Difference between revisions of "2010-10-25 TSC Call Minutes"

From HL7 TSC
Jump to navigation Jump to search
m (moved 2010-10-25 TSC Call Agenda to 2010-10-25 TSC Call Minutes: minutes approved at 2010-11-01 conference call)
 
(6 intermediate revisions by the same user not shown)
Line 19: Line 19:
 
|width="40%"|'''Affiliation'''
 
|width="40%"|'''Affiliation'''
 
|-
 
|-
|?||Calvin Beebe||HL7 SSD SD Co-Chair
+
|x||Calvin Beebe||HL7 SSD SD Co-Chair
 
|-
 
|-
|?||Woody Beeler||HL7 FTSD Co-Chair
+
|x||Woody Beeler||HL7 FTSD Co-Chair
 
|-
 
|-
|?||Bob Dolin||HL7 Board Chair
+
|x||Bob Dolin||HL7 Board Chair
 
|-
 
|-
|?||Tony Julian||invited guest, HL7 FTSD
+
|.||Tony Julian||invited guest, HL7 FTSD
 
|-
 
|-
|?||Austin Kreisler||HL7 DESD Co-Chair
+
|x||Austin Kreisler||HL7 DESD Co-Chair
 
|-
 
|-
|?||Lynn Laakso ||HL7 staff support
+
|x||Lynn Laakso ||HL7 staff support
 
|-
 
|-
|?||Patrick Loyd||invited guest, HL7 T3SD  
+
|x||Patrick Loyd||invited guest, HL7 T3SD  
 
|-
 
|-
|?||Ken McCaslin||HL7 TSS SD Co-Chair
+
|regrets||Ken McCaslin||HL7 TSS SD Co-Chair
 
|-
 
|-
|?||Charlie McCay (chair)||HL7 TSC Chair, Affiliate Representative
+
|x||Charlie McCay (chair)||HL7 TSC Chair, Affiliate Representative
 
|-
 
|-
|?||Charlie Mead||HL7 ArB Chair
+
|x||Charlie Mead||HL7 ArB Chair
 
|-
 
|-
|?||Ravi Natarajan||HL7 Affiliate Representative
+
|x||Ravi Natarajan||HL7 Affiliate Representative
 
|-
 
|-
|?||Ron Parker||HL7 ArB Alternate
+
|.||Ron Parker||HL7 ArB Alternate
 
|-
 
|-
|?||John Quinn||HL7 CTO
+
|x||John Quinn||HL7 CTO
 
|-
 
|-
|?||Gregg Seppala||HL7 SSD SD Co-Chair
+
|x||Gregg Seppala||HL7 SSD SD Co-Chair
 
|-
 
|-
|?||Helen Stevens ||HL7 TSS SD Co-Chair
+
|x||Helen Stevens ||HL7 TSS SD Co-Chair
 
|-
 
|-
|?||Ed Tripp||HL7 DESD Co-Chair
+
|x||Ed Tripp||HL7 DESD Co-Chair
 
|-
 
|-
|?||D. Mead Walker||HL7 FTSD Co-Chair
+
|x||D. Mead Walker||HL7 FTSD Co-Chair
 
|-
 
|-
|?||Jay Zimmerman|| Ad-Hoc member
+
|x||Jay Zimmerman|| Ad-Hoc member
|-
 
| || ||
 
 
|-
 
|-
 
|colspan="3" style="background:#f0f0f0;"|
 
|colspan="3" style="background:#f0f0f0;"|
Line 63: Line 61:
 
{|border="1" cellpadding="2" cellspacing="0"  
 
{|border="1" cellpadding="2" cellspacing="0"  
 
|-
 
|-
|colspan="3" |'''Quorum Requirements (Chair +5 with 2 SD Reps) Met: '''(yes/No)
+
|colspan="3" |'''Quorum Requirements (Chair +5 with 2 SD Reps) Met: '''yes
 
|-
 
|-
 
|}
 
|}
Line 79: Line 77:
 
#* 2010-10-03 TSC [[2010-10-03 TSC Agenda HL7 Activities with other SDOs|Minutes]], Sunday Q4: ''HL7 Activities with other SDOs''
 
