Difference between revisions of "2016-10-31 TSC Call Agenda"
Jump to navigation
Jump to search
Anne wizauer (talk | contribs) (→Agenda) |
Anne wizauer (talk | contribs) |
||
(14 intermediate revisions by the same user not shown) | |||
Line 30: | Line 30: | ||
|colspan="2"|Chair/CTO ||colspan="2"|ArB ||colspan="2"|International Affiliate Rep ||colspan="2"|Ad-Hoc | |colspan="2"|Chair/CTO ||colspan="2"|ArB ||colspan="2"|International Affiliate Rep ||colspan="2"|Ad-Hoc | ||
|- | |- | ||
− | | | + | |x||Ken McCaslin||x||Tony Julian||.|| Jean Duteau||x||Austin Kreisler |
|- | |- | ||
− | | | + | |x||Wayne Kubick ||x||Lorraine Constable||.|| Giorgio Cangioli||x||Freida Hall, GOM Expert |
|- | |- | ||
|.|| ||.|| ||.|| ||.||Woody Beeler, TSC Member Emeritus | |.|| ||.|| ||.|| ||.||Woody Beeler, TSC Member Emeritus | ||
Line 42: | Line 42: | ||
|- | |- | ||
− | | | + | |x||Melva Peters||.||Russ Hamm||Regrets||Calvin Beebe||x||Andy Stechishin |
|- | |- | ||
− | | | + | |x||John Roberts||x||Paul Knapp||x||Gora Datta||x||Sandra Stuart |
|- | |- | ||
|.|| ||. || ||.|| ||.|| | |.|| ||. || ||.|| ||.|| | ||
Line 53: | Line 53: | ||
|colspan="2" align="center" style="background:#f0f0f0;"|HL7 Staff | |colspan="2" align="center" style="background:#f0f0f0;"|HL7 Staff | ||
|- | |- | ||
− | |.||Pat Van Dyke (HL7 Chair) w/vote||.|| ||.||''obs1''|| | + | |.||Pat Van Dyke (HL7 Chair) w/vote||.|| ||.||''obs1''||x||Anne Wizauer |
|- | |- | ||
|.||Chuck Jaffe (CEO) <s> vote</s>||.||.||.||''obs2''||.|| | |.||Chuck Jaffe (CEO) <s> vote</s>||.||.||.||''obs2''||.|| | ||
Line 73: | Line 73: | ||
#Approve Minutes of [[2016-10-24 TSC Call Agenda]] | #Approve Minutes of [[2016-10-24 TSC Call Agenda]] | ||
#Review [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=494 action items] – | #Review [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=494 action items] – | ||
+ | #*'''Continued discussion of''' [http://gforge.hl7.org/gf/download/trackeritem/12284/14815/HL7%20Project%20Scope%20Statement%20Document%20Sharing%20for%20Submission%202.docx Project Approval Request] by the HSI WG of the T3SD for ''FHIR Document Sharing'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfmaction=edit&ProjectNumber=1231 Project Insight 1231] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=12284&start=0 TSC Tracker 12284] | ||
+ | #**MOTION: We request that the WG modify their Mission and Charter to include the fact that they do not sponsor projects with ballotable artifacts: Wayne/Paul | ||
#*John Roberts waiting for WG clarity on the issues with [http://gforge.hl7.org/gf/download/trackeritem/12197/14712/HL7%20Project%20Scope%20Statement%20v2015.1_Negation_i%202626467.docx Project Approval Request] by the Patient Care WG of the DESD of ''Definition of Negation Requirements for Standards'' at Project Insight TBD and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=12197&start=0 TSC Tracker 12197] – white paper, SAIF conceptual model, or informative document? | #*John Roberts waiting for WG clarity on the issues with [http://gforge.hl7.org/gf/download/trackeritem/12197/14712/HL7%20Project%20Scope%20Statement%20v2015.1_Negation_i%202626467.docx Project Approval Request] by the Patient Care WG of the DESD of ''Definition of Negation Requirements for Standards'' at Project Insight TBD and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=12197&start=0 TSC Tracker 12197] – white paper, SAIF conceptual model, or informative document? | ||
#**'''John has provided an''' [http://gforge.hl7.org/gf/download/trackeritem/12197/14833/HL7%20Project%20Scope%20Statement%20v2015.1_Negation_l.docx updated document] for approval | #**'''John has provided an''' [http://gforge.hl7.org/gf/download/trackeritem/12197/14833/HL7%20Project%20Scope%20Statement%20v2015.1_Negation_l.docx updated document] for approval | ||
− | #*All to review [http://gforge.hl7.org/gf/download/docmanfileversion/9454/14841/HL7_Publication_Request_Template_2016Oct.docx updated publication request document] | + | #*All to review [http://gforge.hl7.org/gf/download/docmanfileversion/9454/14841/HL7_Publication_Request_Template_2016Oct.docx updated publication request document] (updates to unballoted stu update section, plus added page numbers and revision date in footer) |
