Difference between revisions of "2011-06-13 TSC Call Minutes"

From HL7 TSC
Jump to navigation Jump to search
(Created page with '{{subst::TSC_Minutes_template}}')
 
m (moved 2011-06-13 TSC Call Agenda to 2011-06-13 TSC Call Minutes: Minutes approved 6/20/2011)
 
(11 intermediate revisions by the same user not shown)
Line 2: Line 2:
 
==TSC Agenda/Minutes ==
 
==TSC Agenda/Minutes ==
  
<!--FOR WGM: NOTE for TSC Agenda Saturday and Sunday
+
 
* * * Guests are asked to make alternate arrangements for the meal, or respect the opportunity for TSC members to dine first as the food provided is for elected TSC members and invited guests noted on the agenda * * *
 
-->
 
<!--
 
  EDITORS - When converting the content from Agenda to minuets:
 
  1) Delete the string "|Agenda Template" from   
 
        [[Category:2011 TSC Minutes|Agenda Template]] below
 
  2) Delete the Logistics template reference
 
        {{:TSC Meetings}}  below
 
-->
 
 
===Meeting Info/Attendees===
 
===Meeting Info/Attendees===
{{:TSC Meetings}}
+
   [[Category:2011 TSC Minutes]]
   [[Category:2011 TSC Minutes|Agenda Template]]
 
  
 
{|border="1" cellpadding="2" cellspacing="0"  
 
{|border="1" cellpadding="2" cellspacing="0"  
 
| width="0%" colspan="2" align="left" style="background:#f0f0f0;"|'''HL7 TSC Meeting Minutes''' <br/>
 
| width="0%" colspan="2" align="left" style="background:#f0f0f0;"|'''HL7 TSC Meeting Minutes''' <br/>
 
'''Location: call 770-657-9270 using code 124466#'''<br/> GoToMeeting ID: [https://www.gotomeeting.com/join/165215206 165-215-206 ]
 
'''Location: call 770-657-9270 using code 124466#'''<br/> GoToMeeting ID: [https://www.gotomeeting.com/join/165215206 165-215-206 ]
| width="0%" colspan="1" align="left" style="background:#f0f0f0;"|'''Date: CCYY-MM-DD '''<br/> '''Time: 11:00 AM U.S. Eastern'''
+
| width="0%" colspan="1" align="left" style="background:#f0f0f0;"|'''Date: 2011-06-13 '''<br/> '''Time: 11:00 AM U.S. Eastern'''
 
|-
 
|-
 
| width="0%" colspan="2" align="right"|'''Facilitator''': Austin Kreisler
 
| width="0%" colspan="2" align="right"|'''Facilitator''': Austin Kreisler
Line 25: Line 15:
 
|}
 
|}
  
<!--or use subst::TSC_roster-->
 
 
{|border="1" cellpadding="2" cellspacing="0"  
 
{|border="1" cellpadding="2" cellspacing="0"  
 
|-
 
|-
Line 34: Line 23:
 
|width="0%"|'''Affiliation'''
 
|width="0%"|'''Affiliation'''
 
|-
 
|-
|?||Calvin Beebe||HL7 SSD SD Co-Chair
+
|x||Calvin Beebe||HL7 SSD SD Co-Chair
 
|-
 
|-
|?||Woody Beeler||HL7 FTSD Co-Chair
+
|x||Woody Beeler||HL7 FTSD Co-Chair
 
|-
 
|-
|?||Bob Dolin||HL7 Board Chair
+
| ||Bob Dolin||HL7 Board Chair
 
|-
 
|-
|?||Tony Julian||HL7 FTSD Co-Chair
+
|x||Tony Julian||HL7 FTSD Co-Chair
 
|-
 
|-
|?||Austin Kreisler||HL7 TSC Chair, DESD Co-Chair
+
|x||Austin Kreisler||HL7 TSC Chair, DESD Co-Chair
 