#* 2010-10-03 TSC [[2010-10-03 TSC Agenda HL7 Activities with other SDOs|Minutes]], Sunday Q4: ''HL7 Activities with other SDOs''
 
#*2010-10-02 TSC WGM [[2010-10-02 TSC WGM Agenda|Minutes]], Saturday Meeting
 
#*2010-10-02 TSC WGM [[2010-10-02 TSC WGM Agenda|Minutes]], Saturday Meeting
#*#Review [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=494 action items] –
+
#Review [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=494 action items] –
 
#*EA IP review
 
#*EA IP review
 
#WGM Follow up
 
#WGM Follow up
#*(September) '''Review [[TSC SWOT]]'''
+
#*CMET approach for ANSI - Karen working with Woody
#*Review [http://gforge.hl7.org/gf/download/docmanfileversion/5911/7645/TSC_DMP_v3.0_20101018_draft.doc draft updated TSC DMP] to update [http://www.hl7.org/Library/Committees/tsc/TSCDMP20100222_approved.doc existing TSC DMP]
 
 
# HL7 Chair or CEO Report – if available
 
# HL7 Chair or CEO Report – if available
 
# CTO Report  -  John Quinn
 
# CTO Report  -  John Quinn
 
# ArB Report – Charlie Mead/Ron Parker
 
# ArB Report – Charlie Mead/Ron Parker
 +
#*ArB proposal for updating Substantive Change language, process, etc.
 +
#*:ArB's Working Definition: Substantive change is any change in a specification that causes changes to conformant implementations, except in as much the implementation leverages technical publication artifacts directly.
 
# Affiliates Report – Ravi Natarajan/ Charlie McCay
 
# Affiliates Report – Ravi Natarajan/ Charlie McCay
 
# Domain Experts Report– Austin Kreisler/Ed Tripp
 
# Domain Experts Report– Austin Kreisler/Ed Tripp
 
#*'''Motion:''' to approve [http://gforge.hl7.org/gf/download/trackeritem/1676/7647/PatientSafety_ICSR_IG_Project.doc Project Scope Statement] for Patient Safety - ICSR IG at [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=1676&start=0 TSC Tracker #1676],  [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=703 Project Insight # 703]
 
#*'''Motion:''' to approve [http://gforge.hl7.org/gf/download/trackeritem/1676/7647/PatientSafety_ICSR_IG_Project.doc Project Scope Statement] for Patient Safety - ICSR IG at [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=1676&start=0 TSC Tracker #1676],  [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=703 Project Insight # 703]
 +
#*''Informative announcement:'' The HL7 Executive Committee has approved an out-of-cycle meeting for GAS (Generation of Anesthesia Standards) WG on February 16 and 17 2011 in London, UK.
 
# Foundation & Technology Report– Woody Beeler/Mead Walker
 
# Foundation & Technology Report– Woody Beeler/Mead Walker
 
#*[http://gforge.hl7.org/gf/download/trackeritem/1678/7663/RIMBAA_March2011_outofcyclemtg.doc Request to approve Out of Cycle meeting] for RIMBAA WG, March 30 and 31, Washington DC (USA) at [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=1678 TSC Tracker #1678]
 
#*[http://gforge.hl7.org/gf/download/trackeritem/1678/7663/RIMBAA_March2011_outofcyclemtg.doc Request to approve Out of Cycle meeting] for RIMBAA WG, March 30 and 31, Washington DC (USA) at [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=1678 TSC Tracker #1678]
Line 97: Line 97:
 
#WGM Planning -  
 
#WGM Planning -  
 
#*Marketing and promotion - update from HQ -  
 
#*Marketing and promotion - update from HQ -  
#*TSC preparations - Lynn Laakso
+
#*TSC preparations - Results of TSC Poll on attendance in January: Confirmed representatives from: Affiliate, ArB, Foundation & Technology, Structure & Semantic Design, Tech & Support Services, can achieve quorum if CTO chairs the meeting.
#*Working Group preparations - [http://wiki.hl7.org/index.php?title=WGM_information agendas]
+
#*Working Group preparations - [http://wiki.hl7.org/index.php?title=WGM_information agendas] - no new WG identified as not attending in January
 