− | + | #Approval items from last week's e-vote approved 5/0/0: | |
− | |||
− | #Approval items from last week's e-vote approved | ||
#*[http://gforge.hl7.org/gf/download/trackeritem/12297/14836/Vital%20Records%20Domain%20Analysis%20Model%20Update%20PSS%20-%2020161024.docx Project Approval Request] by the PHER WG of the DESD for ''Vital Records Domain Analysis Update'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfmaction=edit&ProjectNumber=1296 Project Insight 1296] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=12297&start=0 TSC Tracker 12297] | #*[http://gforge.hl7.org/gf/download/trackeritem/12297/14836/Vital%20Records%20Domain%20Analysis%20Model%20Update%20PSS%20-%2020161024.docx Project Approval Request] by the PHER WG of the DESD for ''Vital Records Domain Analysis Update'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfmaction=edit&ProjectNumber=1296 Project Insight 1296] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=12297&start=0 TSC Tracker 12297] | ||
#*[http://gforge.hl7.org/gf/download/trackeritem/12298/14835/HL7%20Pharmacy%20Knowledge%20Base%20Query%20Reaffirmation%20PSS%20-%20v0.1.docx Project Approval Request] by the Pharmacy WG of the DESD for ''Reaffirmation of HL7 Version 3 Standard: Medication; Knowledge-Based Query, R1'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfmaction=edit&ProjectNumber=1286 Project Insight 1286] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=12298&start=0 TSC Tracker 12298] | #*[http://gforge.hl7.org/gf/download/trackeritem/12298/14835/HL7%20Pharmacy%20Knowledge%20Base%20Query%20Reaffirmation%20PSS%20-%20v0.1.docx Project Approval Request] by the Pharmacy WG of the DESD for ''Reaffirmation of HL7 Version 3 Standard: Medication; Knowledge-Based Query, R1'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfmaction=edit&ProjectNumber=1286 Project Insight 1286] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=12298&start=0 TSC Tracker 12298] | ||
#Approval items for this week: | #Approval items for this week: | ||
+ | #*[http://gforge.hl7.org/gf/download/trackeritem/12313/14848/HL7_Publication_Request_Privacy_Consent_Normative%202.docx Normative Publication Request] by the CBCC WG of the DESD for ''HL7 CDA® R2 Implementation Guide: Privacy Consent Directives, Release 1'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfmaction=edit&ProjectNumber=553 Project Insight 553] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=12313&start=0 TSC Tracker 12313] | ||
#Discussion topics: | #Discussion topics: | ||
+ | #*[http://gforge.hl7.org/gf/download/docmanfileversion/9455/14842/2017-10-10%20TSC%20input%20request.docx 2017 PSS Update] - need input from TSC (Freida) | ||
#*Initial report from SGB and ARB on addressing the issue of separation of concerns | #*Initial report from SGB and ARB on addressing the issue of separation of concerns | ||
#*Report from Paul, Calvin, Melva on requirements for logging issues/comments across standards | #*Report from Paul, Calvin, Melva on requirements for logging issues/comments across standards | ||
#*Continue [http://hl7tsc.org/wiki/index.php?title=TSC_SWOT TSC SWOT] Review | #*Continue [http://hl7tsc.org/wiki/index.php?title=TSC_SWOT TSC SWOT] Review | ||
− | #*Revisit PSS for "Revise Process to Withdraw Protocol Specifications" | + | #*Revisit PSS for "[http://gforge.hl7.org/gf/download/trackeritem/9691/14223/TSC_WithdrawProposal_V4.doc Revise Process to Withdraw Protocol Specifications]" |
#**TSC reviewed/did not approve because of the following concerns: 1) lack of project facilitator; 2) no co-sponsor approvals. Ken will talk to Dave about being the facilitator. Andy will coordinate with publishing and PIC regarding cosponsoring. ARB will add to their agenda as well. | #**TSC reviewed/did not approve because of the following concerns: 1) lack of project facilitator; 2) no co-sponsor approvals. Ken will talk to Dave about being the facilitator. Andy will coordinate with publishing and PIC regarding cosponsoring. ARB will add to their agenda as well. | ||
#**Original issue was CCOW but once that was resolved the issue lost steam | #**Original issue was CCOW but once that was resolved the issue lost steam | ||
− | # | + | #*Identifying and communicating essential rules (Wayne) |