|-
 
|-
|?||Lynn Laakso ||HL7 staff support
+
|x||Lynn Laakso ||HL7 staff support
 
|-
 
|-
|?||Patrick Loyd|| HL7 T3SD Co-Chair
+
|x ||Patrick Loyd|| HL7 T3SD Co-Chair
 
|-
 
|-
|?||Ken McCaslin||HL7 T3SD Co-Chair
+
|x ||Ken McCaslin||HL7 T3SD Co-Chair
 
|-
 
|-
|?||Charlie Mead||HL7 ArB Chair
+
|regrets||Charlie Mead||HL7 ArB Chair
 
|-
 
|-
|?||Ravi Natarajan||HL7 Affiliate Representative
+
|regrets ||Ravi Natarajan||HL7 Affiliate Representative
 
|-
 
|-
|?||Ron Parker||HL7 ArB Alternate
+
|regrets||Ron Parker||HL7 ArB Alternate
 
|-
 
|-
|?||John Quinn||HL7 CTO
+
|x||John Quinn||HL7 CTO
 
|-
 
|-
|?||Gregg Seppala||HL7 SSD SD Co-Chair
+
|x||Gregg Seppala||HL7 SSD SD Co-Chair
 
|-
 
|-
|?||Ed Tripp||HL7 DESD Co-Chair
+
|x||Ed Tripp||HL7 DESD Co-Chair
 
|-
 
|-
|?||Jay Zimmerman || HL7 Affiliate Representative
+
| ||Jay Zimmerman || HL7 Affiliate Representative
 
|-
 
|-
 
| || ||  
 
| || ||  
Line 74: Line 63:
 
{|border="1" cellpadding="2" cellspacing="0"  
 
{|border="1" cellpadding="2" cellspacing="0"  
 
|-
 
|-
|colspan="3" |'''Quorum Requirements (Chair +5 with 2 SD Reps) Met: '''(yes/No)
+
|colspan="3" |'''Quorum Requirements (Chair +5 with 2 SD Reps) Met: '''yes
 
|-
 
|-
 
|}
 
|}
Line 81: Line 70:
 
#Introduction of visitors (including declaration of interests)
 
#Introduction of visitors (including declaration of interests)
 
#Agenda review and approval - Austin Kreisler
 
#Agenda review and approval - Austin Kreisler
#Approve Minutes
+
#Approve Minutes of [[2011-06-06 TSC Call Agenda]]
 
#Review [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=494 action items] –
 
#Review [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=494 action items] –
 +
#*action items from WGM:
 +
#**Calvin to check with the Cochairs of Structured Documents on naming for what title they want to use when they go beyond DSTU for an Implementation Guide.
 +
#**Austin and Patrick will check on the 2.x side on an implementation profile term.
 +
#**Patrick will look for his mapping of NCPDP to the RIM and let us know.
 +
#**Woody will coordinate with John on HL7 and ISO process wrt the RIM.
 
<!--              -->
 
<!--              -->
 
<!--    Approvals  -->
 
<!--    Approvals  -->
 
#Approval items:
 
#Approval items:
 +
#*'''Motion:''' Approve [http://gforge.hl7.org/gf/download/trackeritem/1949/8435/HL7_Project_Scope_Statement_NTDBv2.doc Project Scope Statement] for Trauma Data Exchange Domain Analysis Model for CIC of DESD, at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=774 Project Insight # 774], [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=1949&start=0 TSC Tracker # 1949]. Co-sponsored by Patient Care and Emergency Care Work Groups
 +
#*'''Motion:''' Approve [http://gforge.hl7.org/gf/download/trackeritem/1953/8437/PHER_PSS_HQMF_Reporting.doc Project Scope Statement] for Adding Public Health Reporting Requirements to HQMF, for PHER of DESD and SDWG of SSD SD, at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=784 Project Insight # 784], [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=1953&start=0 TSC Tracker # 1953]
 
<!--              -->
 
<!--              -->
 
<!--  Discussion  -->
 
<!--  Discussion  -->
 
#Discussion topics:  
 