#Organizational Relations Committee update ([http://www.hl7.org/concalls/index.cfm?action=home.welcome&listofwgids=112 semiweekly]) - Helen Stevens
 
#Organizational Relations Committee update ([http://www.hl7.org/concalls/index.cfm?action=home.welcome&listofwgids=112 semiweekly]) - Helen Stevens
 
#Discussion Topics:
 
#Discussion Topics:
 +
#*[http://wiki.hl7.org/index.php?title=Innovations Innovations] Report: Next Steps, followup - Ed Tripp
 +
#*"What are our key projects" decision making process
 +
#*DCM projects in ISO - continued discussion, entry level models program management
 
#*[http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=313 Open Issues List]
 
#*[http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=313 Open Issues List]
#*Innovations Report: Next Steps, e.g. a page of description to identify risks
 
#*"What are our key projects" decision making process
 
  
  
Line 113: Line 114:
 
===Minutes===
 
===Minutes===
 
'''Minutes/Conclusions Reached:'''<br/>
 
'''Minutes/Conclusions Reached:'''<br/>
<!--
+
Call to order at 11:10 AM after a brief discussion of sympathy for Jane Curry.
#Visitors:
+
#Introduction of visitors (including declaration of interests) none
#Agenda:
+
#Agenda review and approval - Charlie McCay
#Minutes approved by general consent
+
#*ArB first
#CEO
+
#*Discussion on Wiki main page to be added at end of agenda
#CTO
+
#*Austin has an update on Product Quality project. Bring in to discussion topics.
#ArB
+
#*Agenda approved.
#Affiliates:
+
# ArB Report – Charlie Mead
#DESD
+
#*ArB proposal for updating Substantive Change language, process, etc.
#FTSD
+
#*:ArB's Working Definition: Substantive change is any change in a specification that causes changes to conformant implementations, except in as much the implementation leverages technical publication artifacts directly.
#SSD SD
+
#*Charlie Mead notes that Jane Curry gave the ArB a good history of how this came to be.  Made it through development though did not go through to ballot.  It is not a trivial issue. Definition from Grahame. It’s probably not the be-all and end-all definition but a working definition.  Will publish to directed audience for feedback to a task force. ArB asks for today is the TSC comfortable with this strategy or if not, what revisions?
#T3SD
+
#*Woody asks if this was documented elsewhere? Charlie Mead sends the four steps to the TSCadmins list.
#Comments:
+
#*Patrick, John join.
#WGM:
+
#*Would be part of the HL7 implementation of SAIF governance. Might sit between governance and conformance.
#Discussion
+
#*Ravi asks what is the timeline? Will this be a task force or will be a project?
#Adjourned hh:mm am/pm (timezone).
+
#*'''Motion:''' Approve the tentative approach and ask ArB to draft and bring back to TSC on next week’s call. '''Vote:''' unanimously approved. Ron will be here the next two weeks as Charlie Mead will be gone, and Charlie Mead leaves the call.
-->
+
#Approve Minutes
 +
#*[[2010-10-18_TSC Call Agenda]] – unanimously approved
 +
#*2010-10-06 TSC Enterprise Architecture Alpha Projects Wednesday Q4 convened instead with O&O Joint session with ArB and MnM; see ArB minutes at http://wiki.hl7.org/index.php?title=20101006_arb_minutes_jointw_with_O%26O_and_MnM_on_EA_IP_Transition; Ravi abstains (from all WGM minutes); otherwise endorsed (6/0/1)
 +
#* 2010-10-05 TSC WGM [[2010-10-05 TSC WGM Agenda|Minutes]], Tuesday Luncheon Meeting; Ravi and Mead abstain Woody’s vote counts in Meads abstainment - approved (6/0/1)
 +
#* 2010-10-04 TSC WGM [[2010-10-04 TSC WGM Agenda|Minutes]], Monday Co-Chairs Meeting; no notes as there were no comments during the Open Mic. Ravi abstains, approved (6/0/1)
 +
#* 2010-10-04 TSC WGM [[2010-10-04 TSC WGM Innovations Workshop|Minutes:Innovations Workshop]]. Ravi abstains, approved (6/0/1)
 +
#* 2010-10-03 TSC WGM [[2010-10-03 TSC WGM Agenda|Minutes]], Sunday Evening Meeting
 +
#* 2010-10-03 TSC [[2010-10-03 TSC Agenda HL7 Activities with other SDOs|Minutes]], Sunday Q4: ''HL7 Activities with other SDOs''. Ravi abstains, approved (6/0/1)
 +
#*2010-10-02 TSC WGM [[2010-10-02 TSC WGM Agenda|Minutes]], Saturday Meeting
 +
#Review [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=494 action items] –
 +
#*EA IP review – Lynn reports we’ll proceed this week with pursuing closure interviews with the alpha projects. She and Marc are exchanging drafts of the program management approach as best fits in a project scope statement.
 +
#WGM Follow up
 +
#*CMET approach for ANSI - Karen working with Woody; Woody submitted NIB last night for reaffirmation ballot for releases 3 through 7 and will continue to refine on wiki page. Total of 62 CMETs in this category.
 +
# HL7 Chair or CEO Report – Bob has nothing to report.
 +
