarding a particular issue. The following list identifies expected participation by meeting type. All TD meetings are open; this list simply identifies the anticipated participants.
    • Scheduled/Periodic conference call meetings are attended by persons registered on the TD email list.
    • TD Meetings during Working Group Meetings may be attended by any working group meeting attendee. Participants are asked to introduce themselves and identify the nature of their affiliation with HL7.

  2. Venues of Notification.

    All activities will be conducted in a public light with efforts made to ensure ample notification of those interested. The TD shall utilize two key venues to notify the interested membership of its activities: the TD's Wiki site and the TD's website.

    Satisfaction of minimal notification requirements dictates that relevant announcements/materials/etc. be posted to both the Wiki and the website. The Wiki will be used for discussion threads, notifications, new and archived documents, whereas the web server will predominantly be used for archival and document resources (decision documents, minutes, papers, etc.).

    Any use of the terms post, posted, or posting refers to notification subject to these constraints.

  3. Notification of meetings and the intended agenda is provided prior to the meeting.

    Binding decisions can be made only at meetings with the required advance notification; only recommendations and non-binding decisions can be made at special purpose meetings.

    The chair of the TD shall make every attempt to ensure that all parties with an interest in agenda topics are made aware of the meeting time and location subject to the documented notification requirements. As appropriate, TD activities will be cross-posted to other HL7 Wiki sites, depending upon the topic and type of meeting as indicated in the following list. Certain meetings are subject to Bylaws guidelines for notification. Please refer to the Bylaws for additional information.
    • Working group meeting agendas are posted in the meeting brochure. A preliminary agenda is developed by Wednesday of the prior working-group meeting and posted with the minutes within 2 weeks. The preliminary agenda is finalized on a scheduled conference call two weeks prior to the working group meeting and posted within 2 business days. Recognizing the dynamic nature of working group meetings, the agenda may require updates. Notification will be satisfied so long as at least two of the following venues are used:
      • E-mail notification by 6:00 pm local time the evening before the event
      • Notification on the bulletin board (near the registration desk) at least 2 quarters prior to the event
      • Announcement in the general session or lunch session prior to the event
    • Scheduled/Periodic telephone conference call meeting agendas are to be posted no later than 24 hours prior to the call. Preliminary agendas are to be determined at the close of each teleconference.
    • The agenda, for either a conference call or working group meeting, will include the purpose of each topic, anticipated discussion time and whether it is intended to set direction or to make a decision.
    • Should the TD require action between scheduled meetings there are two alternatives. First, a Special Purpose Meeting may be called as defined in the Bylaws (Section 11.04), which requires 30 days notice. Alternatively, the issues may be discussed as an informal group, bringing forward recommendations to the list or as a discussion topic for the next regularly scheduled TD meeting. Recommendations by the informal group are not binding decisions until acted upon by the TD.

  4. Decisions made at TD meetings are recorded in meeting minutes and posted.

    Minutes are recorded and posted for all TD meetings including the date, time, and location of the meeting, a list of attendees, the intended agenda, a brief summary of discussion topics, and the outcome of proposals made (including vote tallies if votes were taken).

    Minutes from a working group meeting will be posted no later than 2 weeks of the last day of the conference and in compliance with HQ deadlines; minutes from a conference call will be posted within one week of the call.

  5. Decisions made at non-working group meetings (conference calls and special purpose meetings) are summarized during the next working group meeting.

    In the interest of facilitating good communication among the TD members, those decisions that were made between working group meetings will be summarized and available at working group meetings. This communication will contain, at a minimum, abbreviated summary of the issues involved and the decisions made by the TD. Any TD decisions are subject to the practices documented elsewhere in this paper.

  6. . Quorum for TD meetings: For decision making, the chair (or designate) and at least five other TD members must be present, including at least two of the four elected sub-group chairs (or their alternates) . For direction setting, the chair (or designate) and at least four TD members must be present.

    Attendance for all meetings is recorded in the meeting minutes, including the participant name and constituency they represent. The recorder for the meeting is responsible for ensuring minutes are taken and posted. Due to the balanced makeup of the TD, "Preponderance of Influence" is not viewed as a substantive issue for the TD. The chair may cast a vote as a tie-breaker.

    In all circumstances, the TD can have no more than one presiding chair. All other TD members, act as regular voting members when not presiding. Unlike other HL7 technical committees or SIGs with multiple co-chairs, the chair shall not change within the course of a given meeting.

    Although any issue may be discussed within TD meeting venues at any time, binding actions cannot be taken without sufficient notification and quorum. Absence of either of these conditions allows the TD to issue recommendations that must subsequently be ratified by the TD subject to satisfying constraints placed upon binding decisions.

  7. Decisions made by the Technical Directorate are reached using a simple majority vote. The TD will always strive for consensus in decision-making.