#Discussion topics:  
 +
#*(May) Review, update, and develop new entries for TSC Three-Year Plan
 +
#** For example, from [http://gforge.hl7.org/gf/download/docmanfileversion/6329/8444/TSC_Strategic_Initiatives_20110531.doc TSC Strategic Initiative Dashboard measures], in the WGM minutes: Strategic Initiative measures 4.2.8, .9, .10 are all on cross-artifact consistency to identify measurements for cross-artifact consistency for 2011 and .9 the plan for 2012, and .10 for 2013 in three-year plan
 +
#*Work Group Health metrics
 +
#** review [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=616 suggestions]
 +
#**#Add metrics to WGH for % of projects having next milestone date in the past ([http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=1649 Tracker # 1649])
 +
#**#:Status as of 2010Oct: Evaluate Project Health before tying this to Work Group Health
 +
#**#Add participation in publishing calls to Work Group Health ([http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=1659 Tracker # 1659])
 +
#**#Measure ballot progress in terms of overall years and in number of cycles to successful ballot ([http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=1660 Tracker # 1660])
 +
#**# Metric to identify whether the WG follows their own DMPs re: posting minutes ([http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=1683 Tracker # 1683])
 +
#**#measure coordination between WG co-chairs ([http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=1731 Tracker # 1731])
 +
#**#WG has a DMP based on review of the updated template, for 2011May ([http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=1732 Tracker # 1732]) - in effect this cycle.
 +
#**#Work Groups responding to submit meeting room request form before the deadline. ([http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=1946 Tracker # 1946]
 +
#**#Create a Project Report Card ([http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=1819 Tracker # 1819])
 +
#*TSC Communication Strategy at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=696 Project Insight ID # 696]
 +
#*Strategic Initiative feedback- does the TSC wish to offer any further feedback?
 +
#*Review of Ballot Guidance post-2011May WGM - see [http://gforge.hl7.org/gf/download/docmanfileversion/6330/8445/BallotGuidance_post2011MayWGM.doc draft document]
 
#Reports: (attach written reports below from Steering Divisions et al.)
 
#Reports: (attach written reports below from Steering Divisions et al.)
 +
#*ArB - Charlie reports 'The update is that the ArB has defined a schedule to produce for the TSC the promised V1 of SAIF (revised text from Information ballot that passed in the last cycle) and candidate V2 of SAIF to be submitted for DSTU ballot in the September ballot cycle.'
 
<!-- #WGM Planning - -->
 
<!-- #WGM Planning - -->
 
#[http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=313 Open Issues List]
 
#[http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=313 Open Issues List]
Line 96: Line 109:
 