# CTO Report  -  John Quinn notes the thread of emails on the wiki page going to the cochairs was anticipated for discussion today prompting Bob’s attendance. John is working on MOU, technical scope and effort, with NCPDP regarding mapping SCRIPT to RIM where applicable and identify gaps. Scott Robertson is reviewing the proposed scope and difficulty assessment for John. They are preparing for eligibility of RIM as information model for US Healthcare with NIEM.
 +
#*Woody notes that they plan to submit proposal to ISO for continuous adoption of RIM as ISO specification. There is an obligation to define a process for doing so, compatible with HL7 objectives. If anyone is interested please join the MnM effort. Proposals will be developed in coming weeks.
 +
#*John notes that there are discussions on EHR-S ballot in ISO as ISO-only or JIC. HL7 has not yet received acknowledgement whether it is JIC. John waiting to get confirmation from ISO secretariat.
 +
# Affiliates Report – Ravi Natarajan has no report.  He asks Bob where the latest version of the HL7 Strategic Initiatives document is?  Karen will be updating the hyperlink on the home page, but he can email it as well.
 +
# Domain Experts Report– Austin Kreisler/Ed Tripp
 +
#*'''Motion:''' to approve [http://gforge.hl7.org/gf/download/trackeritem/1676/7647/PatientSafety_ICSR_IG_Project.doc Project Scope Statement] for Patient Safety - ICSR IG at [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=1676&start=0 TSC Tracker #1676],  [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=703 Project Insight # 703];
 +
#**planning to go to ballot in January, on the heels of the ICSR Normative ballot having passed the JIC process in September.  ICSR is going for FDIS in ISO with cosmetic changes. John reported regarding WG6 of ISO meeting in Rotterdam that the feeling prevailed that it was done. The Implementation guide would be US Realm.
 +
#**Marked as public document, notes Austin.  Is this a decision by the TSC? It is subject to approval by the EC.  Mead thought that it was typical of Implementation Guides. This needs to be validated.
 +
#**Most of the content has already been developed, so there are not many people on the project team defined.
 +
#**Austin moves we approve second Helen, subject to EC endorsement. '''Vote:''' Unanimously approved. John will address to the EC. Mead will check with the Work Group to see if it’s their intent.
 +
#*''Informative announcement:'' The HL7 Executive Committee has approved an out-of-cycle meeting for GAS (Generation of Anesthesia Standards) WG on February 16 and 17 2011 in London, UK (in lieu of attendance at the regularly scheduled WGM). Lynn passed this directly to the EC; should have the TSC review these in future and provide recommendation and commentary to EC with the request.
 +
#**Woody asks if these requests should be seen by the Steering Division?  Place on future agenda.
 +
# Foundation & Technology Report– Woody Beeler/Mead Walker
 +
#*[http://gforge.hl7.org/gf/download/trackeritem/1678/7663/RIMBAA_March2011_outofcyclemtg.doc Request to approve Out of Cycle meeting] for RIMBAA WG, March 30 and 31, Washington DC (USA) at [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=1678 TSC Tracker #1678] – this request is in addition to attendance at the regularly scheduled WGM.
 +
#**'''Vote:''' Unanimously approved.
 +
#**The Steering Division approved two additional projects that are on next week’s agenda.
 +
# Structure & Semantic Design Report– Calvin Beebe has nothing this week.
 +
# Technical & Support Services Report- Helen Stevens has nothing this week.
 +
#Membership Comments on Steering Division Reports
 +
#WGM Planning -
 +
#*Marketing and promotion - update from HQ -
 +
#*TSC preparations - Results of TSC Poll on attendance in January: Confirmed representatives from: Affiliate, ArB, Foundation & Technology, Structure & Semantic Design, Tech & Support Services, can achieve quorum if CTO chairs the meeting. Domain Experts does not currently have confirmation for attendance; may have to exercise ad-hoc
 +
#*Working Group preparations - [http://wiki.hl7.org/index.php?title=WGM_information agendas] - no new WG identified as not attending in January
 +
#Organizational Relations Committee update ([http://www.hl7.org/concalls/index.cfm?action=home.welcome&listofwgids=112 semiweekly]) - Helen Stevens – ORC has not met.
 +
#Out of time, Postpone discussion topics to next week.
 +
#*Austin asks to answer the scheduling poll for Product Quality. What version of the HL7 wiki landing page shall he put a link from?
 +
#*Wiki page discussion should continue on the TSC list. Charlie will send a note to the cochairs list saying that the TSC shall continue the discussion internally.
 +
 