− | |||
#[http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=313 Open Issues List] | #[http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=313 Open Issues List] | ||
+ | #*Multi-Year Planning Items | ||
===Minutes=== | ===Minutes=== | ||
− | ''' | + | *Agenda review and approval - |
+ | **No additions | ||
+ | *Approve Minutes of [[2016-10-24 TSC Call Agenda]] | ||
+ | **Minutes accepted via general consent | ||
+ | *Review [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemBrowse&tracker_id=494 action items] – | ||
+ | **'''Continued discussion of''' [http://gforge.hl7.org/gf/download/trackeritem/12284/14815/HL7%20Project%20Scope%20Statement%20Document%20Sharing%20for%20Submission%202.docx Project Approval Request] by the HSI WG of the T3SD for ''FHIR Document Sharing'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfmaction=edit&ProjectNumber=1231 Project Insight 1231] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=12284&start=0 TSC Tracker 12284] | ||
+ | ***Tabled MOTION: We request that the WG modify their Mission and Charter to include the fact that they do not sponsor projects with ballotable artifacts: Wayne/Paul | ||
+ | ****If they do change their mission and charter, it doesn't come back to TSC for review, and TSC should review. Do we know what the will of the committee or the intent of the cochairs is? Wayne: It's not clear in the M&C that they're not allowed to create standards. It's not documented anywhere and should be clarified. | ||
+ | ***MOTION to re-open the motion: Freida/Paul | ||
+ | ***VOTE: All in favor | ||
+ | ***VOTE on the motion: T3SD abstains. Remaining in favor. | ||
+ | ***SD cochairs will take this issue back to WG | ||
+ | *Discussion topics: | ||
+ | **[http://gforge.hl7.org/gf/download/docmanfileversion/9455/14842/2017-10-10%20TSC%20input%20request.docx 2017 PSS Update] - need input from TSC (Freida) | ||
+ | ***TSC suggested there should be review/approval by at least one affiliate for universal realm projects. Discussion over how to operationalize. Lorraine notes that affiliate involvement is a high bar. Gora: Perhaps it just has to be more than one realm. Ken: Do we want to hold up a project on this basis? Wayne mentions the whole binary structure is odd. Paul: We have affiliates all over the planet that are the realms; US is the only realm without an affiliate. Realm is a jurisdictional space. We don't approve affiliate realm-specific materials. We only approve universal and US items. Who has the authority to determine universal realm? Lorraine: HL7 international develops international content by default. Question over whether we really need additional information on the PSS. Freida: Do we want any clarification in 6.b.? Melva notes that universal applicability can be noted in the needs and scope sections. It's not just implementers that make something universal; sometimes it's requirements. Paul: We're gathering information about applicability; someone from the universal space should be contributing/reviewing. | ||
+ | ****MOTION: Based on this discussion, we do not recommend a change in 2.c., but add the sentence in 6.b. (Universal projects may include representation from more than one realm as defined in section 2.c.). : Freida/Andy | ||
+ | ****Wayne notes that the word "may" makes this optional. We should ask people for additional information. | ||
+ | ****MOTION withdrawn by Freida. | ||
+ | ****MOTION to add instructions to provide justification of realm selection in 6.b.: Wayne/Gora | ||
+ | ****VOTE: All in favor | ||
+ | *Adjourned at 11:57 a.m. Eastern | ||
Line 104: | Line 126: | ||
|- | |- | ||
|colspan="4" |'''Next Meeting/Preliminary Agenda Items'''<br/> | |colspan="4" |'''Next Meeting/Preliminary Agenda Items'''<br/> | ||
− | *[[2016- | + | *[[2016-11-07 TSC Call Agenda]]. |
|} | |} | ||
© 2016 Health Level Seven® International. All rights reserved. | © 2016 Health Level Seven® International. All rights reserved. |
Latest revision as of 20:56, 1 November 2016
TSC Agenda/Minutes
Meeting Info/Attendees
Standing Conference Calls
TSC will hold a Conference Call at 11AM Eastern time, each Monday except during scheduled face-to-face Working Group Meetings unless otherwise noted at TSC_Minutes_and_Agendas.