'''Supporting Documents'''<br/>
 
'''Supporting Documents'''<br/>
 
*See links
 
*See links
 +
 
===Minutes===
 
===Minutes===
 
'''Minutes/Conclusions Reached:'''<br/>
 
'''Minutes/Conclusions Reached:'''<br/>
 +
#Introduction of visitors (including declaration of interests) – none identified themselves.
 +
#Agenda review and approval - Austin Kreisler
 +
#*Agenda approved by general consent
 +
#Approve Minutes of [[2011-06-06 TSC Call Agenda]]
 +
#* Unanimously approved
 +
#Review [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=494 action items] –
 +
#*action items from WGM:
 +
#**Calvin to check with the Cochairs of Structured Documents on naming for what title they want to use when they go beyond DSTU for an Implementation Guide.
 +
#**:Calvin still needs to pick that up.
 +
#**Austin and Patrick will check on the 2.x side on an implementation profile term.
 +
#**:Briefly discussed in OO but did not determine.
 +
#**Patrick will look for his mapping of NCPDP to the RIM and let us know.
 +
#**:Patrick expects to look for this next week.
 +
#**Woody will coordinate with John on HL7 and ISO process wrt the RIM.
 +
#**:John and Woody wish to defer the RIM discussion until they have the general process figured out with ISO – defer one month.
 +
<!--              -->
 +
<!--    Approvals  -->
 +
#Approval items:
 +
#*'''Motion:''' Approve [http://gforge.hl7.org/gf/download/trackeritem/1949/8435/HL7_Project_Scope_Statement_NTDBv2.doc Project Scope Statement] for Trauma Data Exchange Domain Analysis Model for CIC of DESD, at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=774 Project Insight # 774], [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=1949&start=0 TSC Tracker # 1949]. Co-sponsored by Patient Care and Emergency Care Work Groups
 +
#**Ed reviews the project.
 +
#*'''Vote:''' Unanimously approved
 +
#*'''Motion:''' Approve [http://gforge.hl7.org/gf/download/trackeritem/1953/8437/PHER_PSS_HQMF_Reporting.doc Project Scope Statement] for Adding Public Health Reporting Requirements to HQMF, for PHER of DESD and SDWG of SSD SD, at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=784 Project Insight # 784], [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=1953&start=0 TSC Tracker # 1953]
 +
#**Austin clarifies that this is essentially a revision to the existing DSTU
 +
#*'''Vote:''' Unanimously approved.
 +
<!--              -->
 +
<!--  Discussion  -->
 +
#Discussion topics:
 +
#*(May) Review, update, and develop new entries for TSC Three-Year Plan
 +
#** For example, from [http://gforge.hl7.org/gf/download/docmanfileversion/6329/8444/TSC_Strategic_Initiatives_20110531.doc TSC Strategic Initiative Dashboard measures], in the WGM minutes: Strategic Initiative measures 4.2.8, .9, .10 are all on cross-artifact consistency to identify measurements for cross-artifact consistency for 2011 and .9 the plan for 2012, and .10 for 2013 in three-year plan
 +
#**Do we want to provide any further feedback on the Strategic Initiatives, and by when?
 +
#**Austin thinks we need to create a plan to do this review, perhaps even create a project. Austin and John will work on a project for this, with staff support. Draft to the TSC in a week or two.
 +
#*Ken joins. 
 +
#*Work Group Health metrics
 +
#** review [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=616 suggestions]
 +
#**#Add metrics to WGH for % of projects having next milestone date in the past ([http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=1649 Tracker # 1649])
 +
#**#:Status as of 2010Oct: Evaluate Project Health before tying this to Work Group Health
 +
#**#Add participation in publishing calls to Work Group Health ([http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=1659 Tracker # 1659])
 +
#**#Measure ballot progress in terms of overall years and in number of cycles to successful ballot ([http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=1660 Tracker # 1660])
 +
#**# Metric to identify whether the WG follows their own DMPs re: posting minutes ([http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=1683 Tracker # 1683])
 +
#**#:Discussion reviewed past conversation on this potential measure. It would be very time consuming to audit. Close tracker.
 +
#**#measure coordination between WG co-chairs ([http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=1731 Tracker # 1731])
 +
#**#:This would be difficult and intrusive. Close tracker.
 +
#**#WG has a DMP based on review of the updated template, for 2011May ([http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=1732 Tracker # 1732]) - in effect this cycle.
 +
#**#:Ed asks that a DMP review in the past 12 months should be sufficient even if not the most recent template. Lynn clarifies that the DMP template on the metric was published from 2010May and being scored as of 2011May.
 +
#**#Work Groups responding to submit meeting room request form before the deadline. ([http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=1946 Tracker # 1946]
 +
#**#:This deadline is just a week after the WGM. Calvin would like to see two weeks for cochairs to respond to the meeting space request.
 +
#**#Create a Project Report Card ([http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=1819 Tracker # 1819])
 +
#**#:This measure and the first measure seem like they would be the best ones to add, notes Austin. Ed feels a general project health score, cumulative to all the project health measures, would be appropriate on the Work Group Health. Woody notes that we meant to start project health as a helpful tool to manage their projects, not as a score card. For now we want work groups to use project health as a tool and somewhere down the line we might incorporate that into work group health scoring. Austin and Ed agree.
 +
#**#:We may not necessarily need to tweak anything at this point to continue to make things visible.
 +
#***Austin summarizes to say that nothing on this list is really jumping out to be added. Accepted by general consent.
 +
#*TSC Communication Strategy at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=696 Project Insight ID # 696]
 +
#**Ravi and Jay are not on the phone. Defer.
 +
#*Strategic Initiative feedback- does the TSC wish to offer any further feedback?
 +
#**Do we want to provide additional formal feedback to the Board on Strategic Initiatives? The TSC agreed in Orlando to develop some sort of dashboard for measures the TSC has control over. Ken feels we should let the Board know we are actually responding to the initiatives. We should let them know we’ll be working on a dashboard. Austin thinks that we should create the project statement first and then use that to communicate the TSC’s intent to the Board. ACTION ITEM: Austin and John to draft the project for the SI Criteria Measure Dashboard.
 +
#*Review of Ballot Guidance post-2011May WGM - see [http://gforge.hl7.org/gf/download/docmanfileversion/6330/8445/BallotGuidance_post2011MayWGM.doc draft document]
 +
#**Ken notes that Project Services also had a [http://www.hl7.org/documentcenter/public/wg/projectServices/HL7%20PS%20-%20Electronic%20Ballot%20Chart%20-%20Final.pdf balloting guidance chart]. TSC has not reviewed that document. Woody notes that neither document really addresses the question TSC’s been asked for how to tell Work Groups to choose their ballot level. Dave’s document has a section for each kind of ballot versus the standards types. Lynn will re-send both documents to the TSC list. We may be looking at a new document that incorporates both of these. One might triage your ballot artifact type from Ed’s list and then go to Dave’s list to figure out what you have to do.
 +
#**Bring the documents back next week and figure out how to merge them. There is little on next week’s agenda so far, we may be able to provide some time to discuss.
 +
#Reports: (attach written reports below from Steering Divisions et al.)
 +
#*ArB - Charlie reports 'The update is that the ArB has defined a schedule to produce for the TSC the promised V1 of SAIF (revised text from Information ballot that passed in the last cycle) and candidate V2 of SAIF to be submitted for DSTU ballot in the September ballot cycle.'
  
