2015-03-23 TSC Call Agenda

From HL7 TSC
Jump to navigation Jump to search

TSC Agenda/Minutes

Meeting Info/Attendees

Standing Conference Calls

TSC will hold a Conference Call at 11AM Eastern time, each Monday except during scheduled face-to-face Working Group Meetings unless otherwise noted at TSC_Minutes_and_Agendas.

GoToMeeting at https://global.gotomeeting.com/join/426505829 using VOIP
For those without access to microphone/speakers:
US: +1 (224)501-3318
Canada: +1 (647)497-9379
Italy: +39 0 230 57 81 80
Access Code: 426-505-829
GoToMeeting ID: 426-505-829
HL7 TSC Meeting Minutes

Location: call 770-657-9270 using code 985371#
NEW GoToMeeting ID: 426-505-829

Date: 2015-03-23
Time: 11:00 AM U.S. Eastern
Facilitator: Ken McCaslin Note taker(s): Anne Wizauer
Quorum = chair + 5 including 2 SD represented yes/no
Chair/CTO ArB International Affiliate Rep Ad-Hoc
. Ken McCaslin . Tony Julian . Jean Duteau .
. John Quinn Regrets Lorraine Constable . Giorgio Cangioli .
Domain Experts Foundation and Technology Structure and Semantic Design Technical and Support Services
. Melva Peters Regrets Woody Beeler . Calvin Beebe . Freida Hall
. John Roberts . Paul Knapp . Pat van Dyke . Andy Stechishin
. Russ Hamm . .
ex officio Invited Guests Observers HL7 Staff
. Stan Huff (HL7 Chair) w/vote . Craig Gabron, Attachments WG . obs1 . Anne Wizauer
. Chuck Jaffe (CEO) vote . . . obs2 .


. . . . .