 +
 
 +
Adjourned 12:02 PM EDT
  
 
===Next Steps===
 
===Next Steps===
Line 135: Line 179:
 
|-
 
|-
 
|colspan="4" |'''Actions''' ''(Include Owner, Action Item, and due date)''<br/>
 
|colspan="4" |'''Actions''' ''(Include Owner, Action Item, and due date)''<br/>
* .
+
* Charlie will send a note to the cochairs list saying that the TSC shall continue the wiki page discussion internally
 
|-
 
|-
 
|colspan="4" |'''Next Meeting/Preliminary Agenda Items'''<br/>
 
|colspan="4" |'''Next Meeting/Preliminary Agenda Items'''<br/>
*.
+
Discussion Topics:
 +
#[http://wiki.hl7.org/index.php?title=Innovations Innovations] Report: Next Steps, followup - Ed Tripp
 +
#"What are our key projects" decision making process
 +
#DCM projects in ISO - continued discussion, entry level models program management
 +
#Wiki main page edits discussion
 +
#Product Quality project update
 +
#*[http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=313 Open Issues List]
 +
 
 
|}
 
|}

Latest revision as of 13:36, 3 November 2010

TSC Agenda/Minutes

Meeting Info/Attendees

Standing Conference Calls

TSC will hold a Conference Call at 11AM Eastern time, each Monday except during scheduled face-to-face Working Group Meetings unless otherwise noted at TSC_Minutes_and_Agendas.

GoToMeeting at https://global.gotomeeting.com/join/426505829 using VOIP
For those without access to microphone/speakers:
US: +1 (224)501-3318
Canada: +1 (647)497-9379
Italy: +39 0 230 57 81 80
Access Code: 426-505-829
GoToMeeting ID: 426-505-829
HL7 TSC Meeting Minutes

Location: Dial 770-657-9270 and enter pass code 124466#

Date: 2010-10-25
Time: 11 am EDT
Facilitator: Charlie McCay Note taker(s): Lynn Laakso
Attendee Name Affiliation
x Calvin Beebe HL7 SSD SD Co-Chair
x Woody Beeler HL7 FTSD Co-Chair
x Bob Dolin HL7 Board Chair
. Tony Julian invited guest, HL7 FTSD
x Austin Kreisler HL7 DESD Co-Chair
x Lynn Laakso HL7 staff support
x Patrick Loyd invited guest, HL7 T3SD
regrets Ken McCaslin HL7 TSS SD Co-Chair
x Charlie McCay (chair) HL7 TSC Chair, Affiliate Representative
x Charlie Mead HL7 ArB Chair
x Ravi Natarajan HL7 Affiliate Representative
. Ron Parker HL7 ArB Alternate
x John Quinn HL7 CTO
x Gregg Seppala HL7 SSD SD Co-Chair
x Helen Stevens HL7 TSS SD Co-Chair
x Ed Tripp HL7 DESD Co-Chair
x D. Mead Walker HL7 FTSD Co-Chair
x Jay Zimmerman Ad-Hoc member