 +
Adjourned 11:49 AM EDT.
  
'''''Please don't forget to hang up from the conference call '' (VOIP users)'''
 
 
===Next Steps===
 
===Next Steps===
 
{|border="1" cellpadding="2" cellspacing="0"  
 
{|border="1" cellpadding="2" cellspacing="0"  
 
|-
 
|-
 
|colspan="4" |'''Actions''' ''(Include Owner, Action Item, and due date)''<br/>
 
|colspan="4" |'''Actions''' ''(Include Owner, Action Item, and due date)''<br/>
* .
+
* Austin and John will work on a project for the TSC Strategic Initiative Measures Dashboard, with staff support.
 +
* Lynn will re-send both the Ballot Guidelines revised document from Ed and the Project Services ballot guidance documents to the TSC list for review on next week’s call.
 
|-
 
|-
 
|colspan="4" |'''Next Meeting/Preliminary Agenda Items'''<br/>
 
|colspan="4" |'''Next Meeting/Preliminary Agenda Items'''<br/>
*.
+
*see [[2011-06-20 TSC Call Agenda]]
 
|}
 
|}

Latest revision as of 01:26, 28 June 2011

TSC Agenda/Minutes

Meeting Info/Attendees

HL7 TSC Meeting Minutes

Location: call 770-657-9270 using code 124466#
GoToMeeting ID: 165-215-206

Date: 2011-06-13
Time: 11:00 AM U.S. Eastern
Facilitator: Austin Kreisler Note taker(s): Lynn Laakso
Attendee Name Affiliation
x Calvin Beebe HL7 SSD SD Co-Chair
x Woody Beeler HL7 FTSD Co-Chair
Bob Dolin HL7 Board Chair
x Tony Julian HL7 FTSD Co-Chair
x Austin Kreisler HL7 TSC Chair, DESD Co-Chair
x Lynn Laakso HL7 staff support
x Patrick Loyd HL7 T3SD Co-Chair
x Ken McCaslin HL7 T3SD Co-Chair
regrets Charlie Mead HL7 ArB Chair
regrets Ravi Natarajan HL7 Affiliate Representative
regrets Ron Parker HL7 ArB Alternate
x John Quinn HL7 CTO
x Gregg Seppala HL7 SSD SD Co-Chair
x Ed Tripp HL7 DESD Co-Chair
Jay Zimmerman HL7 Affiliate Representative


