Difference between revisions of "2015-03-09 TSC Call Agenda"

From HL7 TSC
Jump to navigation Jump to search
Line 58: Line 58:
 
|.||                              ||.||Karen Van Hentenryck ||.||obs3 ||.||
 
|.||                              ||.||Karen Van Hentenryck ||.||obs3 ||.||
 
|-
 
|-
 +
|.||                              ||.||Brian Pech ||.||obs3 ||.||
 +
|-
 +
|.||                              ||.||Frank Oemig ||.||obs3 ||.||
 +
|-
 +
 
|colspan="3" style="background:#f0f0f0;"|
 
|colspan="3" style="background:#f0f0f0;"|
 
|}
 
|}
Line 84: Line 89:
 
#Approval items for this week requiring discussion:
 
#Approval items for this week requiring discussion:
 
#* [http://gforge.hl7.org/gf/download/docmanfileversion/8592/12896/TSC%20Approval%20List%20for%202015%20May%20Ballot%20Cycle%20with%20recommendations.doc Ballot Approvals for May2015] using new [http://gforge.hl7.org/gf/download/docmanfileversion/8603/12933/Naming%20Conventions%2020150227%202.docx Naming Conventions] - '''[20 minutes]''' with questions to consider:
 
#* [http://gforge.hl7.org/gf/download/docmanfileversion/8592/12896/TSC%20Approval%20List%20for%202015%20May%20Ballot%20Cycle%20with%20recommendations.doc Ballot Approvals for May2015] using new [http://gforge.hl7.org/gf/download/docmanfileversion/8603/12933/Naming%20Conventions%2020150227%202.docx Naming Conventions] - '''[20 minutes]''' with questions to consider:
#**Do we allow abbreviations in the document title? Motion: If the abbreviation is defined in the HL7 glossary, we may use the abbreviation in the title.
+
#**Do we allow abbreviations in the document title? Motion by Tony Julian: If the abbreviation is defined in the HL7 glossary, we may use the abbreviation in the title.
#**Do we use the word "Informatvie" in the naming convention? Motion: Informative is a word that would be included in the name of the ballot.
+
#**Do we use the word "Informatvie" in the naming convention? Motion by Tony Julian: Informative is a word that would be included in the name of the ballot.
#**How do we harmonize the naming convention with the FHIR naming standard of using the WG identifier before the product name? Motion: FHIR is expected to be part of the name, so identifying it as the WG in the name is unnecessary.
+
#**How do we harmonize the naming convention with the FHIR naming standard of using the WG identifier before the product name? Motion by Tony Julian: FHIR is expected to be part of the name, so identifying it as the WG in the name is unnecessary.
#**Do we need both specification and standard? Motion: If standard and specification are the same, both are not needed; but if one provides further refinement to the description, both may be used as appropriate.
+
#**Do we need both specification and standard? Motion by Lorraine Constable: If standard and specification are the same, both are not needed; but if one provides further refinement to the description, both may be used as appropriate.
 
#*[http://gforge.hl7.org/gf/download/trackeritem/5807/12893/HL7_PSS_FHIR_Balloting_Process_Pilot_20150227.docx Project Approval Request] of ''FHIR Balloting Process Pilot'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=1177 Project Insight 1177] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=5807&start=0 TSC Tracker 5807] - '''[5 minutes]'''
 
#*[http://gforge.hl7.org/gf/download/trackeritem/5807/12893/HL7_PSS_FHIR_Balloting_Process_Pilot_20150227.docx Project Approval Request] of ''FHIR Balloting Process Pilot'' at [http://www.hl7.org/special/Committees/projman/searchableProjectIndex.cfm?action=edit&ProjectNumber=1177 Project Insight 1177] and [http://gforge.hl7.org/gf/project/tsc/tracker/?action=TrackerItemEdit&tracker_item_id=5807&start=0 TSC Tracker 5807] - '''[5 minutes]'''
 
#**Naming issue for FHIR Balloting Process Pilot (Austin)
 
#**Naming issue for FHIR Balloting Process Pilot (Austin)
Line 102: Line 107:
 
#Discussion topics:
 
#Discussion topics:
 
#*[http://gforge.hl7.org/gf/download/docmanfileversion/8576/12828/Refactoring%20HL7-v2%202.docx Refactoring HL7 V2 Product Family] proposal - Brian Pech - '''[15 minutes]'''
 
#*[http://gforge.hl7.org/gf/download/docmanfileversion/8576/12828/Refactoring%20HL7-v2%202.docx Refactoring HL7 V2 Product Family] proposal - Brian Pech - '''[15 minutes]'''
#*Balloting Consistency (Calvin, Lynn, Lisa, Karen)
+
#*Balloting Consistency (Calvin, Lynn, Lisa, Karen) '''[10 minutes]'''
 
#*Attachments Collaboration Project (Paul) - Deferred to 2015-03-16
 
#*Attachments Collaboration Project (Paul) - Deferred to 2015-03-16
 
#*HSI WG Content Issue (Lorraine) - Deferred to 2015-03-16
 
#*HSI WG Content Issue (Lorraine) - Deferred to 2015-03-16

Revision as of 13:35, 9 March 2015

TSC Agenda/Minutes

Meeting Info/Attendees

Standing Conference Calls

TSC will hold a Conference Call at 11AM Eastern time, each Monday except during scheduled face-to-face Working Group Meetings unless otherwise noted at TSC_Minutes_and_Agendas.