Agenda

Housekeeping

  1. Introduction of visitors (including declaration of interests)
  2. Agenda review and approval -
  3. Approve Minutes of 2015-03-16 TSC Call Agenda
  4. Homework
    • Proposed changes to GOM from ArB:
    09.01 The Technical Steering Committee (TSC)
    A Technical Steering Committee (TSC) shall be established to facilitate the coordination and activities of the Working Group. It shall be comprised of the Co-Chairs from each of the four Steering Divisions (SD), two Affiliate representatives, and appropriate HL7 staff. The SD Co-Chairs shall share a single vote at the TSC for the purposes of formal motions; but otherwise both will be fully participating members of the TSC. The Chief Technology Officer (CTO) as well as the ARB Chair and Vice Chair Co-Chairs of the Architecture Review Board (ARB) shall be ex officio members with vote. The ARB Chair and Vice Chair ARB Co-Chairs shall share a single vote on formal motions.
    09.03.01 Composition
    The ARB shall have a Chair and Vice Chair two Co-Chairs, who shall continue the business of the ARB in the Chair’s absence, appointed by the Chief Technology Officer (CTO) with the approval of the TSC. The ARB shall have such additional members as deemed appropriate by the CTO, ARB Chair and Vice Chair ARB Co-Chairs to support productivity and task load based on the availability of willing candidates with appropriate skill sets subject to TSC approval.
    There shall be no formal constraints or requirements for representation of any Work Group, Steering Division, or Organizational or Affiliate member. ARB candidates shall be chosen by the CTO, ARB Chair and Vice Chair ARB Co-Chairs. The TSC shall ensure that appointments to the ARB are consistent with the goals and objectives currently defined for the ARB and best serve the interests and responsibilities of HL7. While it is desirable that the ARB be representative of all the various communities involved in HL7, the CTO and TSC formally acknowledge that the primary criteria for ARB membership are qualifications and commitment of time and effort.
    The ARB may, at its discretion, solicit the contribution of specific expertise in support of its activities by inviting select individuals to participate as ad hoc members with vote for the term of the specific activity or project.
    09.03.02 Criteria for Membership
    09.03.02.01 Qualifications
    Candidates for membership in the ARB must recognize the importance of, and have a commitment to, enterprise architecture as a critical success factor for HL7. They must be current members of HL7 or an HL7 Affiliate with strong written and verbal communication skills and expertise in at least one, but preferably both, of the following areas as assessed by the CTO:
    1. Large scale enterprise-level architecture contexts with a focus on achieving working interoperability between software components/interfaces in both intra- and inter-enterprise contexts. Interoperability contexts include both traditional “messaging” exchanges of static semantics as well as more complex, multi-component scenarios involving both static semantics and dynamic behavioral interactions.
    2. HL7 “core infrastructure” components including complex data types, vocabulary binding, structured documents, methodology and modeling, infrastructure and messaging, implementation and conformance, etc.
    09.03.02.02 Commitment
    Candidates shall provide documentation of support for their participation on the ARB from their employers or a like statement of their personal commitment if individual members of HL7. Members of the ARB are expected to:
    a. participate in 75% of weekly conference calls
    a. Attend a majority of weekly conference calls.
    b. dedicate 6 - 10 hours each week, in addition to conference calls, to ArB deliverables
    b. demonstrate active participation through some combination of the following:
    Meaningful contribution to deliverables through authoring , modeling or review.
    Individuals provide expertise that can be drawn upon when needed.
    c. attend at least two of the three Working Group Meetings each year
    The CTO of HL7 may, at his/her discretion, grant a waiver of the WGM attendance requirement to any ARB member in good standing who has encountered hardship (e.g. lack of funding) in attending Working Group meetings provided either 9.03.02.02a or 09.03.02.02b are met.
    09.03.02.03 Trial Participation
    Candidates wishing to be considered for full membership in the ARB may be expected or invited to participate in ARB discussions as ad hoc individuals prior to becoming a full member to ensure their ability to meet the expected commitments and demonstrate the appropriate qualifications. This will allow ‘new’ HL7 members to fully participate in the ARB and contribute to the work even if they are not yet personally known by the CTO, ARB Chair or Vice Chair ARB Co-Chairs.
    09.03.03 Term of Membership
    The CTO, ARB Chair and Vice Chair ARB Co-Chairs shall consider staggering appointments to the ARB to ensure continuity of knowledge of recent history and ongoing goals and objectives of the ARB.
    '09.03.03.01 ARB Chair and Vice Chair ARB Co-Chairs'
    There shall be no limit on the duration of service of the ARB Chair and Vice Chair ARB Co-Chairs subject to the approval of the TSC.
    09.03.03.02 Other Members
    All members of the ARB shall serve a two year term from date of appointment, without term limits, subject to renewal at the discretion of the CTO, ARB Chair and Vice Chair ARB Co-Chairs with the approval of the TSC.
    09.03.03.03 Notification of Renewal
    The CTO shall provide two months’ notice to the HL7 membership and HL7 Affiliates when certain ARB appointments are subject to renewal. Comments relevant to the renewal action may be submitted during this period for consideration by the CTO, ARB Chair and Vice Chair ARB Co-Chairs prior to making their recommendations on renewal to the TSC.
    09.03.05 Removal of Member
    Any ARB member who – in the opinion of the CTO, ARB Chair or Vice Chair or ARB Co-Chairs -- is unable to satisfy the expected commitment based on both meeting attendance records and general effectiveness of participation may, with approval by the TSC, be removed from the ARB at any point during their term.
    09.03.06 Conduct of Meetings
    All ARB meetings shall be open to any interested party. Minutes shall be taken at all meetings and posted on the ARB wiki. HL7 and the SDO community in general are free to comment, criticize, or raise additional issues.

Governance

  1. Approval items:
  2. Discussion topics:
    • HL7 Standards Governance Board Mission & Charter progress update (Paul)
    • Approval Request for the formation of the FHIR Core WG at TSC Tracker 5943. (This item for discussion only today, with TSC vote tentatively scheduled for 2015-04-06)

Management

  1. Review action items
  2. Approval items from last week's e-vote:
  3. Approval items (for discussion):
    • FHIR request for extension of deadline to submit reconciliation package for draft for comment ballot
  4. Discussion topics:
    • Proposed changes to the GOM by ArB
      • MOTION by John Quinn to accept changes to the GOM as outlined
    • Wiki review of FHIR Balloting Process Pilot - Comment period ended Friday
    • Attachments Collaboration Project (Paul)
    • WG Co-Chairs Not Working Within Process (Paul, John Roberts, Melva, Pat)
    • FHIR Ballot Reconciliation Process (Lorraine/Paul)
  5. Reports: (attach written reports below from Steering Divisions et al.)
  6. Open Issues List

Minutes

Minutes/Conclusions Reached:


Next Steps

Actions (Include Owner, Action Item, and due date)
  • .
Next Meeting/Preliminary Agenda Items


© 2014 Health Level Seven® International. All rights reserved.