Quorum Requirements (Chair +5 with 2 SD Reps) Met: yes

Agenda

Agenda Topics

  1. Introduction of visitors (including declaration of interests)
  2. Agenda review and approval - Austin Kreisler
  3. Approve Minutes of 2011-06-06 TSC Call Agenda
  4. Review action items
    • action items from WGM:
      • Calvin to check with the Cochairs of Structured Documents on naming for what title they want to use when they go beyond DSTU for an Implementation Guide.
      • Austin and Patrick will check on the 2.x side on an implementation profile term.
      • Patrick will look for his mapping of NCPDP to the RIM and let us know.
      • Woody will coordinate with John on HL7 and ISO process wrt the RIM.
  5. Approval items:
  6. Discussion topics:
    • (May) Review, update, and develop new entries for TSC Three-Year Plan
      • For example, from TSC Strategic Initiative Dashboard measures, in the WGM minutes: Strategic Initiative measures 4.2.8, .9, .10 are all on cross-artifact consistency to identify measurements for cross-artifact consistency for 2011 and .9 the plan for 2012, and .10 for 2013 in three-year plan
    • Work Group Health metrics
      • review suggestions
        1. Add metrics to WGH for % of projects having next milestone date in the past (Tracker # 1649)
          Status as of 2010Oct: Evaluate Project Health before tying this to Work Group Health
        2. Add participation in publishing calls to Work Group Health (Tracker # 1659)
        3. Measure ballot progress in terms of overall years and in number of cycles to successful ballot (Tracker # 1660)
        4. Metric to identify whether the WG follows their own DMPs re: posting minutes (Tracker # 1683)
        5. measure coordination between WG co-chairs (Tracker # 1731)
        6. WG has a DMP based on review of the updated template, for 2011May (Tracker # 1732) - in effect this cycle.
        7. Work Groups responding to submit meeting room request form before the deadline. (Tracker # 1946
        8. Create a Project Report Card (Tracker # 1819)
    • TSC Communication Strategy at Project Insight ID # 696
    • Strategic Initiative feedback- does the TSC wish to offer any further feedback?
    • Review of Ballot Guidance post-2011May WGM - see draft document
  7. Reports: (attach written reports below from Steering Divisions et al.)
    • ArB - Charlie reports 'The update is that the ArB has defined a schedule to produce for the TSC the promised V1 of SAIF (revised text from Information ballot that passed in the last cycle) and candidate V2 of SAIF to be submitted for DSTU ballot in the September ballot cycle.'
  8. Open Issues List


Supporting Documents

  • See links

Minutes

Minutes/Conclusions Reached:

  1. Introduction of visitors (including declaration of interests) – none identified themselves.
  2. Agenda review and approval - Austin Kreisler
    • Agenda approved by general consent
  3. Approve Minutes of 2011-06-06 TSC Call Agenda
    • Unanimously approved
  4. Review action items
    • action items from WGM:
      • Calvin to check with the Cochairs of Structured Documents on naming for what title they want to use when they go beyond DSTU for an Implementation Guide.
        Calvin still needs to pick that up.
      • Austin and Patrick will check on the 2.x side on an implementation profile term.
        Briefly discussed in OO but did not determine.
      • Patrick will look for his mapping of NCPDP to the RIM and let us know.
        Patrick expects to look for this next week.
      • Woody will coordinate with John on HL7 and ISO process wrt the RIM.
        John and Woody wish to defer the RIM discussion until they have the general process figured out with ISO – defer one month.
  5. Approval items:
  6. Discussion topics:
    • (May) Review, update, and develop new entries for TSC Three-Year Plan
      • For example, from TSC Strategic Initiative Dashboard measures, in the WGM minutes: Strategic Initiative measures 4.2.8, .9, .10 are all on cross-artifact consistency to identify measurements for cross-artifact consistency for 2011 and .9 the plan for 2012, and .10 for 2013 in three-year plan
      • Do we want to provide any further feedback on the Strategic Initiatives, and by when?
      • Austin thinks we need to create a plan to do this review, perhaps even create a project. Austin and John will work on a project for this, with staff support. Draft to the TSC in a week or two.
    • Ken joins.
    • Work Group Health metrics
      • review suggestions
        1. Add metrics to WGH for % of projects having next milestone date in the past (Tracker # 1649)
          Status as of 2010Oct: Evaluate Project Health before tying this to Work Group Health
        2. Add participation in publishing calls to Work Group Health (Tracker # 1659)
        3. Measure ballot progress in terms of overall years and in number of cycles to successful ballot (Tracker # 1660)
        4. Metric to identify whether the WG follows their own DMPs re: posting minutes (Tracker # 1683)
          Discussion reviewed past conversation on this potential measure. It would be very time consuming to audit. Close tracker.
        5. measure coordination between WG co-chairs (Tracker # 1731)
          This would be difficult and intrusive. Close tracker.
        6. WG has a DMP based on review of the updated template, for 2011May (Tracker # 1732) - in effect this cycle.
          Ed asks that a DMP review in the past 12 months should be sufficient even if not the most recent template. Lynn clarifies that the DMP template on the metric was published from 2010May and being scored as of 2011May.
        7. Work Groups responding to submit meeting room request form before the deadline. (Tracker # 1946
          This deadline is just a week after the WGM. Calvin would like to see two weeks for cochairs to respond to the meeting space request.
        8. Create a Project Report Card (Tracker # 1819)
          This measure and the first measure seem like they would be the best ones to add, notes Austin. Ed feels a general project health score, cumulative to all the project health measures, would be appropriate on the Work Group Health. Woody notes that we meant to start project health as a helpful tool to manage their projects, not as a score card. For now we want work groups to use project health as a tool and somewhere down the line we might incorporate that into work group health scoring. Austin and Ed agree.
          We may not necessarily need to tweak anything at this point to continue to make things visible.
        • Austin summarizes to say that nothing on this list is really jumping out to be added. Accepted by general consent.
    • TSC Communication Strategy at Project Insight ID # 696
      • Ravi and Jay are not on the phone. Defer.
    • Strategic Initiative feedback- does the TSC wish to offer any further feedback?
      • Do we want to provide additional formal feedback to the Board on Strategic Initiatives? The TSC agreed in Orlando to develop some sort of dashboard for measures the TSC has control over. Ken feels we should let the Board know we are actually responding to the initiatives. We should let them know we’ll be working on a dashboard. Austin thinks that we should create the project statement first and then use that to communicate the TSC’s intent to the Board. ACTION ITEM: Austin and John to draft the project for the SI Criteria Measure Dashboard.
    • Review of Ballot Guidance post-2011May WGM - see draft document
      • Ken notes that Project Services also had a balloting guidance chart. TSC has not reviewed that document. Woody notes that neither document really addresses the question TSC’s been asked for how to tell Work Groups to choose their ballot level. Dave’s document has a section for each kind of ballot versus the standards types. Lynn will re-send both documents to the TSC list. We may be looking at a new document that incorporates both of these. One might triage your ballot artifact type from Ed’s list and then go to Dave’s list to figure out what you have to do.
      • Bring the documents back next week and figure out how to merge them. There is little on next week’s agenda so far, we may be able to provide some time to discuss.
  7. Reports: (attach written reports below from Steering Divisions et al.)
    • ArB - Charlie reports 'The update is that the ArB has defined a schedule to produce for the TSC the promised V1 of SAIF (revised text from Information ballot that passed in the last cycle) and candidate V2 of SAIF to be submitted for DSTU ballot in the September ballot cycle.'

Adjourned 11:49 AM EDT.

Next Steps

Actions (Include Owner, Action Item, and due date)
  • Austin and John will work on a project for the TSC Strategic Initiative Measures Dashboard, with staff support.
  • Lynn will re-send both the Ballot Guidelines revised document from Ed and the Project Services ballot guidance documents to the TSC list for review on next week’s call.
Next Meeting/Preliminary Agenda Items