Quorum Requirements (Chair +5 with 2 SD Reps) Met: yes

Agenda

Agenda Topics

  1. Introduction of visitors (including declaration of interests)
  2. Agenda review and approval - Charlie McCay
  3. Approve Minutes
  4. Review action items
    • EA IP review
  5. WGM Follow up
    • CMET approach for ANSI - Karen working with Woody
  6. HL7 Chair or CEO Report – if available
  7. CTO Report - John Quinn
  8. ArB Report – Charlie Mead/Ron Parker
    • ArB proposal for updating Substantive Change language, process, etc.
      ArB's Working Definition: Substantive change is any change in a specification that causes changes to conformant implementations, except in as much the implementation leverages technical publication artifacts directly.
  9. Affiliates Report – Ravi Natarajan/ Charlie McCay
  10. Domain Experts Report– Austin Kreisler/Ed Tripp
  11. Foundation & Technology Report– Woody Beeler/Mead Walker
  12. Structure & Semantic Design Report– Calvin Beebe/Gregg Seppala
  13. Technical & Support Services Report- Ken McCaslin/ Helen Stevens
  14. Membership Comments on Steering Division Reports
  15. WGM Planning -
    • Marketing and promotion - update from HQ -
    • TSC preparations - Results of TSC Poll on attendance in January: Confirmed representatives from: Affiliate, ArB, Foundation & Technology, Structure & Semantic Design, Tech & Support Services, can achieve quorum if CTO chairs the meeting.
    • Working Group preparations - agendas - no new WG identified as not attending in January
  16. Organizational Relations Committee update (semiweekly) - Helen Stevens
  17. Discussion Topics:
    • Innovations Report: Next Steps, followup - Ed Tripp
    • "What are our key projects" decision making process
    • DCM projects in ISO - continued discussion, entry level models program management
    • Open Issues List


Supporting Documents

Minutes

Minutes/Conclusions Reached:
Call to order at 11:10 AM after a brief discussion of sympathy for Jane Curry.