GoToMeeting at https://global.gotomeeting.com/join/426505829 using VOIP
For those without access to microphone/speakers:
US: +1 (224)501-3318
Canada: +1 (647)497-9379
Italy: +39 0 230 57 81 80
Access Code: 426-505-829
GoToMeeting ID: 426-505-829
HL7 TSC Meeting Minutes

Location: call 770-657-9270 using code 985371#
NEW GoToMeeting ID: 426-505-829

Date: 2015-03-09
Time: 11:00 AM U.S. Eastern
Facilitator: Ken McCaslin Note taker(s): Anne Wizauer
Quorum = chair + 5 including 2 SD represented yes/no
Chair/CTO ArB International Affiliate Rep Ad-Hoc
. Ken McCaslin . Tony Julian . Jean Duteau .
. John Quinn . Lorraine Constable . Giorgio Cangioli .
Domain Experts Foundation and Technology Structure and Semantic Design Technical and Support Services
. Melva Peters Regrets Woody Beeler . Calvin Beebe . Freida Hall
. John Roberts . Paul Knapp . Pat van Dyke . Andy Stechishin
. Russ Hamm . .
ex officio Invited Guests Observers HL7 Staff
. Stan Huff (HL7 Chair) w/vote . Lynn Laakso . obs1 . Anne Wizauer
. Chuck Jaffe (CEO) vote . Lisa Nelson . obs2 .
. . Karen Van Hentenryck . obs3 .
. . Brian Pech . obs3 .
. . Frank Oemig . obs3 .

Agenda

Housekeeping

  1. Introduction of visitors (including declaration of interests)
  2. Agenda review and approval -
  3. Approve Minutes of 2015-03-02 TSC Call Agenda

Governance

  1. Approval items:
  2. Discussion topics:

Management

  1. Review action items
    • Anne to add invitation to participate in comment period for FHIR Balloting Process Pilot in the update from the TSC next week (Austin to provide link).
    • All: review Ballot Approval List before next call
  2. Items from 2015-02-27 e-Vote Referred for Discussion (T3SD):
  3. Approval items for this week requiring discussion:
    • Ballot Approvals for May2015 using new Naming Conventions - [20 minutes] with questions to consider:
      • Do we allow abbreviations in the document title? Motion by Tony Julian: If the abbreviation is defined in the HL7 glossary, we may use the abbreviation in the title.
      • Do we use the word "Informatvie" in the naming convention? Motion by Tony Julian: Informative is a word that would be included in the name of the ballot.
      • How do we harmonize the naming convention with the FHIR naming standard of using the WG identifier before the product name? Motion by Tony Julian: FHIR is expected to be part of the name, so identifying it as the WG in the name is unnecessary.
      • Do we need both specification and standard? Motion by Lorraine Constable: If standard and specification are the same, both are not needed; but if one provides further refinement to the description, both may be used as appropriate.
    • Project Approval Request of FHIR Balloting Process Pilot at Project Insight 1177 and TSC Tracker 5807 - [5 minutes]
      • Naming issue for FHIR Balloting Process Pilot (Austin)
  4. Approval items for this week's e-vote:
  5. Approval items from last week's e-vote - approved X/X/X with X voting:
  6. Discussion topics:
    • Refactoring HL7 V2 Product Family proposal - Brian Pech - [15 minutes]
    • Balloting Consistency (Calvin, Lynn, Lisa, Karen) [10 minutes]
    • Attachments Collaboration Project (Paul) - Deferred to 2015-03-16
    • HSI WG Content Issue (Lorraine) - Deferred to 2015-03-16
    • WG Co-Chairs Not Working Within Process (Paul, John Roberts, Melva, Pat) - Deferred to 2015-03-16
    • FHIR Ballot Reonciliation Process (Lorraine/Paul) - Deferred to 2015-03-16
  1. Reports: (attach written reports below from Steering Divisions et al.)
  2. Open Issues List

Minutes

Minutes/Conclusions Reached:

Next Steps

Actions (Include Owner, Action Item, and due date)
  • .
Next Meeting/Preliminary Agenda Items


© 2014 Health Level Seven® International. All rights reserved.