- GoToMeeting at https://global.gotomeeting.com/join/426505829 using VOIP
- For those without access to microphone/speakers:
- US: +1 (224)501-3318
- Canada: +1 (647)497-9379
- Italy: +39 0 230 57 81 80
- Access Code: 426-505-829
- GoToMeeting ID: 426-505-829
HL7 TSC Meeting Minutes Location: GoToMeeting ID: 426-505-829 |
Date: 2016-10-31 Time: 11:00 AM U.S. Eastern | |
Facilitator: Ken McCaslin | Note taker(s): Anne Wizauer |
Quorum = chair + 5 including 2 SD represented | yes/no | ||||||
Chair/CTO | ArB | International Affiliate Rep | Ad-Hoc | ||||
x | Ken McCaslin | x | Tony Julian | . | Jean Duteau | x | Austin Kreisler |
x | Wayne Kubick | x | Lorraine Constable | . | Giorgio Cangioli | x | Freida Hall, GOM Expert |
. | . | . | . | Woody Beeler, TSC Member Emeritus | |||
Domain Experts | Foundation and Technology | Structure and Semantic Design | Technical and Support Services | ||||
x | Melva Peters | . | Russ Hamm | Regrets | Calvin Beebe | x | Andy Stechishin |
x | John Roberts | x | Paul Knapp | x | Gora Datta | x | Sandra Stuart |
. | . | . | . | ||||
ex officio | Invited Guests | Observers | HL7 Staff | ||||
. | Pat Van Dyke (HL7 Chair) w/vote | . | . | obs1 | x | Anne Wizauer | |
. | Chuck Jaffe (CEO) |
. | . | . | obs2 | . |
|
. | . | . | . | . | |||
Agenda
Housekeeping
- Introduction of visitors (including declaration of interests)
- Agenda review and approval -
- Approve Minutes of 2016-10-24 TSC Call Agenda
- Review action items –
- Continued discussion of Project Approval Request by the HSI WG of the T3SD for FHIR Document Sharing at Project Insight 1231 and TSC Tracker 12284
- MOTION: We request that the WG modify their Mission and Charter to include the fact that they do not sponsor projects with ballotable artifacts: Wayne/Paul
- John Roberts waiting for WG clarity on the issues with Project Approval Request by the Patient Care WG of the DESD of Definition of Negation Requirements for Standards at Project Insight TBD and TSC Tracker 12197 – white paper, SAIF conceptual model, or informative document?
- John has provided an updated document for approval
- All to review updated publication request document (updates to unballoted stu update section, plus added page numbers and revision date in footer)
- Continued discussion of Project Approval Request by the HSI WG of the T3SD for FHIR Document Sharing at Project Insight 1231 and TSC Tracker 12284
- Approval items from last week's e-vote approved 5/0/0:
- Project Approval Request by the PHER WG of the DESD for Vital Records Domain Analysis Update at Project Insight 1296 and TSC Tracker 12297
- Project Approval Request by the Pharmacy WG of the DESD for Reaffirmation of HL7 Version 3 Standard: Medication; Knowledge-Based Query, R1 at Project Insight 1286 and TSC Tracker 12298
- Approval items for this week:
- Normative Publication Request by the CBCC WG of the DESD for HL7 CDA® R2 Implementation Guide: Privacy Consent Directives, Release 1 at Project Insight 553 and TSC Tracker 12313
- Discussion topics:
- 2017 PSS Update - need input from TSC (Freida)
- Initial report from SGB and ARB on addressing the issue of separation of concerns
- Report from Paul, Calvin, Melva on requirements for logging issues/comments across standards
- Continue TSC SWOT Review
- Revisit PSS for "Revise Process to Withdraw Protocol Specifications"
- TSC reviewed/did not approve because of the following concerns: 1) lack of project facilitator; 2) no co-sponsor approvals. Ken will talk to Dave about being the facilitator. Andy will coordinate with publishing and PIC regarding cosponsoring. ARB will add to their agenda as well.