    While decisions are made by simple majority vote, the TD shall endeavor to make its decisions via a consensus process. For a decision to be called consensus, it must receive two-thirds (66%) majority support. While determining if consensus is being reached, a variety of techniques may be used informally to assess the position of the group, including but not limited to straw poll, Robert's Rules of Order, seeking response to a hypothetical opposing view, and polling each participant to voice their position on the issue.

    When formal votes are taken appointed or elected TD members shall always receive a vote. For non-binding decisions only, all meeting participants may have the opportunity to vote at the discretion of the chair.

    Once voted, quorum is revisited to adjust for abstentions. Quorum must be met across yeah-s and neah-s for the vote to carry.

    It is recognized that revisiting previously made decisions inhibits TD progress and should be discouraged. That said, circumstances might exist that warrant re-opening of discussion on a previously visited issue. To dissuade this practice, such re-opening requires a formal motion, second, and simple majority affirmative vote of the TD as subject to the quorum rules in this document; however, in order for the decision to be considered binding, advance notification, as defined in this document, is required

  8. TD Members unable to participate in Directorate activities in person may not do so by proxy.

    The Technical Directorate does not recognize voting by proxy. There is ample opportunity to support or oppose proposals under consideration through TD Wiki discussions, email and conference calls. If a member feels strongly enough about a particular topic to want consideration by the TD, that member shall be present for the topic to be considered. The chair will be sensitive and considerate in attempting to accommodate schedules to ensure the member can be present at the appropriate venue.

    Note: The four TD members who serve as Representatives of a Steering Division each have an elected Alternate Representative who can attend and vote in TD meetings when the primary Representative is unable to attend. Votes by Alternate Representatives are not deemed to be proxy votes.

    Statement of Position. Those HL7 members wishing to establish a position on a topic under consideration by the TD in writing may do so subject to the notification requirements below. Statements of Position received prior-to or during the meeting will be shared by the chair as part of the discussion on the related topic. The chair has the responsibility to voice and represent these positions during relevant discussion, though they are not under obligation to support or defend them. These statements do not carry the weight of a vote and are included as informational items only for consideration by the TD. All Statements of Position received in electronic form will be included as attachments to the minutes.

  9. The TD shall rely upon Robert's Rules of Order in the event that formal guidance is needed or requested.

    The TD intends to ensure the effective and active engagement of all participants. To ensure fair and just participation, the TD shall follow its documented decision-making practices, falling-back upon Roberts Rules of Order in the event of a question or concern. Since Robert's Rules of Order provides formalism for addressing almost all matters of process, this provides a "backup mechanism" of formality in the event that it is required.

    It is the responsibility of the chair to guide the TD to an efficient and effective outcome. The TD shall follow, in this order of precedence, these Decision-making Practices (which cannot conflict with HL7 Policies and Procedures or the HL7 Bylaws), HL7 Policies and Procedures, the HL7 Bylaws, and Robert's Rules of Order. TD-established decision-making practices can refine the HL7 Policies and Procedures and Bylaws so long as they remain in accordance with those documents.

    In the event that an issue arises where formality is required and other guidance exists, Robert's Rules of Order shall take precedence. This provides a "common denominator" to keep in-check the power of the chair and to confirm the rights of all TD members.


Quorum Examples

Based upon PIC's Decision Making Practices Document version 1.3, adopted December 1, 2003.

  1. Simple scenario
    6 persons, including two elected subgroup representatives , attend a meeting, including the chair (or their designate).

    Quorum is established and the TD can conduct its business as usual. All participants are eligible for voting;

  2. Tie scenario
    6 persons, including two elected subgroup representatives,attend a meeting, including the chair (or their designate).

    Quorum is established and the TD can conduct its business as usual. In the event of a tie this will not constitute a consensus decision, because the consensus majority (66%) criterion has not been met.

  3. Non-representative scenario
    6 persons, not including two elected subgroup representatives, including the chair (or their designate).

    Quorum is not established and the TD cannot conduct official business, because two members representing an elected subgroup are not present.

Below is a quick reference for meeting configurations. (Note: this table does not have a direct correlation to the scenarios above.) .

Member Designation 1 2 3 4 5 6 7 8 9
Chair or Designate 1 1 1 1 1 1 1 1 1
Elected subgroup representatives 1 2 3 1 2 3 1 2 3
Other Voting TD members 3 2 2 4 3 2 5 4 1
Is a Quorum established? No No Yes No Yes Yes No Yes No


Tactical Plan to Establish Technical Directorate

The T3F recommends the following time-line to the HL7 Board for the establishment of the Technical Directorate. If the composition and election processes included in this report are approved by the Board before or during the Board's June Conference call, this schedule provides a reasonable time-line for carrying out the TD elections in time to allow the TD to hold its first meeting during the September 2007 Working Group Meeting in Atlanta. (Note that the staging of the nominations and elections are designed to allow the Affiliate constituencies to know who are the Steering Division Representatives before the Affiliate election process begins.)