  1. Introduction of visitors (including declaration of interests) none
  2. Agenda review and approval - Charlie McCay
    • ArB first
    • Discussion on Wiki main page to be added at end of agenda
    • Austin has an update on Product Quality project. Bring in to discussion topics.
    • Agenda approved.
  3. ArB Report – Charlie Mead
    • ArB proposal for updating Substantive Change language, process, etc.
      ArB's Working Definition: Substantive change is any change in a specification that causes changes to conformant implementations, except in as much the implementation leverages technical publication artifacts directly.
    • Charlie Mead notes that Jane Curry gave the ArB a good history of how this came to be. Made it through development though did not go through to ballot. It is not a trivial issue. Definition from Grahame. It’s probably not the be-all and end-all definition but a working definition. Will publish to directed audience for feedback to a task force. ArB asks for today is the TSC comfortable with this strategy or if not, what revisions?
    • Woody asks if this was documented elsewhere? Charlie Mead sends the four steps to the TSCadmins list.
    • Patrick, John join.
    • Would be part of the HL7 implementation of SAIF governance. Might sit between governance and conformance.
    • Ravi asks what is the timeline? Will this be a task force or will be a project?
    • Motion: Approve the tentative approach and ask ArB to draft and bring back to TSC on next week’s call. Vote: unanimously approved. Ron will be here the next two weeks as Charlie Mead will be gone, and Charlie Mead leaves the call.
  4. Approve Minutes
  5. Review action items
    • EA IP review – Lynn reports we’ll proceed this week with pursuing closure interviews with the alpha projects. She and Marc are exchanging drafts of the program management approach as best fits in a project scope statement.
  6. WGM Follow up
    • CMET approach for ANSI - Karen working with Woody; Woody submitted NIB last night for reaffirmation ballot for releases 3 through 7 and will continue to refine on wiki page. Total of 62 CMETs in this category.
  7. HL7 Chair or CEO Report – Bob has nothing to report.
  8. CTO Report - John Quinn notes the thread of emails on the wiki page going to the cochairs was anticipated for discussion today prompting Bob’s attendance. John is working on MOU, technical scope and effort, with NCPDP regarding mapping SCRIPT to RIM where applicable and identify gaps. Scott Robertson is reviewing the proposed scope and difficulty assessment for John. They are preparing for eligibility of RIM as information model for US Healthcare with NIEM.
    • Woody notes that they plan to submit proposal to ISO for continuous adoption of RIM as ISO specification. There is an obligation to define a process for doing so, compatible with HL7 objectives. If anyone is interested please join the MnM effort. Proposals will be developed in coming weeks.
    • John notes that there are discussions on EHR-S ballot in ISO as ISO-only or JIC. HL7 has not yet received acknowledgement whether it is JIC. John waiting to get confirmation from ISO secretariat.
  9. Affiliates Report – Ravi Natarajan has no report. He asks Bob where the latest version of the HL7 Strategic Initiatives document is? Karen will be updating the hyperlink on the home page, but he can email it as well.
  10. Domain Experts Report– Austin Kreisler/Ed Tripp
    • Motion: to approve Project Scope Statement for Patient Safety - ICSR IG at TSC Tracker #1676, Project Insight # 703;
      • planning to go to ballot in January, on the heels of the ICSR Normative ballot having passed the JIC process in September. ICSR is going for FDIS in ISO with cosmetic changes. John reported regarding WG6 of ISO meeting in Rotterdam that the feeling prevailed that it was done. The Implementation guide would be US Realm.
      • Marked as public document, notes Austin. Is this a decision by the TSC? It is subject to approval by the EC. Mead thought that it was typical of Implementation Guides. This needs to be validated.
      • Most of the content has already been developed, so there are not many people on the project team defined.
      • Austin moves we approve second Helen, subject to EC endorsement. Vote: Unanimously approved. John will address to the EC. Mead will check with the Work Group to see if it’s their intent.
    • Informative announcement: The HL7 Executive Committee has approved an out-of-cycle meeting for GAS (Generation of Anesthesia Standards) WG on February 16 and 17 2011 in London, UK (in lieu of attendance at the regularly scheduled WGM). Lynn passed this directly to the EC; should have the TSC review these in future and provide recommendation and commentary to EC with the request.
      • Woody asks if these requests should be seen by the Steering Division? Place on future agenda.
  11. Foundation & Technology Report– Woody Beeler/Mead Walker
    • Request to approve Out of Cycle meeting for RIMBAA WG, March 30 and 31, Washington DC (USA) at TSC Tracker #1678 – this request is in addition to attendance at the regularly scheduled WGM.
      • Vote: Unanimously approved.
      • The Steering Division approved two additional projects that are on next week’s agenda.
  12. Structure & Semantic Design Report– Calvin Beebe has nothing this week.
  13. Technical & Support Services Report- Helen Stevens has nothing this week.
  14. Membership Comments on Steering Division Reports
  15. WGM Planning -
    • Marketing and promotion - update from HQ -
    • TSC preparations - Results of TSC Poll on attendance in January: Confirmed representatives from: Affiliate, ArB, Foundation & Technology, Structure & Semantic Design, Tech & Support Services, can achieve quorum if CTO chairs the meeting. Domain Experts does not currently have confirmation for attendance; may have to exercise ad-hoc
    • Working Group preparations - agendas - no new WG identified as not attending in January
  16. Organizational Relations Committee update (semiweekly) - Helen Stevens – ORC has not met.
  17. Out of time, Postpone discussion topics to next week.
    • Austin asks to answer the scheduling poll for Product Quality. What version of the HL7 wiki landing page shall he put a link from?
    • Wiki page discussion should continue on the TSC list. Charlie will send a note to the cochairs list saying that the TSC shall continue the discussion internally.


Adjourned 12:02 PM EDT

Next Steps

Actions (Include Owner, Action Item, and due date)
  • Charlie will send a note to the cochairs list saying that the TSC shall continue the wiki page discussion internally
Next Meeting/Preliminary Agenda Items

Discussion Topics:

  1. Innovations Report: Next Steps, followup - Ed Tripp
  2. "What are our key projects" decision making process
  3. DCM projects in ISO - continued discussion, entry level models program management
  4. Wiki main page edits discussion
  5. Product Quality project update