- Original issue was CCOW but once that was resolved the issue lost steam
- Identifying and communicating essential rules (Wayne)
- Open Issues List
- Multi-Year Planning Items
Minutes
- Agenda review and approval -
- No additions
- Approve Minutes of 2016-10-24 TSC Call Agenda
- Minutes accepted via general consent
- Review action items –
- Continued discussion of Project Approval Request by the HSI WG of the T3SD for FHIR Document Sharing at Project Insight 1231 and TSC Tracker 12284
- Tabled MOTION: We request that the WG modify their Mission and Charter to include the fact that they do not sponsor projects with ballotable artifacts: Wayne/Paul
- If they do change their mission and charter, it doesn't come back to TSC for review, and TSC should review. Do we know what the will of the committee or the intent of the cochairs is? Wayne: It's not clear in the M&C that they're not allowed to create standards. It's not documented anywhere and should be clarified.
- MOTION to re-open the motion: Freida/Paul
- VOTE: All in favor
- VOTE on the motion: T3SD abstains. Remaining in favor.
- SD cochairs will take this issue back to WG
- Tabled MOTION: We request that the WG modify their Mission and Charter to include the fact that they do not sponsor projects with ballotable artifacts: Wayne/Paul
- Continued discussion of Project Approval Request by the HSI WG of the T3SD for FHIR Document Sharing at Project Insight 1231 and TSC Tracker 12284
- Discussion topics:
- 2017 PSS Update - need input from TSC (Freida)
- TSC suggested there should be review/approval by at least one affiliate for universal realm projects. Discussion over how to operationalize. Lorraine notes that affiliate involvement is a high bar. Gora: Perhaps it just has to be more than one realm. Ken: Do we want to hold up a project on this basis? Wayne mentions the whole binary structure is odd. Paul: We have affiliates all over the planet that are the realms; US is the only realm without an affiliate. Realm is a jurisdictional space. We don't approve affiliate realm-specific materials. We only approve universal and US items. Who has the authority to determine universal realm? Lorraine: HL7 international develops international content by default. Question over whether we really need additional information on the PSS. Freida: Do we want any clarification in 6.b.? Melva notes that universal applicability can be noted in the needs and scope sections. It's not just implementers that make something universal; sometimes it's requirements. Paul: We're gathering information about applicability; someone from the universal space should be contributing/reviewing.
- MOTION: Based on this discussion, we do not recommend a change in 2.c., but add the sentence in 6.b. (Universal projects may include representation from more than one realm as defined in section 2.c.). : Freida/Andy
- Wayne notes that the word "may" makes this optional. We should ask people for additional information.
- MOTION withdrawn by Freida.
- MOTION to add instructions to provide justification of realm selection in 6.b.: Wayne/Gora
- VOTE: All in favor
- TSC suggested there should be review/approval by at least one affiliate for universal realm projects. Discussion over how to operationalize. Lorraine notes that affiliate involvement is a high bar. Gora: Perhaps it just has to be more than one realm. Ken: Do we want to hold up a project on this basis? Wayne mentions the whole binary structure is odd. Paul: We have affiliates all over the planet that are the realms; US is the only realm without an affiliate. Realm is a jurisdictional space. We don't approve affiliate realm-specific materials. We only approve universal and US items. Who has the authority to determine universal realm? Lorraine: HL7 international develops international content by default. Question over whether we really need additional information on the PSS. Freida: Do we want any clarification in 6.b.? Melva notes that universal applicability can be noted in the needs and scope sections. It's not just implementers that make something universal; sometimes it's requirements. Paul: We're gathering information about applicability; someone from the universal space should be contributing/reviewing.
- 2017 PSS Update - need input from TSC (Freida)
- Adjourned at 11:57 a.m. Eastern
Next Steps
Actions (Include Owner, Action Item, and due date)
| |||
Next Meeting/Preliminary Agenda Items |
© 2016 Health Level Seven® International. All rights reserved.