May 2007 Working Group Meeting

  • T3F to present current recommendations for the formation of the TD.

May 31, 2007

June through August 2007

  • Three weeks for nominations of SD Representatives. (open June 5; close June 24)
  • Three weeks for election of SD Representatives. (close July 15)
  • Three weeks for nomination of Affiliate Representatives. (close Aug 5)
  • Three weeks for Affiliate Representative election.(close August 26)

September 2007

  • Board appoints its representative any time prior to September.

September 2007 Working Group Meeting

  • First official meeting of the TD. TD to elect a chair.
  • Terms will be staggered by drawing lots.

Project Plan for an HL7 Architecture

The initial guidance from the Strategic Initiative and the Board suggests that a completely defined, accessible Architecture for HL7 standards is an essential element to developing, promoting and maintaining the inter-operable standards to which HL7 aspires.

The T3F is in full agreement with this suggestion, yet has not found the band-width to do more than pay lip service to this need. This simply reflects inevitable trade-offs between tactical and strategic objectives. In this case, the tactical objective has been to get the Technical Directorate "off the ground."

In order to avoid having tactical issues continue to dominate, the T3F will prepare a Project Proposal in the near future to:

  • define HL7's objectives for a effective architecture,
  • do a "gap analysis" between what HL7 has today and what it seeks, and
  • recommend a specific plan of action to achieve the goal.

At one point, the T3F aspired to have a Project Proposal for review at the upcoming Working Group Meeting, but will not meet that objective. At this point it is the T3F's intent to develop such a proposal in coming weeks so that it might be available for Board review this summer.

In preparation for that effort, Berndt Blobel, a member of the T3F, has provided the following background material. It provides a glimpse of what is needed, and a cursory assessment of where HL7 stands in this regard.

Architecture for Inter-operable Health Information Systems

For establishing sustainable and semantically inter-operable health information systems, an appropriate architectural approach has to be developed, referring to approved knowledge and existing standards as much as possible.

Definition

An architecture of a system is a (formal) model of the real system, describing the system's components, their functions and relationships.

Architecture Characteristics

The architecture has to be

  • business-driven (for meeting user requirements and process needs),
  • following a unified process (for definition, design, implementation, evaluation, testing, and maintenance to support semantic interoperability),
  • service-oriented (for meeting business requirements and users' expectations (acceptance) by serving the users' business processes, based on domain knowledge expressed in corresponding concepts and aggregation schemes),
  • model-driven (separating computation-independent models, platform-independent models, and platform-specific models for enabling portability, flexibility, and semantic interoperability),
  • component-oriented (for supporting scalability and flexibility),
  • lawful (for providing user acceptance and trust).

Model Characteristics

In that context, models as reality representation, communication tools, and representations of business interests, intentions, etc., have to possess certain characteristics such as

  • the separation of computation-independent models, platform-independent models, and platform-specific models, always starting with the business model and tackling all views of the ISO 10746 Open Distributing Processing reference model,
  • deriving the models by constraining reference models for information and processes,
  • the consideration of structural and behavioral aspects of the considered system (reflecting the semantic and the pragmatic aspect of information),
  • the provision of appropriate concept representations including the aggregation schemes (rules) at different aggregation levels,
  • the deployment of appropriate (reference) terminologies and ontologies.

HL7's Position in This Space

For those who have wrestled with "Version 3" for the last decade, these are familiar concepts and objectives, most of which have been recognized and some of which have been addressed, if not fully achieved.

For example, HL7 meets some but not all of the paradigms for establishing sustainable and semantically inter-operable health information systems, defined in the Generic Component Model, such as:

  • Component orientation and the distribution paradigm;
  • Unified process of definition, design, implementation, evaluation, testing, and maintenance;
  • Common reference models for information and processes;
  • Common terminologies and ontologies;
  • Separation of logical and technological views by platform-independent and platform-specific models, respectively;
  • Specification of the components' structure and behavior as well as of the rules being applied based on knowledge, concepts and contexts;
  • Enhanced security and privacy services.

HL7 has developed an advanced unified process, the HDF. It provides a model-driven approach, a vocabulary with references to existing terminologies. It is component-oriented at different levels of granularity. HL7 V3 describes most (in future perhaps all) views of the RM-ODP, starting with business requirements (e.g. EHR-S Functional Model), business process models (e.g. Templates, SOA), and thus is, step by step, establishing a service-oriented architecture.

The most obvious weaknesses are immature development in some areas and missing integration between the paradigms and methodologies needed for establishing a sustainable architecture. This is a question of time and development, and the project to be proposed will seek to define how much time, and how much development.